{"id":"https://openalex.org/W3027019804","doi":"https://doi.org/10.7148/2020-0287","title":"Influence Of Company Sizes In Adapted Master Production Scheduling For Improving Human Working Conditions","display_name":"Influence Of Company Sizes In Adapted Master Production Scheduling For Improving Human Working Conditions","publication_year":2020,"publication_date":"2020-05-22","ids":{"openalex":"https://openalex.org/W3027019804","doi":"https://doi.org/10.7148/2020-0287","mag":"3027019804"},"language":"en","primary_location":{"id":"doi:10.7148/2020-0287","is_oa":false,"landing_page_url":"https://doi.org/10.7148/2020-0287","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ECMS 2020 Proceedings edited by Mike Steglich, Christian Mueller, Gaby Neumann, Mathias Walther","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5038644508","display_name":"Marco Trost","orcid":"https://orcid.org/0000-0001-9185-3209"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Marco Trost","raw_affiliation_strings":[],"affiliations":[]},{"author_position":"middle","author":{"id":"https://openalex.org/A5036046752","display_name":"Thorsten Claus","orcid":"https://orcid.org/0000-0003-1862-181X"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Thorsten Claus","raw_affiliation_strings":[],"affiliations":[]},{"author_position":"last","author":{"id":"https://openalex.org/A5037525351","display_name":"Frank Herrmann","orcid":"https://orcid.org/0000-0002-7198-4989"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Frank Herrmann","raw_affiliation_strings":[],"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5038644508"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.1783,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.56948159,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":93},"biblio":{"volume":null,"issue":null,"first_page":"287","last_page":"293"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9764999747276306,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9764999747276306,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9739999771118164,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9312000274658203,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5784407258033752},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.561286449432373},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5515336394309998},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.4068785607814789},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.35591787099838257},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18880608677864075},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.18591946363449097}],"concepts":[{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5784407258033752},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.561286449432373},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5515336394309998},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.4068785607814789},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.35591787099838257},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18880608677864075},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.18591946363449097},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.7148/2020-0287","is_oa":false,"landing_page_url":"https://doi.org/10.7148/2020-0287","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ECMS 2020 Proceedings edited by Mike Steglich, Christian Mueller, Gaby Neumann, Mathias Walther","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.5299999713897705,"id":"https://metadata.un.org/sdg/8","display_name":"Decent work and economic growth"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W4391375266","https://openalex.org/W2748952813","https://openalex.org/W2390279801","https://openalex.org/W2358668433","https://openalex.org/W4396701345","https://openalex.org/W2376932109","https://openalex.org/W4401161891","https://openalex.org/W2337755673","https://openalex.org/W1470192148","https://openalex.org/W2369224372"],"abstract_inverted_index":null,"counts_by_year":[{"year":2021,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
