{"id":"https://openalex.org/W7154572850","doi":"https://doi.org/10.48550/arxiv.2604.13603","title":"On the Design of Stochastic Electricity Auctions","display_name":"On the Design of Stochastic Electricity Auctions","publication_year":2026,"publication_date":"2026-04-15","ids":{"openalex":"https://openalex.org/W7154572850","doi":"https://doi.org/10.48550/arxiv.2604.13603"},"language":null,"primary_location":{"id":"doi:10.48550/arxiv.2604.13603","is_oa":true,"landing_page_url":"https://doi.org/10.48550/arxiv.2604.13603","pdf_url":null,"source":{"id":"https://openalex.org/S4306400194","display_name":"arXiv (Cornell University)","issn_l":null,"issn":null,"is_oa":true,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I205783295","host_organization_name":"Cornell University","host_organization_lineage":["https://openalex.org/I205783295"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"article"},"type":"preprint","indexed_in":["datacite"],"open_access":{"is_oa":true,"oa_status":"green","oa_url":"https://doi.org/10.48550/arxiv.2604.13603","any_repository_has_fulltext":true},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5032667383","display_name":"Thomas H\u00fcbner","orcid":"https://orcid.org/0009-0002-9837-6606"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"H\u00fcbner, Thomas","raw_affiliation_strings":[],"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":1,"corresponding_author_ids":["https://openalex.org/A5032667383"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":null,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":null,"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.8899999856948853,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.8899999856948853,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11182","display_name":"Auction Theory and Applications","score":0.04749999940395355,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.010200000368058681,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/common-value-auction","display_name":"Common value auction","score":0.6868000030517578},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.6341000199317932},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.535099983215332},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.4903999865055084},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.3905999958515167},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.3885999917984009},{"id":"https://openalex.org/keywords/electricity-system","display_name":"Electricity system","score":0.37929999828338623},{"id":"https://openalex.org/keywords/state","display_name":"State (computer science)","score":0.3522000014781952}],"concepts":[{"id":"https://openalex.org/C163239763","wikidata":"https://www.wikidata.org/wiki/Q5153637","display_name":"Common value auction","level":2,"score":0.6868000030517578},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.6341000199317932},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.535099983215332},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.4903999865055084},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.42570000886917114},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3986000120639801},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.3905999958515167},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.3885999917984009},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.37929999828338623},{"id":"https://openalex.org/C2992120494","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electricity system","level":4,"score":0.37929999828338623},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.3790999948978424},{"id":"https://openalex.org/C48103436","wikidata":"https://www.wikidata.org/wiki/Q599031","display_name":"State (computer science)","level":2,"score":0.3522000014781952},{"id":"https://openalex.org/C8735168","wikidata":"https://www.wikidata.org/wiki/Q61637704","display_name":"Offshore wind power","level":3,"score":0.34709998965263367},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3158999979496002},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.3100999891757965},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.30820000171661377},{"id":"https://openalex.org/C137631369","wikidata":"https://www.wikidata.org/wiki/Q7617831","display_name":"Stochastic programming","level":2,"score":0.3066999912261963},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.29679998755455017},{"id":"https://openalex.org/C2777618391","wikidata":"https://www.wikidata.org/wiki/Q1483757","display_name":"Solar power","level":3,"score":0.29510000348091125},{"id":"https://openalex.org/C144237770","wikidata":"https://www.wikidata.org/wiki/Q747534","display_name":"Mathematical economics","level":1,"score":0.275299996137619},{"id":"https://openalex.org/C149782125","wikidata":"https://www.wikidata.org/wiki/Q160039","display_name":"Econometrics","level":1,"score":0.2703999876976013},{"id":"https://openalex.org/C2779304628","wikidata":"https://www.wikidata.org/wiki/Q3503480","display_name":"Face (sociological concept)","level":2,"score":0.2531999945640564},{"id":"https://openalex.org/C2983129042","wikidata":"https://www.wikidata.org/wiki/Q870344","display_name":"Electricity price","level":3,"score":0.25130000710487366}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.48550/arxiv.2604.13603","is_oa":true,"landing_page_url":"https://doi.org/10.48550/arxiv.2604.13603","pdf_url":null,"source":{"id":"https://openalex.org/S4306400194","display_name":"arXiv (Cornell University)","issn_l":null,"issn":null,"is_oa":true,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I205783295","host_organization_name":"Cornell University","host_organization_lineage":["https://openalex.org/I205783295"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":null,"raw_source_name":null,"raw_type":"article"}],"best_oa_location":{"id":"doi:10.48550/arxiv.2604.13603","is_oa":true,"landing_page_url":"https://doi.org/10.48550/arxiv.2604.13603","pdf_url":null,"source":{"id":"https://openalex.org/S4306400194","display_name":"arXiv (Cornell University)","issn_l":null,"issn":null,"is_oa":true,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I205783295","host_organization_name":"Cornell University","host_organization_lineage":["https://openalex.org/I205783295"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"article"},"sustainable_development_goals":[{"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7","score":0.7370449900627136}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":[],"abstract_inverted_index":{"Electricity":[0],"is":[1],"typically":[2],"traded":[3],"in":[4,19,175],"day-ahead":[5,41],"auctions":[6],"because":[7],"many":[8,128],"power":[9,28],"system":[10,58],"decisions,":[11],"such":[12,140],"as":[13],"unit":[14],"commitment,":[15],"must":[16],"be":[17,46,66,86,109,163],"made":[18],"advance.":[20],"However,":[21],"when":[22],"wind":[23,173],"and":[24,56,93,142,165],"solar":[25],"generators":[26],"sell":[27],"one":[29],"day":[30],"ahead,":[31],"they":[32],"face":[33],"uncertainty":[34,44,74],"about":[35],"their":[36],"actual":[37],"production.":[38],"In":[39,78],"current":[40],"auctions,":[42],"this":[43,63],"cannot":[45],"directly":[47],"communicated,":[48],"leading":[49],"to":[50,134,149],"inefficient":[51],"use":[52],"of":[53,71,95,102,118,121,151,171],"renewable":[54],"energy":[55],"suboptimal":[57],"decisions.":[59],"We":[60,138],"show":[61,143],"how":[62,159],"problem":[64],"can":[65,162],"addressed":[67],"using":[68,167],"the":[69,91,100,103,119,122,145,176],"concept":[70],"equilibrium":[72],"under":[73],"from":[75],"microeconomic":[76],"theory.":[77],"particular,":[79],"we":[80,157],"demonstrate":[81],"that":[82,144],"electricity":[83],"contracts":[84],"should":[85],"conditioned":[87],"not":[88],"only":[89],"on":[90,99],"time":[92],"location":[94],"delivery,":[96],"but":[97],"also":[98],"state":[101,120],"world":[104],"(e.g.,":[105],"whether":[106],"it":[107],"will":[108],"windy":[110],"or":[111],"calm).":[112],"This":[113],"requires":[114],"a":[115,168],"precise":[116],"definition":[117],"world.":[123],"Since":[124],"there":[125],"are":[126,132],"infinitely":[127],"possible":[129],"definitions,":[130],"criteria":[131,141],"needed":[133],"select":[135],"among":[136],"them.":[137],"develop":[139],"resulting":[146],"states":[147,161],"correspond":[148],"solutions":[150],"an":[152],"optimal":[153],"partitioning":[154],"problem.":[155],"Finally,":[156],"illustrate":[158],"these":[160],"computed":[164],"interpreted":[166],"case":[169],"study":[170],"offshore":[172],"farms":[174],"European":[177],"North":[178],"Sea.":[179]},"counts_by_year":[],"updated_date":"2026-04-17T06:04:52.305304","created_date":"2026-04-17T00:00:00"}
