{"id":"https://openalex.org/W2884405080","doi":"https://doi.org/10.3233/jifs-169775","title":"A multi-stage hybrid artificial intelligence based optimal solution for energy storage integrated mixed generation unit commitment problem","display_name":"A multi-stage hybrid artificial intelligence based optimal solution for energy storage integrated mixed generation unit commitment problem","publication_year":2018,"publication_date":"2018-07-24","ids":{"openalex":"https://openalex.org/W2884405080","doi":"https://doi.org/10.3233/jifs-169775","mag":"2884405080"},"language":"en","primary_location":{"id":"doi:10.3233/jifs-169775","is_oa":false,"landing_page_url":"https://doi.org/10.3233/jifs-169775","pdf_url":null,"source":{"id":"https://openalex.org/S179157397","display_name":"Journal of Intelligent & Fuzzy Systems","issn_l":"1064-1246","issn":["1064-1246","1875-8967"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310318577","host_organization_name":"IOS Press","host_organization_lineage":["https://openalex.org/P4310318577"],"host_organization_lineage_names":["IOS Press"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Journal of Intelligent &amp; Fuzzy Systems","raw_type":"journal-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5101665273","display_name":"Shubham Tiwari","orcid":"https://orcid.org/0000-0002-3175-1283"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Shubham Tiwari","raw_affiliation_strings":["Department of Electrical Engineering, IET, Lucknow, UP, India"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, IET, Lucknow, UP, India","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5007080680","display_name":"Bharti Dwivedi","orcid":"https://orcid.org/0000-0002-4856-6391"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Bharti Dwivedi","raw_affiliation_strings":["Department of Electrical Engineering, IET, Lucknow, UP, India"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, IET, Lucknow, UP, India","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5030665333","display_name":"Mayank Dave","orcid":"https://orcid.org/0000-0003-4748-0753"},"institutions":[{"id":"https://openalex.org/I26604189","display_name":"Shiv Nadar University","ror":"https://ror.org/05aqahr97","country_code":"IN","type":"education","lineage":["https://openalex.org/I26604189"]}],"countries":["IN"],"is_corresponding":false,"raw_author_name":"M.P. Dave","raw_affiliation_strings":["Department of Electrical Engineering, SNU, Dadri, Gautam Buddha Nagar, UP, India"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, SNU, Dadri, Gautam Buddha Nagar, UP, India","institution_ids":["https://openalex.org/I26604189"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5101665273"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.5518,"has_fulltext":false,"cited_by_count":6,"citation_normalized_percentile":{"value":0.66875255,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":96},"biblio":{"volume":"35","issue":"5","first_page":"4909","last_page":"4919"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11007","display_name":"Hybrid Renewable Energy Systems","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9977999925613403,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.7036098837852478},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6719119548797607},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5088558197021484},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.5052338242530823},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.4681456685066223},{"id":"https://openalex.org/keywords/energy-storage","display_name":"Energy storage","score":0.46456706523895264},{"id":"https://openalex.org/keywords/process-engineering","display_name":"Process engineering","score":0.4128398895263672},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.1754918396472931},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.17501792311668396},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.14913657307624817},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.08455637097358704},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.07713082432746887}],"concepts":[{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.7036098837852478},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6719119548797607},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5088558197021484},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.5052338242530823},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.4681456685066223},{"id":"https://openalex.org/C73916439","wikidata":"https://www.wikidata.org/wiki/Q837718","display_name":"Energy storage","level":3,"score":0.46456706523895264},{"id":"https://openalex.org/C21880701","wikidata":"https://www.wikidata.org/wiki/Q2144042","display_name":"Process engineering","level":1,"score":0.4128398895263672},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.1754918396472931},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.17501792311668396},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.14913657307624817},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.08455637097358704},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.07713082432746887},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.3233/jifs-169775","is_oa":false,"landing_page_url":"https://doi.org/10.3233/jifs-169775","pdf_url":null,"source":{"id":"https://openalex.org/S179157397","display_name":"Journal of Intelligent & Fuzzy Systems","issn_l":"1064-1246","issn":["1064-1246","1875-8967"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310318577","host_organization_name":"IOS Press","host_organization_lineage":["https://openalex.org/P4310318577"],"host_organization_lineage_names":["IOS Press"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Journal of Intelligent &amp; Fuzzy Systems","raw_type":"journal-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.8199999928474426,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":19,"referenced_works":["https://openalex.org/W1969364949","https://openalex.org/W1972545197","https://openalex.org/W1977066169","https://openalex.org/W2014084439","https://openalex.org/W2049626702","https://openalex.org/W2049642529","https://openalex.org/W2077512811","https://openalex.org/W2080551469","https://openalex.org/W2087601600","https://openalex.org/W2088295937","https://openalex.org/W2104044232","https://openalex.org/W2115593938","https://openalex.org/W2129500603","https://openalex.org/W2131680865","https://openalex.org/W2168485205","https://openalex.org/W2190474077","https://openalex.org/W2190914162","https://openalex.org/W2224031387","https://openalex.org/W2606238166"],"related_works":["https://openalex.org/W1974955413","https://openalex.org/W3017124762","https://openalex.org/W3097919110","https://openalex.org/W2049251811","https://openalex.org/W2021194995","https://openalex.org/W4221107878","https://openalex.org/W2140602680","https://openalex.org/W4220683285","https://openalex.org/W4200353840","https://openalex.org/W2893424137"],"abstract_inverted_index":{"Inclusion":[0],"of":[1,19,52,79,125,147],"renewable":[2,53,86,148],"energy":[3,87],"resources":[4,9,149],"with":[5,85,91,131,157],"existing":[6],"conventional":[7,80],"generation":[8,20,54,82,89],"summons":[10],"revisit":[11],"to":[12,50,69,104,110,120,145],"optimization":[13],"methods":[14],"used":[15],"in":[16,26,66,83],"the":[17,71,75,111,121],"field":[18],"scheduling.":[21],"The":[22,113,138],"Unit":[23,76,122],"Commitment":[24,77,123],"problem":[25,32,78,124],"itself":[27],"is":[28,102],"a":[29,106,158],"highly":[30],"convoluted":[31],"governed":[33],"by":[34,57,154],"complex":[35],"time":[36],"varying":[37],"constraints.":[38],"It":[39],"gets":[40,142,151],"even":[41],"more":[42],"complicated":[43],"when":[44,129],"additional":[45],"constraints":[46],"are":[47],"added":[48],"due":[49,144],"inclusion":[51],"backed":[55],"up":[56],"battery":[58,132,156],"storage":[59],"system.":[60],"An":[61],"effort":[62],"has":[63],"been":[64],"made":[65],"this":[67],"paper":[68],"improve":[70],"model":[72],"for":[73],"solving":[74],"thermal":[81,127],"conjunction":[84],"based":[88,97],"system":[90],"storage.":[92],"A":[93],"hybrid":[94],"artificial":[95],"intelligence":[96],"multiple":[98],"stage":[99],"solution":[100,109,119],"methodology":[101,115],"envisaged":[103],"provide":[105],"techno-economical":[107],"optimal":[108],"problem.":[112],"proposed":[114],"provides":[116],"economically":[117],"better":[118],"ten":[126],"generators":[128],"integrated":[130],"supported":[133],"wind":[134],"and":[135],"solar":[136],"generation.":[137],"overall":[139],"operational":[140],"cost":[141],"reduced":[143,153],"integration":[146],"which":[150],"further":[152],"incorporating":[155],"novel":[159],"optimized":[160],"charge/discharge":[161],"scheduling":[162],"technique.":[163]},"counts_by_year":[{"year":2024,"cited_by_count":2},{"year":2022,"cited_by_count":1},{"year":2021,"cited_by_count":1},{"year":2019,"cited_by_count":1},{"year":2018,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
