{"id":"https://openalex.org/W6907700493","doi":"https://doi.org/10.23773/2022_12","title":"Master production scheduling with scenario-based capacity-load factors in a rolling planning environment","display_name":"Master production scheduling with scenario-based capacity-load factors in a rolling planning environment","publication_year":2022,"publication_date":"2022-01-01","ids":{"openalex":"https://openalex.org/W6907700493","doi":"https://doi.org/10.23773/2022_12"},"language":"en","primary_location":{"id":"pmh:oai:econstor.eu:10419/297204","is_oa":true,"landing_page_url":"https://hdl.handle.net/10419/297204","pdf_url":null,"source":{"id":"https://openalex.org/S4306401696","display_name":"Econstor (Econstor)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"","raw_type":"doc-type:article"},"type":"article","indexed_in":[],"open_access":{"is_oa":true,"oa_status":"green","oa_url":"https://hdl.handle.net/10419/297204","any_repository_has_fulltext":true},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Englberger, Julian","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Englberger, Julian","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"middle","author":{"id":null,"display_name":"Herrmann, Frank","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Herrmann, Frank","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"last","author":{"id":null,"display_name":"Manitz, Michael","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Manitz, Michael","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":3,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.1355,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.58893267,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":91,"max":95},"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":true,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.47029998898506165,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.47029998898506165,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12177","display_name":"Resource-Constrained Project Scheduling","score":0.3763999938964844,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.04390000179409981,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/tardiness","display_name":"Tardiness","score":0.8652999997138977},{"id":"https://openalex.org/keywords/production-planning","display_name":"Production planning","score":0.6603000164031982},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6319000124931335},{"id":"https://openalex.org/keywords/production-control","display_name":"Production control","score":0.5504000186920166},{"id":"https://openalex.org/keywords/time-horizon","display_name":"Time horizon","score":0.5148000121116638},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.5048999786376953},{"id":"https://openalex.org/keywords/capacity-planning","display_name":"Capacity planning","score":0.38909998536109924},{"id":"https://openalex.org/keywords/master/slave","display_name":"Master/slave","score":0.3709999918937683},{"id":"https://openalex.org/keywords/dynamic-priority-scheduling","display_name":"Dynamic priority scheduling","score":0.3677000105381012},{"id":"https://openalex.org/keywords/stochastic-modelling","display_name":"Stochastic modelling","score":0.3646000027656555}],"concepts":[{"id":"https://openalex.org/C2778047078","wikidata":"https://www.wikidata.org/wiki/Q82299449","display_name":"Tardiness","level":4,"score":0.8652999997138977},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.6603000164031982},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6319000124931335},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5609999895095825},{"id":"https://openalex.org/C2780682718","wikidata":"https://www.wikidata.org/wiki/Q16321575","display_name":"Production control","level":3,"score":0.5504000186920166},{"id":"https://openalex.org/C28761237","wikidata":"https://www.wikidata.org/wiki/Q7805321","display_name":"Time horizon","level":2,"score":0.5148000121116638},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.5048999786376953},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.4616999924182892},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.46160000562667847},{"id":"https://openalex.org/C2781007418","wikidata":"https://www.wikidata.org/wiki/Q1456934","display_name":"Capacity planning","level":2,"score":0.38909998536109924},{"id":"https://openalex.org/C20454292","wikidata":"https://www.wikidata.org/wiki/Q735523","display_name":"Master/slave","level":2,"score":0.3709999918937683},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.3677000105381012},{"id":"https://openalex.org/C127491075","wikidata":"https://www.wikidata.org/wiki/Q7617825","display_name":"Stochastic modelling","level":2,"score":0.3646000027656555},{"id":"https://openalex.org/C137631369","wikidata":"https://www.wikidata.org/wiki/Q7617831","display_name":"Stochastic programming","level":2,"score":0.36059999465942383},{"id":"https://openalex.org/C2781089630","wikidata":"https://www.wikidata.org/wiki/Q21856745","display_name":"Realization (probability)","level":2,"score":0.34869998693466187},{"id":"https://openalex.org/C3019208289","wikidata":"https://www.wikidata.org/wiki/Q56612115","display_name":"Due date","level":3,"score":0.337799996137619},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3328999876976013},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.32919999957084656},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.3167000114917755},{"id":"https://openalex.org/C167523981","wikidata":"https://www.wikidata.org/wiki/Q1365335","display_name":"Material requirements planning","level":3,"score":0.31299999356269836},{"id":"https://openalex.org/C37404715","wikidata":"https://www.wikidata.org/wiki/Q380679","display_name":"Dynamic programming","level":2,"score":0.30869999527931213},{"id":"https://openalex.org/C2781039887","wikidata":"https://www.wikidata.org/wiki/Q1391724","display_name":"Factor (programming language)","level":2,"score":0.29789999127388},{"id":"https://openalex.org/C41045048","wikidata":"https://www.wikidata.org/wiki/Q202843","display_name":"Linear programming","level":2,"score":0.2946999967098236},{"id":"https://openalex.org/C139968098","wikidata":"https://www.wikidata.org/wiki/Q3055454","display_name":"Development environment","level":2,"score":0.28029999136924744},{"id":"https://openalex.org/C8272713","wikidata":"https://www.wikidata.org/wiki/Q176737","display_name":"Stochastic process","level":2,"score":0.2784000039100647},{"id":"https://openalex.org/C158336966","wikidata":"https://www.wikidata.org/wiki/Q3074426","display_name":"Flow shop scheduling","level":4,"score":0.27709999680519104},{"id":"https://openalex.org/C2780009758","wikidata":"https://www.wikidata.org/wiki/Q6804172","display_name":"Measure (data warehouse)","level":2,"score":0.26910001039505005},{"id":"https://openalex.org/C18762648","wikidata":"https://www.wikidata.org/wiki/Q42213","display_name":"Work (physics)","level":2,"score":0.26660001277923584},{"id":"https://openalex.org/C177264268","wikidata":"https://www.wikidata.org/wiki/Q1514741","display_name":"Set (abstract data type)","level":2,"score":0.2632000148296356},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.26159998774528503},{"id":"https://openalex.org/C2776043813","wikidata":"https://www.wikidata.org/wiki/Q1759113","display_name":"Batch production","level":2,"score":0.2524000108242035},{"id":"https://openalex.org/C91575142","wikidata":"https://www.wikidata.org/wiki/Q1971426","display_name":"Optimal control","level":2,"score":0.24869999289512634},{"id":"https://openalex.org/C2781468064","wikidata":"https://www.wikidata.org/wiki/Q1267117","display_name":"Lead time","level":2,"score":0.24199999868869781},{"id":"https://openalex.org/C135909481","wikidata":"https://www.wikidata.org/wiki/Q17092930","display_name":"Production manager","level":3,"score":0.24130000174045563},{"id":"https://openalex.org/C82753439","wikidata":"https://www.wikidata.org/wiki/Q1419090","display_name":"Industrial production","level":2,"score":0.2363000065088272},{"id":"https://openalex.org/C107464732","wikidata":"https://www.wikidata.org/wiki/Q235781","display_name":"Adaptive control","level":3,"score":0.23180000483989716},{"id":"https://openalex.org/C174998907","wikidata":"https://www.wikidata.org/wiki/Q357662","display_name":"Work in process","level":2,"score":0.22630000114440918},{"id":"https://openalex.org/C170131372","wikidata":"https://www.wikidata.org/wiki/Q7617811","display_name":"Stochastic control","level":3,"score":0.22310000658035278},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.2207999974489212},{"id":"https://openalex.org/C77405623","wikidata":"https://www.wikidata.org/wiki/Q598451","display_name":"System dynamics","level":2,"score":0.21879999339580536}],"mesh":[],"locations_count":1,"locations":[{"id":"pmh:oai:econstor.eu:10419/297204","is_oa":true,"landing_page_url":"https://hdl.handle.net/10419/297204","pdf_url":null,"source":{"id":"https://openalex.org/S4306401696","display_name":"Econstor (Econstor)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"","raw_type":"doc-type:article"}],"best_oa_location":{"id":"pmh:oai:econstor.eu:10419/297204","is_oa":true,"landing_page_url":"https://hdl.handle.net/10419/297204","pdf_url":null,"source":{"id":"https://openalex.org/S4306401696","display_name":"Econstor (Econstor)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"repository"},"license":"cc-by","license_id":"https://openalex.org/licenses/cc-by","version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"","raw_type":"doc-type:article"},"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9","score":0.40943145751953125}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":[],"abstract_inverted_index":{"This":[0],"paper":[1],"proposes":[2],"two":[3],"stochastic":[4,101,121],"programming":[5],"models":[6,59,102,122],"for":[7,113],"master":[8,47,86,114],"production":[9,21,48,63,87,115,128],"scheduling":[10,88],"with":[11,23,103],"capacity-load":[12,38,78],"factor":[13,39],"scenarios.":[14],"In":[15,117],"contrast":[16],"to":[17,107],"other":[18],"work":[19],"on":[20],"planning":[22,64],"load-dependent":[24],"lead":[25],"times":[26],"or":[27],"dynamic":[28],"capacity":[29,112,132],"loads,":[30],"we":[31,56,83,98],"iteratively":[32],"build":[33],"a":[34,51,61],"set":[35],"of":[36,45,94,127],"realistic":[37],"scenarios":[40],"by":[41,131],"simulating":[42],"the":[43,46,58,76,85,92,95,100,104,109,120,125],"realization":[44],"schedules":[49],"in":[50,71],"rolling":[52],"horizon":[53],"environment.":[54],"Therefore,":[55],"integrate":[57],"into":[60],"hierarchical":[62],"and":[65,74],"control":[66],"system":[67],"that":[68],"is":[69],"common":[70,105],"industrial":[72],"practice":[73],"measure":[75],"effective":[77],"factors.":[79],"With":[80],"these":[81],"factors,":[82],"resolve":[84],"problem.":[89],"Toa":[90],"evaluate":[91],"performance":[93],"proposed":[96],"models,":[97],"compare":[99],"approach":[106],"reduce":[108,124],"nominally":[110],"available":[111],"scheduling.":[116],"our":[118],"experiments,":[119],"significantly":[123],"tardiness":[126],"orders":[129],"caused":[130],"bottlenecks.":[133]},"counts_by_year":[{"year":2025,"cited_by_count":1}],"updated_date":"2026-06-11T09:08:48.828518","created_date":"2025-10-10T00:00:00"}
