{"id":"https://openalex.org/W4399253436","doi":"https://doi.org/10.1145/3660395.3660452","title":"Optimization Control Strategy for Side Demand Response Based on Spot Market Environment","display_name":"Optimization Control Strategy for Side Demand Response Based on Spot Market Environment","publication_year":2023,"publication_date":"2023-09-22","ids":{"openalex":"https://openalex.org/W4399253436","doi":"https://doi.org/10.1145/3660395.3660452"},"language":"en","primary_location":{"id":"doi:10.1145/3660395.3660452","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3660395.3660452","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 3rd Guangdong-Hong Kong-Macao Greater Bay Area Artificial Intelligence and Big Data Forum","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5064980556","display_name":"Ye Zhang","orcid":"https://orcid.org/0009-0005-8604-7188"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Ye Zhang","raw_affiliation_strings":["Liaoning Power Trading Center Co., Ltd, China"],"raw_orcid":"https://orcid.org/0009-0005-8604-7188","affiliations":[{"raw_affiliation_string":"Liaoning Power Trading Center Co., Ltd, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5101679195","display_name":"Dongzhe Wang","orcid":"https://orcid.org/0009-0000-4920-028X"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Dongzhe Wang","raw_affiliation_strings":["Department of Electrical Engineering, Northeast Electric Power University, China"],"raw_orcid":"https://orcid.org/0009-0000-4920-028X","affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Northeast Electric Power University, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5047564390","display_name":"Qingchun Li","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Qingchun Li","raw_affiliation_strings":["Liaoning Power Trading Center Co., Ltd, China"],"raw_orcid":"https://orcid.org/0009-0009-5717-8444","affiliations":[{"raw_affiliation_string":"Liaoning Power Trading Center Co., Ltd, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5082215292","display_name":"Nan Liu","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Nan Liu","raw_affiliation_strings":["Liaoning Power Trading Center Co., Ltd, China"],"raw_orcid":"https://orcid.org/0009-0007-7217-1975","affiliations":[{"raw_affiliation_string":"Liaoning Power Trading Center Co., Ltd, China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5110934661","display_name":"Zongqin Xiang","orcid":"https://orcid.org/0009-0000-0389-2233"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Ziwei Xiang","raw_affiliation_strings":["Department of Electrical Engineering, Northeast Electric Power University, China"],"raw_orcid":"https://orcid.org/0009-0000-0389-2233","affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Northeast Electric Power University, China","institution_ids":["https://openalex.org/I179060312"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":5,"corresponding_author_ids":["https://openalex.org/A5064980556"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.21704897,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"337","last_page":"341"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9976000189781189,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.991599977016449,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.6889828443527222},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6349523067474365},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.6321178674697876},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.6185370087623596},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6048024296760559},{"id":"https://openalex.org/keywords/solver","display_name":"Solver","score":0.5373393893241882},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.4732014834880829},{"id":"https://openalex.org/keywords/revenue","display_name":"Revenue","score":0.4646097719669342},{"id":"https://openalex.org/keywords/demand-side","display_name":"Demand side","score":0.43664246797561646},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.4200914204120636},{"id":"https://openalex.org/keywords/matlab","display_name":"MATLAB","score":0.4105674922466278},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.3473438024520874},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.341258704662323},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.32737696170806885},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.26826900243759155},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.17902988195419312},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.14536446332931519},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.13060885667800903},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.11406522989273071}],"concepts":[{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.6889828443527222},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6349523067474365},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.6321178674697876},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.6185370087623596},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6048024296760559},{"id":"https://openalex.org/C2778770139","wikidata":"https://www.wikidata.org/wiki/Q1966904","display_name":"Solver","level":2,"score":0.5373393893241882},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.4732014834880829},{"id":"https://openalex.org/C195487862","wikidata":"https://www.wikidata.org/wiki/Q850210","display_name":"Revenue","level":2,"score":0.4646097719669342},{"id":"https://openalex.org/C3020254827","wikidata":"https://www.wikidata.org/wiki/Q5255016","display_name":"Demand side","level":2,"score":0.43664246797561646},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.4200914204120636},{"id":"https://openalex.org/C2780365114","wikidata":"https://www.wikidata.org/wiki/Q169478","display_name":"MATLAB","level":2,"score":0.4105674922466278},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.3473438024520874},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.341258704662323},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.32737696170806885},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.26826900243759155},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.17902988195419312},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.14536446332931519},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.13060885667800903},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.11406522989273071},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C199360897","wikidata":"https://www.wikidata.org/wiki/Q9143","display_name":"Programming language","level":1,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C121955636","wikidata":"https://www.wikidata.org/wiki/Q4116214","display_name":"Accounting","level":1,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1145/3660395.3660452","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3660395.3660452","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 3rd Guangdong-Hong Kong-Macao Greater Bay Area Artificial Intelligence and Big Data Forum","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W2291701686","https://openalex.org/W4234251011","https://openalex.org/W4283389827"],"related_works":["https://openalex.org/W2555175041","https://openalex.org/W2032085210","https://openalex.org/W2052188148","https://openalex.org/W2389561653","https://openalex.org/W2173475281","https://openalex.org/W2072325519","https://openalex.org/W4307686474","https://openalex.org/W2358791272","https://openalex.org/W3135272596","https://openalex.org/W2805081846"],"abstract_inverted_index":{"In":[0],"order":[1],"to":[2,58,100,127,151,173,202],"improve":[3,214],"the":[4,7,18,24,32,46,61,65,71,80,94,105,110,120,140,147,153,167,175,188,206,209,215,222],"revenue":[5],"of":[6,36,39,75,82,85,96,112,124,208,218],"electricity":[8,43,47,98,129,142],"market":[9,12,48,62,211,223],"and":[10,28,70,92,115,133,156,159,179],"optimize":[11,203],"operation":[13,207],"decisions,":[14],"this":[15,194,200],"article":[16,195],"takes":[17],"user":[19],"side":[20,67],"demand":[21,66],"response":[22,68],"as":[23],"main":[25],"research":[26,30],"object,":[27],"conducts":[29],"on":[31],"coordinated":[33,121],"control":[34,122],"model":[35,101,191,201],"multiple":[37],"types":[38,84],"loads":[40,114],"under":[41,64],"real-time":[42,97],"prices":[44,99],"in":[45,104,130,193,205,221],"by":[49],"using":[50],"MATLAB":[51],"software":[52],"modeling.":[53],"The":[54,183],"objective":[55],"function":[56],"is":[57,136,171],"comprehensively":[59,213],"consider":[60],"cost":[63,74],"potential":[69],"power":[72,77,210,219,227],"generation":[73],"thermal":[76],"units;":[78],"Analyze":[79],"characteristics":[81,111],"different":[83],"loads,":[86],"study":[87],"their":[88,117],"specific":[89],"corresponding":[90],"modes,":[91],"incorporate":[93],"impact":[95],"scheduling":[102,118,177],"strategies":[103],"spot":[106],"market.":[107],"By":[108],"analyzing":[109],"various":[113],"optimizing":[116],"strategies,":[119],"effect":[123],"guiding":[125],"users":[126],"use":[128],"a":[131],"reasonable":[132],"orderly":[134],"manner":[135],"achieved.":[137],"After":[138],"obtaining":[139],"total":[141],"load,":[143],"input":[144],"it":[145],"into":[146],"lower":[148],"level":[149],"target":[150],"calculate":[152],"unit":[154,160,180],"start":[155],"stop":[157],"status":[158],"output":[161],"for":[162],"each":[163],"time":[164],"period.":[165],"Finally,":[166],"commercial":[168],"solver":[169],"Cplex":[170],"used":[172],"solve":[174],"optimal":[176],"results":[178,185],"combination":[181],"schemes.":[182],"simulation":[184],"prove":[186],"that":[187],"optimization":[189],"decision-making":[190,204],"designed":[192],"has":[196],"good":[197],"effects.":[198],"Applying":[199],"can":[212],"operational":[216],"benefits":[217],"enterprises":[220],"while":[224],"ensuring":[225],"stable":[226],"supply.":[228]},"counts_by_year":[],"updated_date":"2026-03-27T05:58:40.876381","created_date":"2025-10-10T00:00:00"}
