{"id":"https://openalex.org/W4401168197","doi":"https://doi.org/10.1145/3674225.3674301","title":"Research on Optimization of Distribution Network Power Supply Capacity Based on Improved Dijkstra Algorithm","display_name":"Research on Optimization of Distribution Network Power Supply Capacity Based on Improved Dijkstra Algorithm","publication_year":2024,"publication_date":"2024-01-19","ids":{"openalex":"https://openalex.org/W4401168197","doi":"https://doi.org/10.1145/3674225.3674301"},"language":"en","primary_location":{"id":"doi:10.1145/3674225.3674301","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3674225.3674301","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 International Conference on Power Electronics and Artificial Intelligence","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5089779450","display_name":"Ruojun Cai","orcid":null},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Ruojun Cai","raw_affiliation_strings":["Hainan power grid limited liability company Haikou power supply Bureau, China"],"affiliations":[{"raw_affiliation_string":"Hainan power grid limited liability company Haikou power supply Bureau, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5104010924","display_name":"Jiachen Yang","orcid":null},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jiachen Yang","raw_affiliation_strings":["Hainan power grid limited liability company Haikou power supply Bureau, China"],"affiliations":[{"raw_affiliation_string":"Hainan power grid limited liability company Haikou power supply Bureau, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5103331326","display_name":"Ying Chen","orcid":"https://orcid.org/0009-0005-1479-7801"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Ying Chen","raw_affiliation_strings":["Hainan power grid limited liability company Haikou power supply Bureau, China"],"affiliations":[{"raw_affiliation_string":"Hainan power grid limited liability company Haikou power supply Bureau, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5114200556","display_name":"Tianci Li","orcid":null},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Tianci Li","raw_affiliation_strings":["Hainan power grid limited liability company Haikou power supply Bureau, China"],"affiliations":[{"raw_affiliation_string":"Hainan power grid limited liability company Haikou power supply Bureau, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5113313507","display_name":"Demin Xie","orcid":null},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Demin Xie","raw_affiliation_strings":["Hainan power grid limited liability company Haikou power supply Bureau, China"],"affiliations":[{"raw_affiliation_string":"Hainan power grid limited liability company Haikou power supply Bureau, China","institution_ids":["https://openalex.org/I74872605"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":5,"corresponding_author_ids":["https://openalex.org/A5089779450"],"corresponding_institution_ids":["https://openalex.org/I74872605"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.09368353,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"427","last_page":"432"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9909999966621399,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10917","display_name":"Smart Grid Security and Resilience","score":0.9901000261306763,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/dijkstras-algorithm","display_name":"Dijkstra's algorithm","score":0.87845778465271},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6352270841598511},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.545472264289856},{"id":"https://openalex.org/keywords/optimization-algorithm","display_name":"Optimization algorithm","score":0.419596403837204},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.39155635237693787},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.38469183444976807},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.16833972930908203},{"id":"https://openalex.org/keywords/theoretical-computer-science","display_name":"Theoretical computer science","score":0.13648998737335205},{"id":"https://openalex.org/keywords/shortest-path-problem","display_name":"Shortest path problem","score":0.10713168978691101}],"concepts":[{"id":"https://openalex.org/C173870130","wikidata":"https://www.wikidata.org/wiki/Q8548","display_name":"Dijkstra's algorithm","level":4,"score":0.87845778465271},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6352270841598511},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.545472264289856},{"id":"https://openalex.org/C2987595161","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Optimization algorithm","level":2,"score":0.419596403837204},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.39155635237693787},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.38469183444976807},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.16833972930908203},{"id":"https://openalex.org/C80444323","wikidata":"https://www.wikidata.org/wiki/Q2878974","display_name":"Theoretical computer science","level":1,"score":0.13648998737335205},{"id":"https://openalex.org/C22590252","wikidata":"https://www.wikidata.org/wiki/Q1058754","display_name":"Shortest path problem","level":3,"score":0.10713168978691101},{"id":"https://openalex.org/C132525143","wikidata":"https://www.wikidata.org/wiki/Q141488","display_name":"Graph","level":2,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1145/3674225.3674301","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3674225.3674301","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 International Conference on Power Electronics and Artificial Intelligence","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy","score":0.8399999737739563}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":4,"referenced_works":["https://openalex.org/W3154365204","https://openalex.org/W3214649556","https://openalex.org/W4387834911","https://openalex.org/W4395053204"],"related_works":["https://openalex.org/W2375280931","https://openalex.org/W4366549320","https://openalex.org/W4287863136","https://openalex.org/W3006015132","https://openalex.org/W2965078190","https://openalex.org/W3040644038","https://openalex.org/W4394870774","https://openalex.org/W4311207076","https://openalex.org/W3203633096","https://openalex.org/W2355226480"],"abstract_inverted_index":{"The":[0],"distribution":[1,57,72,120],"network":[2],"is":[3],"an":[4,63],"important":[5],"component":[6],"of":[7,22,56,71,80,118],"the":[8,18,23,32,52,68,78,91,103,114],"power":[9,13,25,33,53,97,115],"system,":[10],"and":[11,20,36,84,106],"its":[12],"supply":[14,34,54,98,116],"capacity":[15,35,55,99,117],"directly":[16],"affects":[17],"stability":[19],"reliability":[21],"entire":[24],"system.":[26],"This":[27,74],"article":[28],"aims":[29],"to":[30,50,61,89,95],"improve":[31,51,96],"proposes":[37],"a":[38,108],"Dijkstra":[39],"algorithm":[40,75],"with":[41,102],"improved":[42],"weight":[43],"design":[44],"based":[45],"on":[46,112],"several":[47],"typical":[48],"measures":[49],"networks,":[58],"in":[59,100],"order":[60],"find":[62,90],"economic":[64],"solution":[65,94],"for":[66],"optimizing":[67],"load":[69,82],"rate":[70,83],"networks.":[73,121],"comprehensively":[76],"considers":[77],"effect":[79,111],"reducing":[81],"construction":[85],"cost,":[86],"which":[87],"helps":[88],"most":[92],"economical":[93],"line":[101],"actual":[104],"situation,":[105],"has":[107],"strong":[109],"reference":[110],"improving":[113],"urban":[119]},"counts_by_year":[],"updated_date":"2025-12-26T23:08:49.675405","created_date":"2025-10-10T00:00:00"}
