{"id":"https://openalex.org/W4399146947","doi":"https://doi.org/10.1145/3659211.3659356","title":"Research on Improvement Strategy of Electricity Carbon Joint Demand Response Based on Low Carbon Economy Optimization Scheduling","display_name":"Research on Improvement Strategy of Electricity Carbon Joint Demand Response Based on Low Carbon Economy Optimization Scheduling","publication_year":2023,"publication_date":"2023-12-08","ids":{"openalex":"https://openalex.org/W4399146947","doi":"https://doi.org/10.1145/3659211.3659356"},"language":"en","primary_location":{"id":"doi:10.1145/3659211.3659356","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3659211.3659356","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 4th International Conference on Big Data Economy and Information Management","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5022781606","display_name":"Xue Jiang","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Xue Jiang","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0009-4088-8706","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5103273236","display_name":"Junru Lin","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Junru Lin","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0001-0062-7319","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":null,"display_name":"Di Wang","orcid":"https://orcid.org/0009-0006-0187-8933"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Di Wang","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0006-0187-8933","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":null,"display_name":"Shuai Li","orcid":"https://orcid.org/0009-0008-0871-5891"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Shuai Li","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0008-0871-5891","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5021754675","display_name":"Bing Liu","orcid":"https://orcid.org/0009-0000-7742-3552"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Bing Liu","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0000-7742-3552","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5101943096","display_name":"Jingbo Xia","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Jingbo Xia","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited Economic Research Institute, China"],"raw_orcid":"https://orcid.org/0009-0006-5459-3210","affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited Economic Research Institute, China","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":6,"corresponding_author_ids":["https://openalex.org/A5022781606"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.21687011,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"840","last_page":"844"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9603999853134155,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9603999853134155,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9534000158309937,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9490000009536743,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.7111232280731201},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5803734064102173},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.5438883304595947},{"id":"https://openalex.org/keywords/low-carbon-economy","display_name":"Low-carbon economy","score":0.5060378909111023},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.4983797073364258},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.47477173805236816},{"id":"https://openalex.org/keywords/greenhouse-gas","display_name":"Greenhouse gas","score":0.39347925782203674},{"id":"https://openalex.org/keywords/natural-resource-economics","display_name":"Natural resource economics","score":0.3210468292236328},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.18395310640335083},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.17765557765960693},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.15115511417388916},{"id":"https://openalex.org/keywords/ecology","display_name":"Ecology","score":0.08386018872261047}],"concepts":[{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.7111232280731201},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5803734064102173},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.5438883304595947},{"id":"https://openalex.org/C513535597","wikidata":"https://www.wikidata.org/wiki/Q3267905","display_name":"Low-carbon economy","level":3,"score":0.5060378909111023},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.4983797073364258},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.47477173805236816},{"id":"https://openalex.org/C47737302","wikidata":"https://www.wikidata.org/wiki/Q167336","display_name":"Greenhouse gas","level":2,"score":0.39347925782203674},{"id":"https://openalex.org/C175605778","wikidata":"https://www.wikidata.org/wiki/Q3299701","display_name":"Natural resource economics","level":1,"score":0.3210468292236328},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.18395310640335083},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.17765557765960693},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.15115511417388916},{"id":"https://openalex.org/C18903297","wikidata":"https://www.wikidata.org/wiki/Q7150","display_name":"Ecology","level":1,"score":0.08386018872261047},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C86803240","wikidata":"https://www.wikidata.org/wiki/Q420","display_name":"Biology","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1145/3659211.3659356","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3659211.3659356","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 4th International Conference on Big Data Economy and Information Management","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":6,"referenced_works":["https://openalex.org/W2748776435","https://openalex.org/W2885478095","https://openalex.org/W3125661393","https://openalex.org/W4283453673","https://openalex.org/W4367175543","https://openalex.org/W4368365683"],"related_works":["https://openalex.org/W2555175041","https://openalex.org/W2032085210","https://openalex.org/W2389561653","https://openalex.org/W2052188148","https://openalex.org/W4239205706","https://openalex.org/W4239297229","https://openalex.org/W3003695187","https://openalex.org/W2474431918","https://openalex.org/W3166575991","https://openalex.org/W4210490979"],"abstract_inverted_index":{"With":[0],"the":[1,9,13,18,25,29,42,48,71,75,81,87,94,113],"proposal":[2],"of":[3,12,24,34,47,93],"China's":[4],"dual":[5],"carbon":[6,15,30,45,58,72,76,120],"goals":[7],"and":[8,20,44,51,85,104],"rapid":[10],"development":[11,19],"national":[14],"market,":[16],"exploring":[17],"optimization":[21,66,105],"scheduling":[22],"strategies":[23],"power":[26,49],"system":[27,95],"in":[28,74,98],"market":[31,79],"environment":[32],"is":[33],"great":[35],"significance.":[36],"This":[37,68],"article":[38],"aims":[39],"to":[40,96],"minimize":[41],"cost":[43,73],"emissions":[46,121],"system,":[50],"proposes":[52],"an":[53],"improved":[54],"strategy":[55,69,89,116],"for":[56,90],"electricity":[57],"joint":[59],"demand":[60,82,99,124],"response":[61,83,100,125],"based":[62],"on":[63],"low-carbon":[64],"economic":[65],"scheduling.":[67],"introduces":[70],"emission":[77],"trading":[78],"into":[80],"target,":[84],"obtains":[86],"optimal":[88],"each":[91],"node":[92],"participate":[97],"through":[101],"recent":[102],"simulation":[103],"regulation":[106],"methods.":[107],"The":[108],"research":[109],"results":[110],"show":[111],"that":[112],"proposed":[114],"improvement":[115],"can":[117],"effectively":[118],"reduce":[119],"while":[122],"meeting":[123],"requirements.":[126]},"counts_by_year":[],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
