{"id":"https://openalex.org/W4400106149","doi":"https://doi.org/10.1145/3655532.3655551","title":"Modelling the Integrated Production Scheduling and Vehicle Routing Problem","display_name":"Modelling the Integrated Production Scheduling and Vehicle Routing Problem","publication_year":2023,"publication_date":"2023-09-22","ids":{"openalex":"https://openalex.org/W4400106149","doi":"https://doi.org/10.1145/3655532.3655551"},"language":"en","primary_location":{"id":"doi:10.1145/3655532.3655551","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3655532.3655551","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 6th International Conference on Robot Systems and Applications","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5054410876","display_name":"Simon Caillard","orcid":"https://orcid.org/0000-0002-9175-171X"},"institutions":[{"id":"https://openalex.org/I4210155362","display_name":"Centre d'Etudes Superieures Industrielles","ror":"https://ror.org/04f87d812","country_code":"FR","type":"education","lineage":["https://openalex.org/I4210155362"]}],"countries":["FR"],"is_corresponding":false,"raw_author_name":"Simon Caillard","raw_affiliation_strings":["CESI LINEACT, France, France"],"raw_orcid":"https://orcid.org/0000-0002-9175-171X","affiliations":[{"raw_affiliation_string":"CESI LINEACT, France, France","institution_ids":["https://openalex.org/I4210155362"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5052576554","display_name":"Hajar Nouinou","orcid":"https://orcid.org/0000-0002-8712-4043"},"institutions":[{"id":"https://openalex.org/I4210155362","display_name":"Centre d'Etudes Superieures Industrielles","ror":"https://ror.org/04f87d812","country_code":"FR","type":"education","lineage":["https://openalex.org/I4210155362"]}],"countries":["FR"],"is_corresponding":false,"raw_author_name":"Hajar Nouinou","raw_affiliation_strings":["CESI LINEACT, France, France"],"raw_orcid":"https://orcid.org/0000-0002-8712-4043","affiliations":[{"raw_affiliation_string":"CESI LINEACT, France, France","institution_ids":["https://openalex.org/I4210155362"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5019292517","display_name":"Mourad Zghal","orcid":"https://orcid.org/0000-0003-1329-8574"},"institutions":[{"id":"https://openalex.org/I4210155362","display_name":"Centre d'Etudes Superieures Industrielles","ror":"https://ror.org/04f87d812","country_code":"FR","type":"education","lineage":["https://openalex.org/I4210155362"]}],"countries":["FR"],"is_corresponding":false,"raw_author_name":"Mourad Zghal","raw_affiliation_strings":["CESI LINEACT, France, France"],"raw_orcid":"https://orcid.org/0000-0003-1329-8574","affiliations":[{"raw_affiliation_string":"CESI LINEACT, France, France","institution_ids":["https://openalex.org/I4210155362"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4210155362"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.45255221,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"117","last_page":"123"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9987000226974487,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9987000226974487,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9983999729156494,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10567","display_name":"Vehicle Routing Optimization Methods","score":0.9965999722480774,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6690698862075806},{"id":"https://openalex.org/keywords/vehicle-routing-problem","display_name":"Vehicle routing problem","score":0.6572527289390564},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.565175473690033},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.4318371117115021},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.41992926597595215},{"id":"https://openalex.org/keywords/routing","display_name":"Routing (electronic design automation)","score":0.40907856822013855},{"id":"https://openalex.org/keywords/distributed-computing","display_name":"Distributed computing","score":0.3562113046646118},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.26989370584487915},{"id":"https://openalex.org/keywords/computer-network","display_name":"Computer network","score":0.2650889754295349},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.07726791501045227},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.06247624754905701}],"concepts":[{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6690698862075806},{"id":"https://openalex.org/C123784306","wikidata":"https://www.wikidata.org/wiki/Q944041","display_name":"Vehicle routing problem","level":3,"score":0.6572527289390564},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.565175473690033},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.4318371117115021},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.41992926597595215},{"id":"https://openalex.org/C74172769","wikidata":"https://www.wikidata.org/wiki/Q1446839","display_name":"Routing (electronic design automation)","level":2,"score":0.40907856822013855},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.3562113046646118},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.26989370584487915},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.2650889754295349},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.07726791501045227},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.06247624754905701},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.1145/3655532.3655551","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3655532.3655551","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 2023 6th International Conference on Robot Systems and Applications","raw_type":"proceedings-article"},{"id":"pmh:oai:HAL:hal-04389985v1","is_oa":false,"landing_page_url":"https://hal.science/hal-04389985","pdf_url":null,"source":{"id":"https://openalex.org/S4306402512","display_name":"HAL (Le Centre pour la Communication Scientifique Directe)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I1294671590","host_organization_name":"Centre National de la Recherche Scientifique","host_organization_lineage":["https://openalex.org/I1294671590"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"International Conference on Environment and Industrial Innovation (ICEII 2023), Jun 2023, Vienne, Austria. &#x27E8;10.1145/3655532.3655551&#x27E9;","raw_type":"info:eu-repo/semantics/conferenceObject"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":14,"referenced_works":["https://openalex.org/W1966916662","https://openalex.org/W1970049815","https://openalex.org/W1988064735","https://openalex.org/W2036950623","https://openalex.org/W2038078432","https://openalex.org/W2061844053","https://openalex.org/W2398691615","https://openalex.org/W2473526392","https://openalex.org/W2495093152","https://openalex.org/W2598696228","https://openalex.org/W2604280268","https://openalex.org/W2896938346","https://openalex.org/W3091984700","https://openalex.org/W4248841288"],"related_works":["https://openalex.org/W4312143452","https://openalex.org/W2018691209","https://openalex.org/W4247364272","https://openalex.org/W3133151256","https://openalex.org/W2132920749","https://openalex.org/W2101108574","https://openalex.org/W2157331354","https://openalex.org/W2626773395","https://openalex.org/W3131953714","https://openalex.org/W3204654320"],"abstract_inverted_index":{"In":[0],"this":[1],"paper,":[2],"we":[3],"study":[4,85],"an":[5,83],"integrated":[6,70],"production":[7,15],"scheduling":[8],"and":[9,32,57,82],"vehicle":[10],"routing":[11],"problem.":[12,72],"On":[13,35],"the":[14,36,58,69,79],"side,":[16,38],"a":[17,64],"set":[18],"of":[19],"jobs":[20],"has":[21],"to":[22,43,54,67,77],"be":[23,41],"scheduled":[24],"on":[25],"identical":[26],"parallel":[27],"machines":[28],"considering":[29],"release":[30],"dates":[31],"due":[33],"dates.":[34],"delivery":[37],"orders":[39],"must":[40],"delivered":[42],"customers":[44],"using":[45],"several":[46],"vehicles":[47],"with":[48],"limited":[49],"capacity.":[50],"The":[51],"objective":[52],"is":[53,75,86],"minimize":[55],"delays":[56],"total":[59],"traveled":[60],"distance.":[61],"We":[62],"propose":[63],"mathematical":[65],"model":[66,81],"solve":[68],"decision":[71],"An":[73],"example":[74],"used":[76],"illustrate":[78],"proposed":[80],"experimental":[84],"conducted.":[87]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
