{"id":"https://openalex.org/W3172926282","doi":"https://doi.org/10.1145/3456887.3459712","title":"Design of Project Cost Information Management and Analysis System Based on BIM Technology","display_name":"Design of Project Cost Information Management and Analysis System Based on BIM Technology","publication_year":2021,"publication_date":"2021-05-25","ids":{"openalex":"https://openalex.org/W3172926282","doi":"https://doi.org/10.1145/3456887.3459712","mag":"3172926282"},"language":"en","primary_location":{"id":"doi:10.1145/3456887.3459712","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3456887.3459712","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 2nd International Conference on Computers, Information Processing and Advanced Education","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5103980372","display_name":"Yuanjing Zhao","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Yuanjing Zhao","raw_affiliation_strings":["Chongqing Vocationl Institute of Engineering, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Chongqing Vocationl Institute of Engineering, China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5077219079","display_name":"Tang Wei","orcid":"https://orcid.org/0000-0002-6537-018X"},"institutions":[{"id":"https://openalex.org/I4210135994","display_name":"China Railway Group (China)","ror":"https://ror.org/03za3eq42","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210135994"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Wei Tang","raw_affiliation_strings":["The 3th Engineering Co., Ltd. of China Railway 12th Bureau Group, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"The 3th Engineering Co., Ltd. of China Railway 12th Bureau Group, China","institution_ids":["https://openalex.org/I4210135994"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.9729,"has_fulltext":false,"cited_by_count":2,"citation_normalized_percentile":{"value":0.70203186,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":94,"max":96},"biblio":{"volume":"10","issue":null,"first_page":"1516","last_page":"1519"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":0.9595999717712402,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11006","display_name":"BIM and Construction Integration","score":0.9595999717712402,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10703","display_name":"Business Process Modeling and Analysis","score":0.9546999931335449,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/bidding","display_name":"Bidding","score":0.776852011680603},{"id":"https://openalex.org/keywords/valuation","display_name":"Valuation (finance)","score":0.7029926180839539},{"id":"https://openalex.org/keywords/building-information-modeling","display_name":"Building information modeling","score":0.5376545190811157},{"id":"https://openalex.org/keywords/project-management","display_name":"Project management","score":0.5366939902305603},{"id":"https://openalex.org/keywords/cost-accounting","display_name":"Cost accounting","score":0.5284383296966553},{"id":"https://openalex.org/keywords/engineering-management","display_name":"Engineering management","score":0.49481838941574097},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.483267605304718},{"id":"https://openalex.org/keywords/construction-management","display_name":"Construction management","score":0.4571107029914856},{"id":"https://openalex.org/keywords/systems-engineering","display_name":"Systems engineering","score":0.41196727752685547},{"id":"https://openalex.org/keywords/construction-engineering","display_name":"Construction engineering","score":0.3482634425163269},{"id":"https://openalex.org/keywords/risk-analysis","display_name":"Risk analysis (engineering)","score":0.34303152561187744},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.2746790051460266},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.25391629338264465},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.19213980436325073},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.18171143531799316},{"id":"https://openalex.org/keywords/civil-engineering","display_name":"Civil engineering","score":0.10158306360244751}],"concepts":[{"id":"https://openalex.org/C9233905","wikidata":"https://www.wikidata.org/wiki/Q3276328","display_name":"Bidding","level":2,"score":0.776852011680603},{"id":"https://openalex.org/C186027771","wikidata":"https://www.wikidata.org/wiki/Q4008379","display_name":"Valuation (finance)","level":2,"score":0.7029926180839539},{"id":"https://openalex.org/C66862320","wikidata":"https://www.wikidata.org/wiki/Q842017","display_name":"Building information modeling","level":3,"score":0.5376545190811157},{"id":"https://openalex.org/C15952604","wikidata":"https://www.wikidata.org/wiki/Q179012","display_name":"Project management","level":2,"score":0.5366939902305603},{"id":"https://openalex.org/C94107157","wikidata":"https://www.wikidata.org/wiki/Q1077518","display_name":"Cost accounting","level":2,"score":0.5284383296966553},{"id":"https://openalex.org/C110354214","wikidata":"https://www.wikidata.org/wiki/Q6314146","display_name":"Engineering management","level":1,"score":0.49481838941574097},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.483267605304718},{"id":"https://openalex.org/C117110933","wikidata":"https://www.wikidata.org/wiki/Q811501","display_name":"Construction management","level":2,"score":0.4571107029914856},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.41196727752685547},{"id":"https://openalex.org/C107053488","wikidata":"https://www.wikidata.org/wiki/Q2674423","display_name":"Construction engineering","level":1,"score":0.3482634425163269},{"id":"https://openalex.org/C112930515","wikidata":"https://www.wikidata.org/wiki/Q4389547","display_name":"Risk analysis (engineering)","level":1,"score":0.34303152561187744},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2746790051460266},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.25391629338264465},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.19213980436325073},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.18171143531799316},{"id":"https://openalex.org/C147176958","wikidata":"https://www.wikidata.org/wiki/Q77590","display_name":"Civil engineering","level":1,"score":0.10158306360244751},{"id":"https://openalex.org/C121955636","wikidata":"https://www.wikidata.org/wiki/Q4116214","display_name":"Accounting","level":1,"score":0.0},{"id":"https://openalex.org/C10138342","wikidata":"https://www.wikidata.org/wiki/Q43015","display_name":"Finance","level":1,"score":0.0},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1145/3456887.3459712","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3456887.3459712","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 2nd International Conference on Computers, Information Processing and Advanced Education","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","score":0.6700000166893005,"id":"https://metadata.un.org/sdg/9"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":2,"referenced_works":["https://openalex.org/W2089570148","https://openalex.org/W2149833050"],"related_works":["https://openalex.org/W2899084033","https://openalex.org/W2380435646","https://openalex.org/W2003900169","https://openalex.org/W3146916057","https://openalex.org/W2093919360","https://openalex.org/W2350285686","https://openalex.org/W2019939421","https://openalex.org/W2374090014","https://openalex.org/W2025885426","https://openalex.org/W2016083439"],"abstract_inverted_index":{"With":[0],"the":[1,29,33,43,55,59,62,72,77],"popularization":[2],"of":[3,5,17,28,35,45,61,76],"bill":[4,16],"quantities":[6,18],"valuation":[7,47,79],"mode,":[8],"construction":[9,30],"enterprises":[10],"need":[11],"to":[12],"compile":[13],"high":[14],"quality":[15],"for":[19,42],"bidding":[20],"and":[21,32,70,74],"project":[22],"cost":[23,63],"management.":[24],"The":[25],"information-based":[26],"development":[27,44],"industry":[31],"emergence":[34],"BIM":[36,56],"technology":[37],"provide":[38],"a":[39],"good":[40],"opportunity":[41],"engineering":[46,78],"field":[48],"in":[49],"China.":[50],"This":[51],"paper":[52],"mainly":[53],"introduces":[54],"model,":[57],"designs":[58],"framework":[60],"information":[64],"management":[65],"system":[66],"based":[67,81],"on":[68,82],"BIM,":[69],"analyzes":[71],"advantages":[73],"limitations":[75],"model":[80],"BIM.":[83]},"counts_by_year":[{"year":2023,"cited_by_count":2}],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
