{"id":"https://openalex.org/W3163095974","doi":"https://doi.org/10.1145/3452940.3452970","title":"High-Voltage Substation Outlet Scale Study for Large Receiving End Networks","display_name":"High-Voltage Substation Outlet Scale Study for Large Receiving End Networks","publication_year":2020,"publication_date":"2020-12-03","ids":{"openalex":"https://openalex.org/W3163095974","doi":"https://doi.org/10.1145/3452940.3452970","mag":"3163095974"},"language":"en","primary_location":{"id":"doi:10.1145/3452940.3452970","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3452940.3452970","pdf_url":null,"source":{"id":"https://openalex.org/S4306523813","display_name":"Proceedings of the 3rd International Conference on Information Technologies and Electrical Engineering","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 3rd International Conference on Information Technologies and Electrical Engineering","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5067438462","display_name":"Wei Zhao","orcid":"https://orcid.org/0000-0001-5551-7582"},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Wei Zhao","raw_affiliation_strings":["North China Branch of State Grid Corporation, Beijing China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"North China Branch of State Grid Corporation, Beijing China","institution_ids":["https://openalex.org/I17442442"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5114910925","display_name":"Wenchao Zhang","orcid":"https://orcid.org/0000-0002-6412-3961"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Wenchao Zhang","raw_affiliation_strings":["Beijing Kedong Electric Power Control System Co., Beijing China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Beijing Kedong Electric Power Control System Co., Beijing China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5114889033","display_name":"Yan Pan","orcid":"https://orcid.org/0009-0004-3692-3576"},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yan Pan","raw_affiliation_strings":["North China Branch of State Grid Corporation, Beijing China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"North China Branch of State Grid Corporation, Beijing China","institution_ids":["https://openalex.org/I17442442"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.29968622,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"24","issue":null,"first_page":"149","last_page":"154"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T14502","display_name":"High-Voltage Power Transmission Systems","score":0.9979000091552734,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T14502","display_name":"High-Voltage Power Transmission Systems","score":0.9979000091552734,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.992900013923645,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9905999898910522,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/circuit-breaker","display_name":"Circuit breaker","score":0.7284722328186035},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.6059791445732117},{"id":"https://openalex.org/keywords/voltage","display_name":"Voltage","score":0.6040725708007812},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.5963068604469299},{"id":"https://openalex.org/keywords/high-voltage","display_name":"High voltage","score":0.5136603713035583},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.5024831295013428},{"id":"https://openalex.org/keywords/short-circuit","display_name":"Short circuit","score":0.45563143491744995},{"id":"https://openalex.org/keywords/short-circuit-ratio","display_name":"Short circuit ratio","score":0.4505336284637451},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.4443328380584717},{"id":"https://openalex.org/keywords/electric-power-transmission","display_name":"Electric power transmission","score":0.4395669102668762},{"id":"https://openalex.org/keywords/low-voltage","display_name":"Low voltage","score":0.43944239616394043},{"id":"https://openalex.org/keywords/line","display_name":"Line (geometry)","score":0.43565812706947327},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.0925525426864624},{"id":"https://openalex.org/keywords/physics","display_name":"Physics","score":0.07158374786376953}],"concepts":[{"id":"https://openalex.org/C61352017","wikidata":"https://www.wikidata.org/wiki/Q211058","display_name":"Circuit breaker","level":2,"score":0.7284722328186035},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.6059791445732117},{"id":"https://openalex.org/C165801399","wikidata":"https://www.wikidata.org/wiki/Q25428","display_name":"Voltage","level":2,"score":0.6040725708007812},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.5963068604469299},{"id":"https://openalex.org/C88182573","wikidata":"https://www.wikidata.org/wiki/Q1139740","display_name":"High voltage","level":3,"score":0.5136603713035583},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.5024831295013428},{"id":"https://openalex.org/C68583231","wikidata":"https://www.wikidata.org/wiki/Q206907","display_name":"Short circuit","level":3,"score":0.45563143491744995},{"id":"https://openalex.org/C152478096","wikidata":"https://www.wikidata.org/wiki/Q7502023","display_name":"Short circuit ratio","level":5,"score":0.4505336284637451},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.4443328380584717},{"id":"https://openalex.org/C140311924","wikidata":"https://www.wikidata.org/wiki/Q200928","display_name":"Electric power transmission","level":2,"score":0.4395669102668762},{"id":"https://openalex.org/C128624480","wikidata":"https://www.wikidata.org/wiki/Q1504817","display_name":"Low voltage","level":3,"score":0.43944239616394043},{"id":"https://openalex.org/C198352243","wikidata":"https://www.wikidata.org/wiki/Q37105","display_name":"Line (geometry)","level":2,"score":0.43565812706947327},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0925525426864624},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.07158374786376953},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C133321666","wikidata":"https://www.wikidata.org/wiki/Q3238394","display_name":"LED circuit","level":4,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1145/3452940.3452970","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3452940.3452970","pdf_url":null,"source":{"id":"https://openalex.org/S4306523813","display_name":"Proceedings of the 3rd International Conference on Information Technologies and Electrical Engineering","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the 3rd International Conference on Information Technologies and Electrical Engineering","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/11","display_name":"Sustainable cities and communities","score":0.41999998688697815}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":5,"referenced_works":["https://openalex.org/W2362183665","https://openalex.org/W2366729353","https://openalex.org/W2390746671","https://openalex.org/W2391710630","https://openalex.org/W6998661099"],"related_works":["https://openalex.org/W2047626952","https://openalex.org/W4236894149","https://openalex.org/W2380193754","https://openalex.org/W3190668478","https://openalex.org/W2389360071","https://openalex.org/W2362565749","https://openalex.org/W2351207833","https://openalex.org/W2348879879","https://openalex.org/W2109816005","https://openalex.org/W4386450894"],"abstract_inverted_index":{"With":[0],"the":[1,7,12,16,20,25,43,52,56,74,78,101,105,117,124,134,139,142,151,158,162,166,179,185,196,201,205,210,217],"growth":[2],"of":[3,24,36,39,55,77,103,116,141,160,165,168,184,209,216],"high-voltage":[4,26,125,212],"substations":[5,41,126],"in":[6,87,127,192,200],"receiving":[8,83,129],"end":[9,84,130],"grid":[10,68,132],"and":[11,42,72,94,97,109,157,174,207],"tight":[13],"connection":[14],"between":[15,45,107],"regional":[17],"power":[18,85,119,131],"grids,":[19],"short-circuit":[21,53,197],"current":[22,198],"level":[23,156],"bus":[27,57],"has":[28],"been":[29],"increasing":[30],"year":[31],"by":[32],"year.":[33],"The":[34],"number":[35,102,159,167],"distribution":[37],"lines":[38,171,191],"highvoltage":[40],"distance":[44,106],"them":[46],"are":[47],"important":[48,62],"influencing":[49],"factors":[50],"for":[51],"capacity":[54,155],"side,":[58],"which":[59],"is":[60,121,172,176,189],"an":[61,112],"parameter":[63],"to":[64],"be":[65],"considered":[66],"during":[67],"planning.":[69],"By":[70,137],"summarizing":[71],"analyzing":[73,138],"structural":[75],"characteristics":[76],"typical":[79,148],"500kV,":[80],"750kV":[81],"large":[82,128],"grids":[86],"North":[88],"China,":[89,91,93,96],"East":[90],"Central":[92],"Northwest":[95],"taking":[98],"into":[99],"account":[100],"substations,":[104,161],"stations":[108],"voltage":[110,145,187],"levels,":[111],"equivalent":[113],"circuit":[114,152],"model":[115,140],"whole":[118],"system":[120],"constructed":[122],"with":[123,147],"as":[133],"base":[135],"point.":[136],"grid's":[143],"high":[144,186],"side":[146],"parameters,":[149],"combining":[150],"breaker":[153],"interrupting":[154],"reference":[163],"range":[164],"substation":[169,188,213],"outgoing":[170,181],"determined,":[173],"it":[175],"proposed":[177,211],"that":[178],"reasonable":[180],"line":[182],"scale":[183],"six":[190],"most":[193],"cases.":[194],"Finally,":[195],"levels":[199],"State":[202],"Grid":[203],"verified":[204],"feasibility":[206],"validity":[208],"outlet":[214],"size":[215],"receiving-end":[218],"grid.":[219]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
