{"id":"https://openalex.org/W2803584935","doi":"https://doi.org/10.1145/3208903.3214347","title":"Bidding Strategies for Flexible and Inflexible Generation in a Power Market Simulation Model","display_name":"Bidding Strategies for Flexible and Inflexible Generation in a Power Market Simulation Model","publication_year":2018,"publication_date":"2018-05-25","ids":{"openalex":"https://openalex.org/W2803584935","doi":"https://doi.org/10.1145/3208903.3214347","mag":"2803584935"},"language":"en","primary_location":{"id":"doi:10.1145/3208903.3214347","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3208903.3214347","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the Ninth International Conference on Future Energy Systems","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5044922843","display_name":"Anke Weidlich","orcid":"https://orcid.org/0000-0003-2361-0912"},"institutions":[{"id":"https://openalex.org/I161046081","display_name":"University of Freiburg","ror":"https://ror.org/0245cg223","country_code":"DE","type":"education","lineage":["https://openalex.org/I161046081"]}],"countries":["DE"],"is_corresponding":true,"raw_author_name":"Anke Weidlich","raw_affiliation_strings":["University of Freiburg, INATECH, Freiburg, Germany"],"affiliations":[{"raw_affiliation_string":"University of Freiburg, INATECH, Freiburg, Germany","institution_ids":["https://openalex.org/I161046081"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5035509968","display_name":"Thomas K\u00fcnzel","orcid":"https://orcid.org/0000-0002-0404-1403"},"institutions":[{"id":"https://openalex.org/I4210090736","display_name":"Fichtner (Germany)","ror":"https://ror.org/00hgq7r66","country_code":"DE","type":"company","lineage":["https://openalex.org/I4210090736"]}],"countries":["DE"],"is_corresponding":false,"raw_author_name":"Thomas K\u00fcnzel","raw_affiliation_strings":["Fichtner GmbH &amp; Co. KG, Stuttgart, Germany"],"affiliations":[{"raw_affiliation_string":"Fichtner GmbH &amp; Co. KG, Stuttgart, Germany","institution_ids":["https://openalex.org/I4210090736"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5021850179","display_name":"Florian Klumpp","orcid":null},"institutions":[{"id":"https://openalex.org/I4210090736","display_name":"Fichtner (Germany)","ror":"https://ror.org/00hgq7r66","country_code":"DE","type":"company","lineage":["https://openalex.org/I4210090736"]}],"countries":["DE"],"is_corresponding":false,"raw_author_name":"Florian Klumpp","raw_affiliation_strings":["Fichtner GmbH &amp; Co. KG, Stuttgart, Germany"],"affiliations":[{"raw_affiliation_string":"Fichtner GmbH &amp; Co. KG, Stuttgart, Germany","institution_ids":["https://openalex.org/I4210090736"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5044922843"],"corresponding_institution_ids":["https://openalex.org/I161046081"],"apc_list":null,"apc_paid":null,"fwci":0.3863,"has_fulltext":false,"cited_by_count":6,"citation_normalized_percentile":{"value":0.61943816,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":96},"biblio":{"volume":null,"issue":null,"first_page":"532","last_page":"537"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9973999857902527,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9925000071525574,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/bidding","display_name":"Bidding","score":0.8575596213340759},{"id":"https://openalex.org/keywords/variable-renewable-energy","display_name":"Variable renewable energy","score":0.7501422166824341},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.695587694644928},{"id":"https://openalex.org/keywords/flexibility","display_name":"Flexibility (engineering)","score":0.6638472676277161},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.6005331873893738},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5532952547073364},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.48301562666893005},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.47746896743774414},{"id":"https://openalex.org/keywords/power-market","display_name":"Power market","score":0.47466734051704407},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.46101582050323486},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.44878414273262024},{"id":"https://openalex.org/keywords/energy-market","display_name":"Energy market","score":0.44457441568374634},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.4419263005256653},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.41986721754074097},{"id":"https://openalex.org/keywords/industrial-organization","display_name":"Industrial organization","score":0.3841460943222046},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.3461988568305969},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.32161417603492737},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.31716471910476685},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.257806658744812},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.2550753653049469},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.14640575647354126},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.12854689359664917}],"concepts":[{"id":"https://openalex.org/C9233905","wikidata":"https://www.wikidata.org/wiki/Q3276328","display_name":"Bidding","level":2,"score":0.8575596213340759},{"id":"https://openalex.org/C2780789856","wikidata":"https://www.wikidata.org/wiki/Q7915732","display_name":"Variable renewable energy","level":4,"score":0.7501422166824341},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.695587694644928},{"id":"https://openalex.org/C2780598303","wikidata":"https://www.wikidata.org/wiki/Q65921492","display_name":"Flexibility (engineering)","level":2,"score":0.6638472676277161},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.6005331873893738},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5532952547073364},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.48301562666893005},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.47746896743774414},{"id":"https://openalex.org/C2989491980","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Power market","level":4,"score":0.47466734051704407},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.46101582050323486},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.44878414273262024},{"id":"https://openalex.org/C2776849302","wikidata":"https://www.wikidata.org/wiki/Q1239166","display_name":"Energy market","level":3,"score":0.44457441568374634},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.4419263005256653},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.41986721754074097},{"id":"https://openalex.org/C40700","wikidata":"https://www.wikidata.org/wiki/Q1411783","display_name":"Industrial organization","level":1,"score":0.3841460943222046},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.3461988568305969},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.32161417603492737},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.31716471910476685},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.257806658744812},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.2550753653049469},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.14640575647354126},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.12854689359664917},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C187736073","wikidata":"https://www.wikidata.org/wiki/Q2920921","display_name":"Management","level":1,"score":0.0}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.1145/3208903.3214347","is_oa":false,"landing_page_url":"https://doi.org/10.1145/3208903.3214347","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the Ninth International Conference on Future Energy Systems","raw_type":"proceedings-article"},{"id":"pmh:oai:freidok.uni-freiburg.de:145089","is_oa":false,"landing_page_url":"https://freidok.uni-freiburg.de/data/145089","pdf_url":null,"source":{"id":"https://openalex.org/S4306401057","display_name":"FreiDok plus (Universit\u00e4tsbibliothek Freiburg)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I161046081","host_organization_name":"University of Freiburg","host_organization_lineage":["https://openalex.org/I161046081"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"ACM e-Energy 2018. - 1, 1 (2018) , 532 - 537","raw_type":"article_in_conference_proceedings"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","score":0.8500000238418579,"id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":19,"referenced_works":["https://openalex.org/W27536653","https://openalex.org/W1208470056","https://openalex.org/W1522372289","https://openalex.org/W1558817796","https://openalex.org/W1940496428","https://openalex.org/W1975348168","https://openalex.org/W1978813851","https://openalex.org/W2008937094","https://openalex.org/W2019128914","https://openalex.org/W2026996082","https://openalex.org/W2046465142","https://openalex.org/W2143830375","https://openalex.org/W2227289676","https://openalex.org/W2280091373","https://openalex.org/W2473113327","https://openalex.org/W2495345662","https://openalex.org/W2573541360","https://openalex.org/W2689215254","https://openalex.org/W6720524574"],"related_works":["https://openalex.org/W2559626253","https://openalex.org/W2521661770","https://openalex.org/W2760580644","https://openalex.org/W3089504951","https://openalex.org/W2958171366","https://openalex.org/W2035892734","https://openalex.org/W2766126941","https://openalex.org/W3048954441","https://openalex.org/W2353549528","https://openalex.org/W1928556890"],"abstract_inverted_index":{"This":[0],"paper":[1],"presents":[2],"an":[3,44],"electricity":[4],"market":[5,42,47,69,77,82],"simulation":[6,55,64],"model":[7,56,65,117],"that":[8,62,86],"focuses":[9],"on":[10],"the":[11,54,63,72,75,141],"distinction":[12],"between":[13],"flexible":[14,30,95],"and":[15,18,34,43,50,112,134],"inflexible":[16],"generation,":[17],"formulates":[19],"bidding":[20],"strategies":[21],"for":[22,29,71,80,110,121,145],"capacities":[23],"of":[24,74,105,126,129],"either":[25],"type.":[26],"Bid":[27],"formulation":[28],"power":[31,87,114],"plants,":[32],"storage":[33],"demand":[35],"response":[36],"units":[37],"at":[38],"a":[39,93],"control":[40],"reserve":[41],"energy":[45,124,132],"exchange":[46],"are":[48,57,107],"described,":[49],"exemplary":[51],"results":[52],"from":[53],"presented.":[58],"It":[59],"is":[60,99],"shown":[61],"can":[66,118],"realistically":[67],"reproduce":[68],"outcomes":[70],"example":[73],"German":[76],"zone,":[78],"even":[79],"negative":[81],"prices.":[83],"Results":[84],"reveal":[85],"plants":[88],"could":[89],"be":[90,119],"deployed":[91],"in":[92],"more":[94],"manner":[96],"than":[97],"it":[98],"actually":[100],"done,":[101],"where":[102],"larger":[103],"variations":[104],"output":[106],"avoided":[108],"especially":[109],"nuclear":[111],"lignite-fired":[113],"plants.":[115],"The":[116],"used":[120],"analyzing":[122],"future":[123],"scenarios":[125],"high":[127],"shares":[128],"variable":[130],"renewable":[131],"(VRE),":[133],"help":[135],"answering":[136],"research":[137],"questions":[138],"related":[139],"to":[140],"required":[142],"system":[143],"flexibility":[144],"balancing":[146],"out":[147],"VRE":[148],"fluctuations.":[149]},"counts_by_year":[{"year":2023,"cited_by_count":2},{"year":2022,"cited_by_count":1},{"year":2020,"cited_by_count":1},{"year":2019,"cited_by_count":2}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
