{"id":"https://openalex.org/W2002326780","doi":"https://doi.org/10.1109/ccece.2014.6900973","title":"Prioritization of underground transmission cable renewal projects in power electric utility companies","display_name":"Prioritization of underground transmission cable renewal projects in power electric utility companies","publication_year":2014,"publication_date":"2014-05-01","ids":{"openalex":"https://openalex.org/W2002326780","doi":"https://doi.org/10.1109/ccece.2014.6900973","mag":"2002326780"},"language":"en","primary_location":{"id":"doi:10.1109/ccece.2014.6900973","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ccece.2014.6900973","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2014 IEEE 27th Canadian Conference on Electrical and Computer Engineering (CCECE)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5003735342","display_name":"Kings Wong","orcid":null},"institutions":[{"id":"https://openalex.org/I6615443","display_name":"Hydro One (Canada)","ror":"https://ror.org/01q4pk532","country_code":"CA","type":"company","lineage":["https://openalex.org/I6615443"]}],"countries":["CA"],"is_corresponding":true,"raw_author_name":"Kings Wong","raw_affiliation_strings":["Transmission Engineering, Hydro One Networks Inc., Toronto, Ontario, Canada"],"affiliations":[{"raw_affiliation_string":"Transmission Engineering, Hydro One Networks Inc., Toronto, Ontario, Canada","institution_ids":["https://openalex.org/I6615443"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":["https://openalex.org/A5003735342"],"corresponding_institution_ids":["https://openalex.org/I6615443"],"apc_list":null,"apc_paid":null,"fwci":0.4081,"has_fulltext":false,"cited_by_count":2,"citation_normalized_percentile":{"value":0.68846963,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":94},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T13689","display_name":"Underground infrastructure and sustainability","score":0.9973000288009644,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T13689","display_name":"Underground infrastructure and sustainability","score":0.9973000288009644,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12804","display_name":"Thermal Analysis in Power Transmission","score":0.9860000014305115,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12233","display_name":"Geotechnical Engineering and Underground Structures","score":0.9768999814987183,"subfield":{"id":"https://openalex.org/subfields/2205","display_name":"Civil and Structural Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/electric-power-transmission","display_name":"Electric power transmission","score":0.5920059084892273},{"id":"https://openalex.org/keywords/asset","display_name":"Asset (computer security)","score":0.5897297263145447},{"id":"https://openalex.org/keywords/asset-management","display_name":"Asset management","score":0.5508383512496948},{"id":"https://openalex.org/keywords/reliability","display_name":"Reliability (semiconductor)","score":0.5422741770744324},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.511982262134552},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.5011401176452637},{"id":"https://openalex.org/keywords/electric-utility","display_name":"Electric utility","score":0.4851861596107483},{"id":"https://openalex.org/keywords/power-transmission","display_name":"Power transmission","score":0.48467352986335754},{"id":"https://openalex.org/keywords/investment","display_name":"Investment (military)","score":0.47444450855255127},{"id":"https://openalex.org/keywords/electric-power-industry","display_name":"Electric power industry","score":0.4699547290802002},{"id":"https://openalex.org/keywords/ranking","display_name":"Ranking (information retrieval)","score":0.4649006128311157},{"id":"https://openalex.org/keywords/transmission","display_name":"Transmission (telecommunications)","score":0.4514630138874054},{"id":"https://openalex.org/keywords/electric-power","display_name":"Electric power","score":0.444920152425766},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.4113992750644684},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.3994379937648773},{"id":"https://openalex.org/keywords/risk-analysis","display_name":"Risk analysis (engineering)","score":0.38476720452308655},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.35919052362442017},{"id":"https://openalex.org/keywords/telecommunications","display_name":"Telecommunications","score":0.3094961643218994},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.29677945375442505},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.22979778051376343},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.18511882424354553},{"id":"https://openalex.org/keywords/finance","display_name":"Finance","score":0.16827312111854553},{"id":"https://openalex.org/keywords/computer-security","display_name":"Computer security","score":0.10261711478233337}],"concepts":[{"id":"https://openalex.org/C140311924","wikidata":"https://www.wikidata.org/wiki/Q200928","display_name":"Electric power transmission","level":2,"score":0.5920059084892273},{"id":"https://openalex.org/C76178495","wikidata":"https://www.wikidata.org/wiki/Q4808784","display_name":"Asset (computer security)","level":2,"score":0.5897297263145447},{"id":"https://openalex.org/C2776517139","wikidata":"https://www.wikidata.org/wiki/Q873442","display_name":"Asset management","level":2,"score":0.5508383512496948},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.5422741770744324},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.511982262134552},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.5011401176452637},{"id":"https://openalex.org/C2777819126","wikidata":"https://www.wikidata.org/wiki/Q1326624","display_name":"Electric utility","level":2,"score":0.4851861596107483},{"id":"https://openalex.org/C92018576","wikidata":"https://www.wikidata.org/wiki/Q3242194","display_name":"Power transmission","level":3,"score":0.48467352986335754},{"id":"https://openalex.org/C27548731","wikidata":"https://www.wikidata.org/wiki/Q88272","display_name":"Investment (military)","level":3,"score":0.47444450855255127},{"id":"https://openalex.org/C170777988","wikidata":"https://www.wikidata.org/wiki/Q2316331","display_name":"Electric power industry","level":3,"score":0.4699547290802002},{"id":"https://openalex.org/C189430467","wikidata":"https://www.wikidata.org/wiki/Q7293293","display_name":"Ranking (information retrieval)","level":2,"score":0.4649006128311157},{"id":"https://openalex.org/C761482","wikidata":"https://www.wikidata.org/wiki/Q118093","display_name":"Transmission (telecommunications)","level":2,"score":0.4514630138874054},{"id":"https://openalex.org/C40293303","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electric power","level":3,"score":0.444920152425766},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4113992750644684},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3994379937648773},{"id":"https://openalex.org/C112930515","wikidata":"https://www.wikidata.org/wiki/Q4389547","display_name":"Risk analysis (engineering)","level":1,"score":0.38476720452308655},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.35919052362442017},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.3094961643218994},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.29677945375442505},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.22979778051376343},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.18511882424354553},{"id":"https://openalex.org/C10138342","wikidata":"https://www.wikidata.org/wiki/Q43015","display_name":"Finance","level":1,"score":0.16827312111854553},{"id":"https://openalex.org/C38652104","wikidata":"https://www.wikidata.org/wiki/Q3510521","display_name":"Computer security","level":1,"score":0.10261711478233337},{"id":"https://openalex.org/C119857082","wikidata":"https://www.wikidata.org/wiki/Q2539","display_name":"Machine learning","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C94625758","wikidata":"https://www.wikidata.org/wiki/Q7163","display_name":"Politics","level":2,"score":0.0},{"id":"https://openalex.org/C199539241","wikidata":"https://www.wikidata.org/wiki/Q7748","display_name":"Law","level":1,"score":0.0},{"id":"https://openalex.org/C17744445","wikidata":"https://www.wikidata.org/wiki/Q36442","display_name":"Political science","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ccece.2014.6900973","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ccece.2014.6900973","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2014 IEEE 27th Canadian Conference on Electrical and Computer Engineering (CCECE)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","score":0.5400000214576721,"id":"https://metadata.un.org/sdg/9"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W2142945692","https://openalex.org/W2248218093","https://openalex.org/W2356512289","https://openalex.org/W2018241648","https://openalex.org/W2494773096","https://openalex.org/W1629635549","https://openalex.org/W2059531314","https://openalex.org/W2348819278","https://openalex.org/W134494305","https://openalex.org/W169569283"],"abstract_inverted_index":{"This":[0,38],"paper":[1,39],"reviews":[2],"the":[3,15,25,45,65,72,82,88],"current":[4,26,46],"asset":[5,35,59],"management":[6],"methodologies":[7,27],"in":[8,28,81],"power":[9,83,90],"electric":[10],"utility":[11,22],"companies":[12,23],"and":[13,18,30,54,69],"identifies":[14],"present":[16],"challenges":[17],"problems":[19],"encountered":[20],"by":[21],"with":[24],"managing":[29],"prioritizing":[31],"underground":[32,56],"transmission":[33,57,78],"cable":[34,58],"renewal":[36,60],"projects.":[37],"proposes":[40],"as":[41,85],"an":[42],"addition":[43],"to":[44],"methodologies,":[47],"a":[48,76],"more":[49],"systematic":[50],"framework":[51],"for":[52],"evaluating":[53],"ranking":[55],"investment":[61],"projects":[62],"based":[63],"on":[64,70],"modelling":[66],"of":[67,75],"uncertainties":[68],"determining":[71],"relative":[73],"importance":[74],"particular":[77],"line":[79],"circuit":[80],"system":[84,91],"it":[86],"affects":[87],"bulk":[89],"reliability.":[92]},"counts_by_year":[{"year":2016,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
