{"id":"https://openalex.org/W4246946907","doi":"https://doi.org/10.1109/wsc.2015.7408441","title":"Throughput and flow-time in a production line with partial machine availability and imperfect quality processing","display_name":"Throughput and flow-time in a production line with partial machine availability and imperfect quality processing","publication_year":2015,"publication_date":"2015-12-01","ids":{"openalex":"https://openalex.org/W4246946907","doi":"https://doi.org/10.1109/wsc.2015.7408441"},"language":"en","primary_location":{"id":"doi:10.1109/wsc.2015.7408441","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2015.7408441","pdf_url":null,"source":{"id":"https://openalex.org/S4363607791","display_name":"2015 Winter Simulation Conference (WSC)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 Winter Simulation Conference (WSC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5059468605","display_name":"Maayan Eyal","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Maayan Eyal","raw_affiliation_strings":["Industrial Engineering and Management, University of the Negev Beer-Sheva, Israel"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Industrial Engineering and Management, University of the Negev Beer-Sheva, Israel","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5019618326","display_name":"Israel Tirkel","orcid":"https://orcid.org/0000-0001-6331-7919"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Israel Tirkel","raw_affiliation_strings":["Industrial Engineering and Management, University of the Negev Beer-Sheva, Israel"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Industrial Engineering and Management, University of the Negev Beer-Sheva, Israel","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.58991228,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"3144","last_page":"3145"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9860000014305115,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9860000014305115,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9785000085830688,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10974","display_name":"Advanced Queuing Theory Analysis","score":0.9735000133514404,"subfield":{"id":"https://openalex.org/subfields/1404","display_name":"Management Information Systems"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/throughput","display_name":"Throughput","score":0.8643885850906372},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.7364133596420288},{"id":"https://openalex.org/keywords/discrete-event-simulation","display_name":"Discrete event simulation","score":0.7197694778442383},{"id":"https://openalex.org/keywords/queueing-theory","display_name":"Queueing theory","score":0.6390420794487},{"id":"https://openalex.org/keywords/markov-chain","display_name":"Markov chain","score":0.5868255496025085},{"id":"https://openalex.org/keywords/production-line","display_name":"Production line","score":0.5553784966468811},{"id":"https://openalex.org/keywords/quality","display_name":"Quality (philosophy)","score":0.5385794043540955},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.5211848616600037},{"id":"https://openalex.org/keywords/imperfect","display_name":"Imperfect","score":0.501356840133667},{"id":"https://openalex.org/keywords/constraint","display_name":"Constraint (computer-aided design)","score":0.47729432582855225},{"id":"https://openalex.org/keywords/flow","display_name":"Flow (mathematics)","score":0.4596002697944641},{"id":"https://openalex.org/keywords/real-time-computing","display_name":"Real-time computing","score":0.4425645172595978},{"id":"https://openalex.org/keywords/work","display_name":"Work (physics)","score":0.43197470903396606},{"id":"https://openalex.org/keywords/flow-line","display_name":"Flow line","score":0.4267342686653137},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.3825770318508148},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.27148646116256714},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.14301741123199463},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.08239752054214478},{"id":"https://openalex.org/keywords/computer-network","display_name":"Computer network","score":0.08222520351409912}],"concepts":[{"id":"https://openalex.org/C157764524","wikidata":"https://www.wikidata.org/wiki/Q1383412","display_name":"Throughput","level":3,"score":0.8643885850906372},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.7364133596420288},{"id":"https://openalex.org/C147203929","wikidata":"https://www.wikidata.org/wiki/Q574814","display_name":"Discrete event simulation","level":2,"score":0.7197694778442383},{"id":"https://openalex.org/C22684755","wikidata":"https://www.wikidata.org/wiki/Q847526","display_name":"Queueing theory","level":2,"score":0.6390420794487},{"id":"https://openalex.org/C98763669","wikidata":"https://www.wikidata.org/wiki/Q176645","display_name":"Markov chain","level":2,"score":0.5868255496025085},{"id":"https://openalex.org/C99862985","wikidata":"https://www.wikidata.org/wiki/Q10858068","display_name":"Production line","level":2,"score":0.5553784966468811},{"id":"https://openalex.org/C2779530757","wikidata":"https://www.wikidata.org/wiki/Q1207505","display_name":"Quality (philosophy)","level":2,"score":0.5385794043540955},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.5211848616600037},{"id":"https://openalex.org/C2780310539","wikidata":"https://www.wikidata.org/wiki/Q12547192","display_name":"Imperfect","level":2,"score":0.501356840133667},{"id":"https://openalex.org/C2776036281","wikidata":"https://www.wikidata.org/wiki/Q48769818","display_name":"Constraint (computer-aided design)","level":2,"score":0.47729432582855225},{"id":"https://openalex.org/C38349280","wikidata":"https://www.wikidata.org/wiki/Q1434290","display_name":"Flow (mathematics)","level":2,"score":0.4596002697944641},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.4425645172595978},{"id":"https://openalex.org/C18762648","wikidata":"https://www.wikidata.org/wiki/Q42213","display_name":"Work (physics)","level":2,"score":0.43197470903396606},{"id":"https://openalex.org/C2777425979","wikidata":"https://www.wikidata.org/wiki/Q5462102","display_name":"Flow line","level":2,"score":0.4267342686653137},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.3825770318508148},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.27148646116256714},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.14301741123199463},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.08239752054214478},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.08222520351409912},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.0},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C119857082","wikidata":"https://www.wikidata.org/wiki/Q2539","display_name":"Machine learning","level":1,"score":0.0},{"id":"https://openalex.org/C111472728","wikidata":"https://www.wikidata.org/wiki/Q9471","display_name":"Epistemology","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C138885662","wikidata":"https://www.wikidata.org/wiki/Q5891","display_name":"Philosophy","level":0,"score":0.0},{"id":"https://openalex.org/C78762247","wikidata":"https://www.wikidata.org/wiki/Q1273174","display_name":"Petroleum engineering","level":1,"score":0.0},{"id":"https://openalex.org/C41895202","wikidata":"https://www.wikidata.org/wiki/Q8162","display_name":"Linguistics","level":1,"score":0.0},{"id":"https://openalex.org/C555944384","wikidata":"https://www.wikidata.org/wiki/Q249","display_name":"Wireless","level":2,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/wsc.2015.7408441","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2015.7408441","pdf_url":null,"source":{"id":"https://openalex.org/S4363607791","display_name":"2015 Winter Simulation Conference (WSC)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 Winter Simulation Conference (WSC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W4230481896","https://openalex.org/W1991553621","https://openalex.org/W53657248","https://openalex.org/W2797123356","https://openalex.org/W4251418304","https://openalex.org/W1568460953","https://openalex.org/W2967610137","https://openalex.org/W147520506","https://openalex.org/W2004643596","https://openalex.org/W2299822401"],"abstract_inverted_index":{"Machine":[0],"availability":[1,27],"and":[2,18,28,45,66],"quality":[3,30],"performance":[4,75],"can":[5],"significantly":[6],"constraint":[7],"the":[8,16,46,62,67,70],"operation":[9],"of":[10,20,37,69],"production":[11,23,39],"systems.":[12],"This":[13],"work":[14],"investigates":[15],"throughput":[17],"flow-time":[19],"a":[21,38],"serial":[22],"line,":[24],"considering":[25],"partial":[26],"imperfect":[29],"processing.":[31],"The":[32,49],"study":[33],"develops":[34],"analytical":[35,50],"models":[36],"system":[40],"based":[41],"on":[42,73],"Markov":[43],"Chains":[44],"Queuing":[47],"Theory.":[48],"model's":[51,71],"results":[52,60],"are":[53],"verified":[54],"using":[55],"discrete":[56],"event":[57],"simulation.":[58],"Preliminary":[59],"exhibit":[61],"most":[63],"throughput-constrained":[64],"station":[65],"impact":[68],"parameters":[72],"selected":[74],"measurements.":[76]},"counts_by_year":[],"updated_date":"2026-06-11T09:08:48.828518","created_date":"2025-10-10T00:00:00"}
