{"id":"https://openalex.org/W3151169628","doi":"https://doi.org/10.1109/wsc.2007.4419813","title":"Simulation improves end-of-line sortation and material handling pickup scheduling at appliance manufacturer","display_name":"Simulation improves end-of-line sortation and material handling pickup scheduling at appliance manufacturer","publication_year":2007,"publication_date":"2007-12-01","ids":{"openalex":"https://openalex.org/W3151169628","doi":"https://doi.org/10.1109/wsc.2007.4419813","mag":"3151169628"},"language":"en","primary_location":{"id":"doi:10.1109/wsc.2007.4419813","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2007.4419813","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2007 Winter Simulation Conference","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5070486915","display_name":"Neelesh Kale","orcid":null},"institutions":[{"id":"https://openalex.org/I4210130704","display_name":"University of Michigan\u2013Dearborn","ror":"https://ror.org/035wtm547","country_code":"US","type":"education","lineage":["https://openalex.org/I4210130704"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"Neelesh Kale","raw_affiliation_strings":["Production Modeling Corporation, Dearborn, U.S.A"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Production Modeling Corporation, Dearborn, U.S.A","institution_ids":["https://openalex.org/I4210130704"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5016790804","display_name":"Marcelo Zottolo","orcid":null},"institutions":[{"id":"https://openalex.org/I4210130704","display_name":"University of Michigan\u2013Dearborn","ror":"https://ror.org/035wtm547","country_code":"US","type":"education","lineage":["https://openalex.org/I4210130704"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"Marcelo Zottolo","raw_affiliation_strings":["Production Modeling Corporation, Dearborn, U.S.A"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Production Modeling Corporation, Dearborn, U.S.A","institution_ids":["https://openalex.org/I4210130704"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5008318949","display_name":"Onur M. Uelgen","orcid":null},"institutions":[{"id":"https://openalex.org/I4210130704","display_name":"University of Michigan\u2013Dearborn","ror":"https://ror.org/035wtm547","country_code":"US","type":"education","lineage":["https://openalex.org/I4210130704"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"Onur M. Uelgen","raw_affiliation_strings":["Industrial & Manufacturing Systems Eng., Engineering Complex, University of Michigan - Dearborn, 4901 Evergreen Road , 48128, U.S.A"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Industrial & Manufacturing Systems Eng., Engineering Complex, University of Michigan - Dearborn, 4901 Evergreen Road , 48128, U.S.A","institution_ids":["https://openalex.org/I4210130704"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5105347678","display_name":"Edward J. Williams","orcid":"https://orcid.org/0000-0003-0240-831X"},"institutions":[{"id":"https://openalex.org/I4210130704","display_name":"University of Michigan\u2013Dearborn","ror":"https://ror.org/035wtm547","country_code":"US","type":"education","lineage":["https://openalex.org/I4210130704"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"Edward J. Williams","raw_affiliation_strings":["Industrial & Manufacturing Systems Eng. Engineering Complex, University of Michigan ??? Dearborn, Dearborn, MI, U.S.A"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Industrial & Manufacturing Systems Eng. Engineering Complex, University of Michigan ??? Dearborn, Dearborn, MI, U.S.A","institution_ids":["https://openalex.org/I4210130704"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I4210130704"],"apc_list":null,"apc_paid":null,"fwci":0.7807,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.77757825,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1863","last_page":"1868"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9994000196456909,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9994000196456909,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9994000196456909,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9922999739646912,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/bottleneck","display_name":"Bottleneck","score":0.8286578059196472},{"id":"https://openalex.org/keywords/downtime","display_name":"Downtime","score":0.7850371599197388},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6794809699058533},{"id":"https://openalex.org/keywords/pickup","display_name":"Pickup","score":0.6329149603843689},{"id":"https://openalex.org/keywords/assembly-line","display_name":"Assembly line","score":0.618267834186554},{"id":"https://openalex.org/keywords/discrete-event-simulation","display_name":"Discrete event simulation","score":0.5952145457267761},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5210694074630737},{"id":"https://openalex.org/keywords/productivity","display_name":"Productivity","score":0.5208378434181213},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.4265884459018707},{"id":"https://openalex.org/keywords/manufacturing","display_name":"Manufacturing","score":0.42023545503616333},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.38989222049713135},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.35470569133758545},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.29300957918167114},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.27386975288391113},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.22530174255371094},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.2225930392742157},{"id":"https://openalex.org/keywords/routing","display_name":"Routing (electronic design automation)","score":0.14460453391075134},{"id":"https://openalex.org/keywords/computer-network","display_name":"Computer network","score":0.11943820118904114},{"id":"https://openalex.org/keywords/embedded-system","display_name":"Embedded system","score":0.10919347405433655},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.10280343890190125}],"concepts":[{"id":"https://openalex.org/C2780513914","wikidata":"https://www.wikidata.org/wiki/Q18210350","display_name":"Bottleneck","level":2,"score":0.8286578059196472},{"id":"https://openalex.org/C180591934","wikidata":"https://www.wikidata.org/wiki/Q1253369","display_name":"Downtime","level":2,"score":0.7850371599197388},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6794809699058533},{"id":"https://openalex.org/C2776221269","wikidata":"https://www.wikidata.org/wiki/Q572648","display_name":"Pickup","level":3,"score":0.6329149603843689},{"id":"https://openalex.org/C3019666875","wikidata":"https://www.wikidata.org/wiki/Q455037","display_name":"Assembly line","level":2,"score":0.618267834186554},{"id":"https://openalex.org/C147203929","wikidata":"https://www.wikidata.org/wiki/Q574814","display_name":"Discrete event simulation","level":2,"score":0.5952145457267761},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5210694074630737},{"id":"https://openalex.org/C204983608","wikidata":"https://www.wikidata.org/wiki/Q2111958","display_name":"Productivity","level":2,"score":0.5208378434181213},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.4265884459018707},{"id":"https://openalex.org/C175700187","wikidata":"https://www.wikidata.org/wiki/Q187939","display_name":"Manufacturing","level":2,"score":0.42023545503616333},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.38989222049713135},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.35470569133758545},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.29300957918167114},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.27386975288391113},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.22530174255371094},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.2225930392742157},{"id":"https://openalex.org/C74172769","wikidata":"https://www.wikidata.org/wiki/Q1446839","display_name":"Routing (electronic design automation)","level":2,"score":0.14460453391075134},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.11943820118904114},{"id":"https://openalex.org/C149635348","wikidata":"https://www.wikidata.org/wiki/Q193040","display_name":"Embedded system","level":1,"score":0.10919347405433655},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.10280343890190125},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C115961682","wikidata":"https://www.wikidata.org/wiki/Q860623","display_name":"Image (mathematics)","level":2,"score":0.0},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.0}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.1109/wsc.2007.4419813","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2007.4419813","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2007 Winter Simulation Conference","raw_type":"proceedings-article"},{"id":"pmh:oai:CiteSeerX.psu:10.1.1.172.1417","is_oa":false,"landing_page_url":"http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.172.1417","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":"http://www.informs-sim.org/wsc07papers/232.pdf","raw_type":"text"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":8,"referenced_works":["https://openalex.org/W1022753425","https://openalex.org/W2052273502","https://openalex.org/W2155796842","https://openalex.org/W3151581232","https://openalex.org/W4238502321","https://openalex.org/W4247998470","https://openalex.org/W4256265796","https://openalex.org/W6626560006"],"related_works":["https://openalex.org/W2046276983","https://openalex.org/W2954002293","https://openalex.org/W2892741875","https://openalex.org/W2164372000","https://openalex.org/W2078264086","https://openalex.org/W2109143577","https://openalex.org/W1985537075","https://openalex.org/W2161582432","https://openalex.org/W1972812226","https://openalex.org/W2185313546"],"abstract_inverted_index":{"The":[0,109],"most":[1,5],"venerable":[2],"and":[3,16,49,54,66,75,92,129],"the":[4,23,27,80,101,106,117],"highly":[6],"varied":[7],"general":[8],"application":[9,111],"area":[10],"in":[11,70,85,97,105,113],"which":[12,71],"simulation":[13,32,58,82],"has":[14,59,83,95],"frequently":[15],"repeatedly":[17],"proved":[18,60,116],"its":[19],"economic":[20,87],"value":[21],"is":[22],"manufacturing":[24,107,110],"sector":[25],"of":[26,31,39,45,63,79,120,125,137,139],"economy.":[28],"Manufacturing":[29],"applications":[30],"have":[33],"included":[34],"attention":[35],"to":[36],"complex":[37],"issues":[38],"equipment":[40],"and/or":[41],"worker":[42],"downtime,":[43],"problems":[44],"facility":[46],"layout,":[47],"work":[48],"line":[50],"balancing,":[51],"bottleneck":[52],"analysis,":[53],"material":[55],"handling.":[56],"Furthermore,":[57],"itself":[61],"capable":[62],"addressing":[64],"productivity":[65],"efficiency":[67],"improvement":[68],"tasks":[69],"these":[72],"complexities":[73],"overlap":[74],"interact.":[76],"Historically,":[77],"much":[78],"success":[81],"enjoyed":[84],"other":[86],"sectors":[88],"(e.g.,":[89],"service,":[90],"transportation,":[91],"health":[93],"care)":[94],"stemmed":[96],"large":[98],"measure":[99],"from":[100],"reputation":[102],"it":[103],"earned":[104],"sector.":[108],"described":[112],"this":[114],"paper":[115],"cost-effective":[118],"feasibility":[119],"designing":[121],"sortation":[122],"operations":[123],"downstream":[124],"an":[126],"assembly":[127],"line,":[128],"scheduling":[130],"SKU":[131],"pickups":[132],"there,":[133],"with":[134],"no":[135],"risk":[136],"blockage":[138],"that":[140],"line.":[141]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
