{"id":"https://openalex.org/W4243619101","doi":"https://doi.org/10.1109/wsc.2005.1574495","title":"Validating the Capacity Planning Process and Flowline Product Sequencing Through Simulation Analysis","display_name":"Validating the Capacity Planning Process and Flowline Product Sequencing Through Simulation Analysis","publication_year":2006,"publication_date":"2006-01-25","ids":{"openalex":"https://openalex.org/W4243619101","doi":"https://doi.org/10.1109/wsc.2005.1574495"},"language":"en","primary_location":{"id":"doi:10.1109/wsc.2005.1574495","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2005.1574495","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the Winter Simulation Conference, 2005.","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5044390721","display_name":"J.H. Marvel","orcid":null},"institutions":[{"id":"https://openalex.org/I176113532","display_name":"Gettysburg College","ror":"https://ror.org/045e26x92","country_code":"US","type":"education","lineage":["https://openalex.org/I176113532"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"J.H. Marvel","raw_affiliation_strings":["Department of Management, Gettysburg College, Gettysburg, PA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Management, Gettysburg College, Gettysburg, PA, USA","institution_ids":["https://openalex.org/I176113532"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5040613995","display_name":"M.A. Schaub","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"M.A. Schaub","raw_affiliation_strings":["Mark Schaub Consulting, Mount Pleasant, SC, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Mark Schaub Consulting, Mount Pleasant, SC, USA","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5079889458","display_name":"G. Weckman","orcid":null},"institutions":[{"id":"https://openalex.org/I4210106879","display_name":"Ohio University","ror":"https://ror.org/01jr3y717","country_code":"US","type":"education","lineage":["https://openalex.org/I4210106879"]}],"countries":["US"],"is_corresponding":false,"raw_author_name":"G. Weckman","raw_affiliation_strings":["Industrial and Manufacturing Systems Engineering, Ohio University, Athens, OH, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Industrial and Manufacturing Systems Engineering, Ohio University, Athens, OH, USA","institution_ids":["https://openalex.org/I4210106879"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":null,"has_fulltext":false,"cited_by_count":4,"citation_normalized_percentile":null,"cited_by_percentile_year":null,"biblio":{"volume":"69","issue":null,"first_page":"2112","last_page":"2118"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.878600001335144,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.878600001335144,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.6406035423278809},{"id":"https://openalex.org/keywords/production-schedule","display_name":"Production schedule","score":0.6047616600990295},{"id":"https://openalex.org/keywords/production-planning","display_name":"Production planning","score":0.6023396253585815},{"id":"https://openalex.org/keywords/capacity-planning","display_name":"Capacity planning","score":0.5879412293434143},{"id":"https://openalex.org/keywords/discrete-event-simulation","display_name":"Discrete event simulation","score":0.5748991966247559},{"id":"https://openalex.org/keywords/material-requirements-planning","display_name":"Material requirements planning","score":0.5608296394348145},{"id":"https://openalex.org/keywords/process","display_name":"Process (computing)","score":0.5317479372024536},{"id":"https://openalex.org/keywords/planner","display_name":"Planner","score":0.5293862223625183},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5119929909706116},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.4664679765701294},{"id":"https://openalex.org/keywords/product","display_name":"Product (mathematics)","score":0.4534081518650055},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.3634551465511322},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.3393571078777313},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.2592576742172241},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.25270432233810425},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.1653355360031128},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.15486791729927063}],"concepts":[{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.6406035423278809},{"id":"https://openalex.org/C2778420936","wikidata":"https://www.wikidata.org/wiki/Q7247843","display_name":"Production schedule","level":3,"score":0.6047616600990295},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.6023396253585815},{"id":"https://openalex.org/C2781007418","wikidata":"https://www.wikidata.org/wiki/Q1456934","display_name":"Capacity planning","level":2,"score":0.5879412293434143},{"id":"https://openalex.org/C147203929","wikidata":"https://www.wikidata.org/wiki/Q574814","display_name":"Discrete event simulation","level":2,"score":0.5748991966247559},{"id":"https://openalex.org/C167523981","wikidata":"https://www.wikidata.org/wiki/Q1365335","display_name":"Material requirements planning","level":3,"score":0.5608296394348145},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.5317479372024536},{"id":"https://openalex.org/C2776999362","wikidata":"https://www.wikidata.org/wiki/Q2349274","display_name":"Planner","level":2,"score":0.5293862223625183},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5119929909706116},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.4664679765701294},{"id":"https://openalex.org/C90673727","wikidata":"https://www.wikidata.org/wiki/Q901718","display_name":"Product (mathematics)","level":2,"score":0.4534081518650055},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.3634551465511322},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.3393571078777313},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.2592576742172241},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.25270432233810425},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.1653355360031128},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.15486791729927063},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0},{"id":"https://openalex.org/C199360897","wikidata":"https://www.wikidata.org/wiki/Q9143","display_name":"Programming language","level":1,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/wsc.2005.1574495","is_oa":false,"landing_page_url":"https://doi.org/10.1109/wsc.2005.1574495","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of the Winter Simulation Conference, 2005.","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":12,"referenced_works":["https://openalex.org/W1535178592","https://openalex.org/W2033692247","https://openalex.org/W2048992594","https://openalex.org/W2114157703","https://openalex.org/W2120195644","https://openalex.org/W2124836141","https://openalex.org/W2131487880","https://openalex.org/W2145115125","https://openalex.org/W4231160368","https://openalex.org/W4234322626","https://openalex.org/W4236671938","https://openalex.org/W4243349786"],"related_works":["https://openalex.org/W2592044638","https://openalex.org/W2598323587","https://openalex.org/W2157883499","https://openalex.org/W2135486778","https://openalex.org/W2979257608","https://openalex.org/W3109331497","https://openalex.org/W2790122409","https://openalex.org/W2155699122","https://openalex.org/W2107328659","https://openalex.org/W1569644135"],"abstract_inverted_index":{"This":[0],"article":[1],"illustrates":[2],"the":[3,10,23,35,38,45,53,74,77,81,95,103,115,119,126,138,147],"integration":[4],"of":[5,14,37,44,76,80],"discrete":[6],"event":[7],"simulation":[8],"into":[9,86],"capacity":[11,24,64,104],"planning":[12,25,65,105,120],"process":[13,26,66,106,140],"a":[15,31,71,111],"tier":[16],"two":[17],"automobile":[18],"supplier.":[19],"In":[20],"this":[21],"application,":[22],"is":[27,49,99],"able":[28],"to":[29,55,59,69,101],"generate":[30,110],"feasible":[32,112],"schedule":[33,48,72,113],"for":[34,73,114,128,135,146],"30%":[36],"product":[39,82],"line":[40,83],"which":[41],"generates":[42],"80%":[43],"business.":[46],"The":[47,63],"\"feasible\"":[50],"based":[51],"on":[52],"ability":[54],"produce":[56],"sufficient":[57],"inventory":[58],"cover":[60],"customer":[61,90,129],"demand.":[62],"was":[67],"unable":[68],"develop":[70],"production":[75,96,139],"remaining":[78,116],"70%":[79],"or":[84],"take":[85],"account":[87],"shortages":[88],"in":[89,94,137],"supplied":[91,130],"materials":[92],"used":[93,100],"process.":[97],"Simulation":[98],"validate":[102],"as":[107,109,122],"well":[108,123],"products":[117],"during":[118],"period":[121],"as:":[124],"evaluating":[125],"plan":[127],"materials;":[131],"identifying":[132],"potential":[133],"areas":[134],"improvement":[136],"and":[141],"determining":[142],"material":[143],"storage":[144],"requirements":[145],"facilities":[148],"planner.":[149]},"counts_by_year":[{"year":2022,"cited_by_count":1},{"year":2013,"cited_by_count":1}],"updated_date":"2026-07-28T07:46:37.118299","created_date":"2025-10-10T00:00:00"}
