{"id":"https://openalex.org/W4410887143","doi":"https://doi.org/10.1109/syscon64521.2025.11014839","title":"Optimizing Wind Power Integration in Microgrids via Dynamic Line Rating and EV Scheduling: A Coordinated Approach","display_name":"Optimizing Wind Power Integration in Microgrids via Dynamic Line Rating and EV Scheduling: A Coordinated Approach","publication_year":2025,"publication_date":"2025-04-07","ids":{"openalex":"https://openalex.org/W4410887143","doi":"https://doi.org/10.1109/syscon64521.2025.11014839"},"language":"en","primary_location":{"id":"doi:10.1109/syscon64521.2025.11014839","is_oa":false,"landing_page_url":"https://doi.org/10.1109/syscon64521.2025.11014839","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2025 IEEE International systems Conference (SysCon)","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5112967143","display_name":"T. Song","orcid":null},"institutions":[{"id":"https://openalex.org/I139322472","display_name":"Universiti Sains Malaysia","ror":"https://ror.org/02rgb2k63","country_code":"MY","type":"education","lineage":["https://openalex.org/I139322472"]}],"countries":["MY"],"is_corresponding":false,"raw_author_name":"Tianhua Song","raw_affiliation_strings":["School of Electrical and Electronic Engineering, Engineering Campus, Universiti Sains Malaysia (USM),Penang,Malaysia"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical and Electronic Engineering, Engineering Campus, Universiti Sains Malaysia (USM),Penang,Malaysia","institution_ids":["https://openalex.org/I139322472"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5042023563","display_name":"Jiashen Teh","orcid":"https://orcid.org/0000-0001-9741-6245"},"institutions":[{"id":"https://openalex.org/I139322472","display_name":"Universiti Sains Malaysia","ror":"https://ror.org/02rgb2k63","country_code":"MY","type":"education","lineage":["https://openalex.org/I139322472"]}],"countries":["MY"],"is_corresponding":false,"raw_author_name":"Jiashen Teh","raw_affiliation_strings":["School of Electrical and Electronic Engineering, Engineering Campus, Universiti Sains Malaysia (USM),Penang,Malaysia"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical and Electronic Engineering, Engineering Campus, Universiti Sains Malaysia (USM),Penang,Malaysia","institution_ids":["https://openalex.org/I139322472"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5019780601","display_name":"Ching\u2010Ming Lai","orcid":"https://orcid.org/0000-0002-7224-3955"},"institutions":[{"id":"https://openalex.org/I162838928","display_name":"National Chung Hsing University","ror":"https://ror.org/05vn3ca78","country_code":"TW","type":"education","lineage":["https://openalex.org/I162838928"]}],"countries":["TW"],"is_corresponding":false,"raw_author_name":"Ching-Ming Lai","raw_affiliation_strings":["National Chung Hsing University,Department of Electrical Engineering,Taichung,Taiwan"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"National Chung Hsing University,Department of Electrical Engineering,Taichung,Taiwan","institution_ids":["https://openalex.org/I162838928"]}]}],"institutions":[],"countries_distinct_count":2,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":3.3874,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.86980079,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":94,"max":97},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"7"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.998199999332428,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.998199999332428,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13183","display_name":"Islanding Detection in Power Systems","score":0.9970999956130981,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10740","display_name":"Wind Turbine Control Systems","score":0.9930999875068665,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.5926928520202637},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.582931637763977},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5508890748023987},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.4542525112628937},{"id":"https://openalex.org/keywords/line","display_name":"Line (geometry)","score":0.4184715449810028},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.4104797840118408},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.3401445746421814},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.31749051809310913},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.24799135327339172},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18875890970230103},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.17874562740325928},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.08695867657661438}],"concepts":[{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.5926928520202637},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.582931637763977},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5508890748023987},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4542525112628937},{"id":"https://openalex.org/C198352243","wikidata":"https://www.wikidata.org/wiki/Q37105","display_name":"Line (geometry)","level":2,"score":0.4184715449810028},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.4104797840118408},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.3401445746421814},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.31749051809310913},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.24799135327339172},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18875890970230103},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.17874562740325928},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.08695867657661438},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/syscon64521.2025.11014839","is_oa":false,"landing_page_url":"https://doi.org/10.1109/syscon64521.2025.11014839","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2025 IEEE International systems Conference (SysCon)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.8799999952316284,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":26,"referenced_works":["https://openalex.org/W1975833767","https://openalex.org/W1985015679","https://openalex.org/W2000982976","https://openalex.org/W2029581050","https://openalex.org/W2043294015","https://openalex.org/W2073630849","https://openalex.org/W2092860676","https://openalex.org/W2098854737","https://openalex.org/W2118003528","https://openalex.org/W2134752669","https://openalex.org/W2255390949","https://openalex.org/W2286754961","https://openalex.org/W2469348583","https://openalex.org/W2752734004","https://openalex.org/W2771507152","https://openalex.org/W2808286649","https://openalex.org/W2964250810","https://openalex.org/W2984985057","https://openalex.org/W3041016892","https://openalex.org/W4214488077","https://openalex.org/W4285791976","https://openalex.org/W4311162189","https://openalex.org/W4318407365","https://openalex.org/W4376113849","https://openalex.org/W4385259657","https://openalex.org/W4386918964"],"related_works":["https://openalex.org/W1974955413","https://openalex.org/W2022218967","https://openalex.org/W2049251811","https://openalex.org/W2140602680","https://openalex.org/W2557657611","https://openalex.org/W2147391888","https://openalex.org/W2557041521","https://openalex.org/W1972673637","https://openalex.org/W4200353840","https://openalex.org/W2343483905"],"abstract_inverted_index":{"As":[0],"the":[1,8,85,94,118],"global":[2],"energy":[3,33,62,123],"landscape":[4],"transitions":[5],"towards":[6],"sustainability,":[7],"integration":[9],"of":[10],"wind":[11,32,98],"power,":[12],"a":[13,27,76,110],"vital":[14],"renewable":[15,122],"resource,":[16],"becomes":[17],"increasingly":[18],"important":[19],"despite":[20],"its":[21],"intermittent":[22],"nature.":[23],"This":[24],"paper":[25],"presents":[26],"comprehensive":[28],"approach":[29,73],"to":[30,75,84,93],"optimize":[31],"utilization":[34],"within":[35],"microgrids":[36],"by":[37,102,121],"combining":[38],"Dynamic":[39],"Thermal":[40],"Line":[41],"Rating":[42],"(DTLR)":[43],"with":[44],"Electric":[45],"Vehicle":[46],"(EV)":[47],"scheduling.":[48],"The":[49],"proposed":[50],"method":[51,87],"dynamically":[52],"adapts":[53],"power":[54,99],"transmission":[55],"capabilities":[56],"while":[57],"utilizing":[58],"EVs":[59],"as":[60],"flexible":[61],"storage":[63],"units.":[64],"Simulation":[65],"results":[66],"from":[67],"case":[68],"studies":[69],"show":[70],"that":[71],"our":[72],"leads":[74],"24.6%":[77],"reduction":[78,91],"in":[79,113],"total":[80],"operational":[81],"costs":[82],"compared":[83,92],"STLR-only":[86],"and":[88,106,116],"an":[89],"11.6%":[90],"STLR+EV":[95],"method.":[96],"Additionally,":[97],"absorption":[100],"increased":[101],"41.7%":[103],"(STLR":[104],"only)":[105],"12.1%":[107],"(STLR+EV),":[108],"demonstrating":[109],"substantial":[111],"improvement":[112],"microgrid":[114],"sustainability":[115],"addressing":[117],"challenges":[119],"posed":[120],"integration.":[124]},"counts_by_year":[{"year":2026,"cited_by_count":1}],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
