{"id":"https://openalex.org/W1953931035","doi":"https://doi.org/10.1109/robot.1987.1088043","title":"Recovering schemes integrated in the production planning and control of flexible manufacturing systems","display_name":"Recovering schemes integrated in the production planning and control of flexible manufacturing systems","publication_year":2005,"publication_date":"2005-03-23","ids":{"openalex":"https://openalex.org/W1953931035","doi":"https://doi.org/10.1109/robot.1987.1088043","mag":"1953931035"},"language":"en","primary_location":{"id":"doi:10.1109/robot.1987.1088043","is_oa":false,"landing_page_url":"https://doi.org/10.1109/robot.1987.1088043","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings. 1987 IEEE International Conference on Robotics and Automation","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5108250812","display_name":"Claudio R. Bo\u00ebr","orcid":null},"institutions":[{"id":"https://openalex.org/I4210129181","display_name":"Tornos (Switzerland)","ror":"https://ror.org/03dt0c328","country_code":"CH","type":"company","lineage":["https://openalex.org/I4210129181"]}],"countries":["CH"],"is_corresponding":false,"raw_author_name":"C. Boer","raw_affiliation_strings":["Tornos-Bechler, Inc., Switzerland"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Tornos-Bechler, Inc., Switzerland","institution_ids":["https://openalex.org/I4210129181"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5043244357","display_name":"Franco Lombardi","orcid":"https://orcid.org/0000-0001-9702-6626"},"institutions":[{"id":"https://openalex.org/I177477856","display_name":"Politecnico di Torino","ror":"https://ror.org/00bgk9508","country_code":"IT","type":"education","lineage":["https://openalex.org/I177477856"]}],"countries":["IT"],"is_corresponding":false,"raw_author_name":"F. Lombardi","raw_affiliation_strings":["Politecnico di Torino, Torino, Italy"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Politecnico di Torino, Torino, Italy","institution_ids":["https://openalex.org/I177477856"]}]}],"institutions":[],"countries_distinct_count":2,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.15566714,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"4","issue":null,"first_page":"302","last_page":"308"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9972000122070312,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9972000122070312,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11741","display_name":"Flexible and Reconfigurable Manufacturing Systems","score":0.996999979019165,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9944999814033508,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.7174099683761597},{"id":"https://openalex.org/keywords/production-planning","display_name":"Production planning","score":0.7102396488189697},{"id":"https://openalex.org/keywords/control","display_name":"Control (management)","score":0.6506534814834595},{"id":"https://openalex.org/keywords/production-control","display_name":"Production control","score":0.6055334806442261},{"id":"https://openalex.org/keywords/production-line","display_name":"Production line","score":0.5495778322219849},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5220639109611511},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.5083269476890564},{"id":"https://openalex.org/keywords/integrated-business-planning","display_name":"Integrated business planning","score":0.5059873461723328},{"id":"https://openalex.org/keywords/control-system","display_name":"Control system","score":0.4559313952922821},{"id":"https://openalex.org/keywords/systems-engineering","display_name":"Systems engineering","score":0.40800631046295166},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.3362831473350525},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.1849622130393982}],"concepts":[{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.7174099683761597},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.7102396488189697},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.6506534814834595},{"id":"https://openalex.org/C2780682718","wikidata":"https://www.wikidata.org/wiki/Q16321575","display_name":"Production control","level":3,"score":0.6055334806442261},{"id":"https://openalex.org/C99862985","wikidata":"https://www.wikidata.org/wiki/Q10858068","display_name":"Production line","level":2,"score":0.5495778322219849},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5220639109611511},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.5083269476890564},{"id":"https://openalex.org/C191489605","wikidata":"https://www.wikidata.org/wiki/Q6043021","display_name":"Integrated business planning","level":2,"score":0.5059873461723328},{"id":"https://openalex.org/C17500928","wikidata":"https://www.wikidata.org/wiki/Q959968","display_name":"Control system","level":2,"score":0.4559313952922821},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.40800631046295166},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3362831473350525},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.1849622130393982},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/robot.1987.1088043","is_oa":false,"landing_page_url":"https://doi.org/10.1109/robot.1987.1088043","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings. 1987 IEEE International Conference on Robotics and Automation","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure","score":0.5299999713897705}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":5,"referenced_works":["https://openalex.org/W2080986072","https://openalex.org/W2109424601","https://openalex.org/W2314037522","https://openalex.org/W6670437093","https://openalex.org/W7065937902"],"related_works":["https://openalex.org/W2026960789","https://openalex.org/W2134329449","https://openalex.org/W2029316283","https://openalex.org/W1599706722","https://openalex.org/W2039633620","https://openalex.org/W2078765720","https://openalex.org/W2592044638","https://openalex.org/W2587222511","https://openalex.org/W3216508244","https://openalex.org/W2054131254"],"abstract_inverted_index":{"The":[0],"guidelines":[1],"of":[2,5,23,32,46],"the":[3,21,43],"design":[4],"an":[6],"Integrated":[7],"Production":[8],"Planning":[9],"and":[10],"Control":[11],"System":[12],"for":[13],"FMS":[14],"are":[15],"sketched,":[16],"with":[17,42],"special":[18],"emphasis":[19],"on":[20],"capability":[22],"managing":[24],"transients":[25],"due":[26],"to":[27],"unplanned":[28],"events":[29],"by":[30],"means":[31],"on-line":[33],"control":[34],"policies":[35],"which":[36],"can":[37],"be":[38],"selected":[39],"in":[40],"accordance":[41],"specific":[44],"requirements":[45],"particular":[47],"production":[48],"conditions.":[49]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
