{"id":"https://openalex.org/W2297918403","doi":"https://doi.org/10.1109/pscc.2016.7540954","title":"Towards optimal energy management of microgrids with a realistic model","display_name":"Towards optimal energy management of microgrids with a realistic model","publication_year":2016,"publication_date":"2016-06-01","ids":{"openalex":"https://openalex.org/W2297918403","doi":"https://doi.org/10.1109/pscc.2016.7540954","mag":"2297918403"},"language":"en","primary_location":{"id":"doi:10.1109/pscc.2016.7540954","is_oa":false,"landing_page_url":"https://doi.org/10.1109/pscc.2016.7540954","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2016 Power Systems Computation Conference (PSCC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5026813126","display_name":"Wuhua Hu","orcid":"https://orcid.org/0000-0002-7636-7031"},"institutions":[{"id":"https://openalex.org/I172675005","display_name":"Nanyang Technological University","ror":"https://ror.org/02e7b5302","country_code":"SG","type":"education","lineage":["https://openalex.org/I172675005"]},{"id":"https://openalex.org/I3005327000","display_name":"Institute for Infocomm Research","ror":"https://ror.org/053rfa017","country_code":"SG","type":"facility","lineage":["https://openalex.org/I115228651","https://openalex.org/I3005327000","https://openalex.org/I91275662"]}],"countries":["SG"],"is_corresponding":false,"raw_author_name":"Wuhua Hu","raw_affiliation_strings":["School of Electrical and Electronic Engineering, Nanyang Technological University, Singapore","Signal Processing Department, Institute for Infocomm Research, Singapore"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical and Electronic Engineering, Nanyang Technological University, Singapore","institution_ids":["https://openalex.org/I172675005"]},{"raw_affiliation_string":"Signal Processing Department, Institute for Infocomm Research, Singapore","institution_ids":["https://openalex.org/I3005327000"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100413044","display_name":"Ping Wang","orcid":"https://orcid.org/0000-0002-7773-469X"},"institutions":[{"id":"https://openalex.org/I172675005","display_name":"Nanyang Technological University","ror":"https://ror.org/02e7b5302","country_code":"SG","type":"education","lineage":["https://openalex.org/I172675005"]}],"countries":["SG"],"is_corresponding":false,"raw_author_name":"Ping Wang","raw_affiliation_strings":["School of Computer Engineering, Nanyang Technological University, Singapore"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Computer Engineering, Nanyang Technological University, Singapore","institution_ids":["https://openalex.org/I172675005"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5035518578","display_name":"Hoay Beng Gooi","orcid":"https://orcid.org/0000-0002-5983-2181"},"institutions":[{"id":"https://openalex.org/I172675005","display_name":"Nanyang Technological University","ror":"https://ror.org/02e7b5302","country_code":"SG","type":"education","lineage":["https://openalex.org/I172675005"]}],"countries":["SG"],"is_corresponding":false,"raw_author_name":"Hoay Beng Gooi","raw_affiliation_strings":["School of Electrical and Electronic Engineering, Nanyang Technological University, Singapore"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical and Electronic Engineering, Nanyang Technological University, Singapore","institution_ids":["https://openalex.org/I172675005"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.8101,"has_fulltext":false,"cited_by_count":7,"citation_normalized_percentile":{"value":0.73825535,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":95},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"7"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.9965999722480774,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/microgrid","display_name":"Microgrid","score":0.8540504574775696},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.6951388120651245},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6865139007568359},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.6162786483764648},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.584496796131134},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5725250840187073},{"id":"https://openalex.org/keywords/energy-management","display_name":"Energy management","score":0.49787473678588867},{"id":"https://openalex.org/keywords/economic-dispatch","display_name":"Economic dispatch","score":0.49339428544044495},{"id":"https://openalex.org/keywords/energy-storage","display_name":"Energy storage","score":0.4832649827003479},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.472893625497818},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.4479474723339081},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.41252854466438293},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.39418503642082214},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.36023077368736267},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.2217543125152588},{"id":"https://openalex.org/keywords/energy","display_name":"Energy (signal processing)","score":0.19350489974021912},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18629854917526245},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.10359415411949158}],"concepts":[{"id":"https://openalex.org/C2776784348","wikidata":"https://www.wikidata.org/wiki/Q5762595","display_name":"Microgrid","level":3,"score":0.8540504574775696},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.6951388120651245},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6865139007568359},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.6162786483764648},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.584496796131134},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5725250840187073},{"id":"https://openalex.org/C7817414","wikidata":"https://www.wikidata.org/wiki/Q1779504","display_name":"Energy management","level":3,"score":0.49787473678588867},{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.49339428544044495},{"id":"https://openalex.org/C73916439","wikidata":"https://www.wikidata.org/wiki/Q837718","display_name":"Energy storage","level":3,"score":0.4832649827003479},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.472893625497818},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.4479474723339081},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.41252854466438293},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.39418503642082214},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.36023077368736267},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.2217543125152588},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.19350489974021912},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18629854917526245},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.10359415411949158},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/pscc.2016.7540954","is_oa":false,"landing_page_url":"https://doi.org/10.1109/pscc.2016.7540954","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2016 Power Systems Computation Conference (PSCC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.7699999809265137,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":13,"referenced_works":["https://openalex.org/W1977419690","https://openalex.org/W2008426812","https://openalex.org/W2036778492","https://openalex.org/W2069028605","https://openalex.org/W2075141080","https://openalex.org/W2080637564","https://openalex.org/W2093075482","https://openalex.org/W2126869380","https://openalex.org/W2137152139","https://openalex.org/W2143298176","https://openalex.org/W2525707554","https://openalex.org/W3099654264","https://openalex.org/W6785545032"],"related_works":["https://openalex.org/W2333017163","https://openalex.org/W2034122571","https://openalex.org/W2347673489","https://openalex.org/W2964937504","https://openalex.org/W2122133230","https://openalex.org/W1903975","https://openalex.org/W2754808369","https://openalex.org/W1962574730","https://openalex.org/W2169268775","https://openalex.org/W3013373080"],"abstract_inverted_index":{"This":[0],"work":[1],"considers":[2],"energy":[3,20,77],"management":[4],"in":[5,93],"a":[6,62],"grid-connected":[7],"microgrid":[8],"which":[9,109],"consists":[10],"of":[11,52,58,72,89,119],"multiple":[12],"conventional":[13],"generators":[14,17],"(CGs),":[15],"renewable":[16,98,133],"(RGs)":[18],"and":[19,46,65,76,97,100,113,132],"storage":[21],"systems":[22],"(ESSs).":[23],"A":[24],"two-stage":[25],"optimization":[26,53],"approach":[27],"is":[28,123],"presented":[29],"to":[30,44],"schedule":[31],"the":[32,38,59,66,73,87,94,120],"power":[33],"generation,":[34,99],"aimed":[35],"at":[36],"minimizing":[37],"long-term":[39,114],"average":[40],"operating":[41],"cost":[42],"subject":[43],"operational":[45],"service":[47],"constraints.":[48],"The":[49,83,117],"first":[50],"stage":[51,68],"determines":[54],"hourly":[55],"unit":[56],"commitment":[57],"CGs":[60],"via":[61,79],"day-ahead":[63],"scheduling,":[64],"second":[67],"performs":[69],"economic":[70],"dispatch":[71],"CGs,":[74],"ESSs":[75],"trading":[78],"an":[80,102],"hour-ahead":[81],"scheduling.":[82],"combined":[84],"solution":[85,104],"meets":[86,110],"need":[88],"handling":[90],"large":[91],"uncertainties":[92],"load":[95,130],"demand":[96,131],"provides":[101],"efficient":[103],"under":[105],"limited":[106],"computational":[107],"resource":[108],"both":[111],"short-term":[112],"quality-of-service":[115],"requirements.":[116],"performance":[118],"proposed":[121],"strategy":[122],"evaluated":[124],"by":[125],"simulations":[126],"based":[127],"on":[128],"real":[129],"generation":[134],"data.":[135]},"counts_by_year":[{"year":2024,"cited_by_count":1},{"year":2023,"cited_by_count":1},{"year":2021,"cited_by_count":2},{"year":2019,"cited_by_count":1},{"year":2018,"cited_by_count":1},{"year":2016,"cited_by_count":1}],"updated_date":"2026-06-11T09:08:48.828518","created_date":"2025-10-10T00:00:00"}
