{"id":"https://openalex.org/W4391216948","doi":"https://doi.org/10.1109/ispec58282.2023.10403104","title":"Economic Analysis of High Penetration of Renewable Energy under Market Environment","display_name":"Economic Analysis of High Penetration of Renewable Energy under Market Environment","publication_year":2023,"publication_date":"2023-11-28","ids":{"openalex":"https://openalex.org/W4391216948","doi":"https://doi.org/10.1109/ispec58282.2023.10403104"},"language":"en","primary_location":{"id":"doi:10.1109/ispec58282.2023.10403104","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10403104","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5049399323","display_name":"Jichao Ye","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Jichao Ye","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5076555646","display_name":"Hanbing Zhang","orcid":"https://orcid.org/0000-0001-7758-3054"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Hanbing Zhang","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5101943065","display_name":"Hui Huang","orcid":"https://orcid.org/0000-0002-6279-3152"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Hui Huang","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5088965958","display_name":"Xinwei Hu","orcid":"https://orcid.org/0000-0003-1365-5738"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xinwei Hu","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5004031004","display_name":"Xinhua Wu","orcid":"https://orcid.org/0000-0003-4625-9635"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xinhua Wu","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100378213","display_name":"Yonghai Xu","orcid":"https://orcid.org/0000-0002-5619-8920"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Yonghai Xu","raw_affiliation_strings":["State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050"],"affiliations":[{"raw_affiliation_string":"State Grid Zhejiang Lishui Electric Power Company, Ltd.,Lishui,China,323050","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5100611642","display_name":"Chao Yang","orcid":"https://orcid.org/0000-0002-5328-0355"},"institutions":[{"id":"https://openalex.org/I4210127555","display_name":"China Guodian Corporation (China)","ror":"https://ror.org/02zrmae98","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210127555"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Chao Yang","raw_affiliation_strings":["Hangzhou Guodian Power Technology Development Company, Ltd.,Hangzhou,China,310012"],"affiliations":[{"raw_affiliation_string":"Hangzhou Guodian Power Technology Development Company, Ltd.,Hangzhou,China,310012","institution_ids":["https://openalex.org/I4210127555"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":7,"corresponding_author_ids":["https://openalex.org/A5049399323"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.1845484,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"47","issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9983000159263611,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9983000159263611,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9972000122070312,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9958000183105469,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.877818763256073},{"id":"https://openalex.org/keywords/economic-dispatch","display_name":"Economic dispatch","score":0.7632650136947632},{"id":"https://openalex.org/keywords/market-clearing","display_name":"Market clearing","score":0.5254092216491699},{"id":"https://openalex.org/keywords/market-penetration","display_name":"Market penetration","score":0.49458977580070496},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.4646527171134949},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.4394933879375458},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.4256255328655243},{"id":"https://openalex.org/keywords/function","display_name":"Function (biology)","score":0.42404162883758545},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.25278156995773315},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.2007673978805542},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18897968530654907},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.1386922001838684},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.13845416903495789}],"concepts":[{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.877818763256073},{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.7632650136947632},{"id":"https://openalex.org/C14981831","wikidata":"https://www.wikidata.org/wiki/Q1713661","display_name":"Market clearing","level":2,"score":0.5254092216491699},{"id":"https://openalex.org/C2777648813","wikidata":"https://www.wikidata.org/wiki/Q2508647","display_name":"Market penetration","level":2,"score":0.49458977580070496},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.4646527171134949},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4394933879375458},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4256255328655243},{"id":"https://openalex.org/C14036430","wikidata":"https://www.wikidata.org/wiki/Q3736076","display_name":"Function (biology)","level":2,"score":0.42404162883758545},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.25278156995773315},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.2007673978805542},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18897968530654907},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.1386922001838684},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.13845416903495789},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C78458016","wikidata":"https://www.wikidata.org/wiki/Q840400","display_name":"Evolutionary biology","level":1,"score":0.0},{"id":"https://openalex.org/C86803240","wikidata":"https://www.wikidata.org/wiki/Q420","display_name":"Biology","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ispec58282.2023.10403104","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10403104","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","score":0.7300000190734863,"display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W2558608691","https://openalex.org/W2594396999","https://openalex.org/W2803593768","https://openalex.org/W2807422770","https://openalex.org/W2895992043","https://openalex.org/W2911347525","https://openalex.org/W2950827576","https://openalex.org/W2953936648","https://openalex.org/W2960541823","https://openalex.org/W3049476145","https://openalex.org/W4242608959"],"related_works":["https://openalex.org/W1527081771","https://openalex.org/W3010864523","https://openalex.org/W2951731403","https://openalex.org/W2031918653","https://openalex.org/W292509278","https://openalex.org/W3095929388","https://openalex.org/W1528141314","https://openalex.org/W2008723230","https://openalex.org/W1491466608","https://openalex.org/W2151077863"],"abstract_inverted_index":{"The":[0],"proportion":[1,23],"of":[2,21,24,50,62,82,110,121,133],"renewable":[3,25,63,83,126],"energy":[4,16,26,64,84,127],"is":[5,65,97],"gradually":[6],"increasing":[7],"with":[8],"the":[9,15,19,31,48,54,59,69,79,92,102,107,111,119,131,134],"requirement":[10],"for":[11,125],"carbon":[12,103],"reduction":[13],"in":[14],"sector.":[17],"In":[18,72],"situation":[20],"high":[22,66],"integrated":[27],"into":[28],"power":[29,38],"systems,":[30],"traditional":[32,93],"market":[33,112],"mechanism":[34],"dominated":[35],"by":[36,53],"thermal":[37],"units":[39,85],"may":[40],"no":[41],"longer":[42],"be":[43],"suitable.":[44],"This":[45],"paper":[46,75,117],"simulates":[47,118],"results":[49],"LMPs":[51],"calculated":[52],"economic":[55,94,137],"dispatch":[56,95,138],"model":[57,96],"when":[58],"installed":[60],"capacity":[61],"and":[67],"analyzes":[68],"unreasonable":[70],"results.":[71],"addition,":[73],"this":[74,116],"proposes":[76],"to":[77,86,100,106,129],"modify":[78],"cost":[80,105],"function":[81,109],"linear":[87],"function.":[88],"Based":[89],"on":[90],"it,":[91],"thereafter":[98],"modified":[99],"attach":[101],"emission":[104],"objective":[108],"clearing":[113],"model.":[114,139],"Finally,":[115],"problem":[120],"optimal":[122],"location":[123],"selection":[124],"installations":[128],"demonstrate":[130],"effectiveness":[132],"proposed":[135],"updated":[136]},"counts_by_year":[],"updated_date":"2025-12-25T23:11:45.687758","created_date":"2025-10-10T00:00:00"}
