{"id":"https://openalex.org/W4391216636","doi":"https://doi.org/10.1109/ispec58282.2023.10403013","title":"Optimization Method for Medium and Long Term Electricity Market Trading of Clean Energy Power Plants","display_name":"Optimization Method for Medium and Long Term Electricity Market Trading of Clean Energy Power Plants","publication_year":2023,"publication_date":"2023-11-28","ids":{"openalex":"https://openalex.org/W4391216636","doi":"https://doi.org/10.1109/ispec58282.2023.10403013"},"language":"en","primary_location":{"id":"doi:10.1109/ispec58282.2023.10403013","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10403013","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5101102578","display_name":"Mengfei Xie","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Mengfei Xie","raw_affiliation_strings":["Kunming Power Exchange Center Company Limited,Kunming,China,650011"],"affiliations":[{"raw_affiliation_string":"Kunming Power Exchange Center Company Limited,Kunming,China,650011","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5050468192","display_name":"Shuangquan Liu","orcid":"https://orcid.org/0000-0002-2276-367X"},"institutions":[{"id":"https://openalex.org/I4210088511","display_name":"Inner Mongolia Electric Power (China)","ror":"https://ror.org/0041szh84","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210088511"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Shuangquan Liu","raw_affiliation_strings":["Electric Power Dispatch and Control Center,Kunming,China,650011"],"affiliations":[{"raw_affiliation_string":"Electric Power Dispatch and Control Center,Kunming,China,650011","institution_ids":["https://openalex.org/I4210088511"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5015430266","display_name":"Huaxiang Cai","orcid":"https://orcid.org/0000-0003-0966-2150"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Huaxiang Cai","raw_affiliation_strings":["Kunming Power Exchange Center Company Limited,Kunming,China,650011"],"affiliations":[{"raw_affiliation_string":"Kunming Power Exchange Center Company Limited,Kunming,China,650011","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5052389450","display_name":"Yugong Jia","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Yugong Jia","raw_affiliation_strings":["Kunming Power Exchange Center Company Limited,Kunming,China,650011"],"affiliations":[{"raw_affiliation_string":"Kunming Power Exchange Center Company Limited,Kunming,China,650011","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5081883041","display_name":"Bin Liu","orcid":"https://orcid.org/0000-0003-2291-7592"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Bin Liu","raw_affiliation_strings":["Kunming Power Exchange Center Company Limited,Kunming,China,650011"],"affiliations":[{"raw_affiliation_string":"Kunming Power Exchange Center Company Limited,Kunming,China,650011","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":5,"corresponding_author_ids":["https://openalex.org/A5101102578"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.134,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.48405054,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":94},"biblio":{"volume":"44","issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9966999888420105,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9952999949455261,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/stand-alone-power-system","display_name":"Stand-alone power system","score":0.6924852132797241},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.6753929853439331},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.6369809508323669},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.6300264596939087},{"id":"https://openalex.org/keywords/power-station","display_name":"Power station","score":0.5401349067687988},{"id":"https://openalex.org/keywords/electricity-retailing","display_name":"Electricity retailing","score":0.5097128748893738},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.5039119124412537},{"id":"https://openalex.org/keywords/base-load-power-plant","display_name":"Base load power plant","score":0.43718889355659485},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.3764055371284485},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.33397528529167175},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.3071850836277008},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.2609982490539551},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.19553977251052856},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.1713799238204956},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.16703519225120544}],"concepts":[{"id":"https://openalex.org/C104708988","wikidata":"https://www.wikidata.org/wiki/Q1664450","display_name":"Stand-alone power system","level":4,"score":0.6924852132797241},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.6753929853439331},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.6369809508323669},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.6300264596939087},{"id":"https://openalex.org/C4311470","wikidata":"https://www.wikidata.org/wiki/Q159719","display_name":"Power station","level":2,"score":0.5401349067687988},{"id":"https://openalex.org/C57101690","wikidata":"https://www.wikidata.org/wiki/Q2356921","display_name":"Electricity retailing","level":4,"score":0.5097128748893738},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.5039119124412537},{"id":"https://openalex.org/C123153844","wikidata":"https://www.wikidata.org/wiki/Q360897","display_name":"Base load power plant","level":4,"score":0.43718889355659485},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.3764055371284485},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.33397528529167175},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3071850836277008},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.2609982490539551},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.19553977251052856},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.1713799238204956},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.16703519225120544},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ispec58282.2023.10403013","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10403013","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","score":0.5,"id":"https://metadata.un.org/sdg/9"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":1,"referenced_works":["https://openalex.org/W4205745696"],"related_works":["https://openalex.org/W4385343797","https://openalex.org/W2518703924","https://openalex.org/W2383435403","https://openalex.org/W2378481139","https://openalex.org/W2524312265","https://openalex.org/W2348317328","https://openalex.org/W2998251152","https://openalex.org/W2316944785","https://openalex.org/W2623853989","https://openalex.org/W2325807929"],"abstract_inverted_index":{"With":[0],"the":[1,5,17,33,38,42,56,82,110,114,127,145,155,159,166,179,183,189,194,199,203],"gradual":[2],"promotion":[3],"of":[4,40,44,58,84,119,138,147,158,165,193],"electricity":[6,18,34,69,88,93,140,150,163],"market":[7,19,35,205],"reform,":[8],"clean":[9,25,59,85,102],"energy":[10,26,60,86,103],"power":[11,27,47,61,90,96,104,148,167,174,190,195,204],"plants":[12,28,62,105,121],"have":[13],"begun":[14],"to":[15],"enter":[16],"in":[20,32,64,202],"an":[21,51,135,177],"all-round":[22],"way.":[23],"How":[24],"can":[29,186],"better":[30],"participate":[31],"transaction":[36],"on":[37],"basis":[39],"considering":[41],"uncertainty":[43],"their":[45],"own":[46],"generation":[48,97,191],"has":[49],"become":[50],"important":[52],"issue.":[53],"Aiming":[54],"at":[55],"problem":[57],"participating":[63],"medium":[65],"and":[66,95,125,152,197],"long":[67],"term":[68],"trading,":[70],"this":[71],"paper":[72],"first":[73],"establishes":[74],"a":[75,173],"multi-objective":[76],"three-level":[77],"optimization":[78,111,136],"model,":[79],"which":[80],"integrates":[81],"factors":[83],"surplus":[87],"consumption,":[89],"grid":[91],"security,":[92],"balance,":[94],"efficiency.":[98],"The":[99],"model":[100],"takes":[101],"without":[106],"regulation":[107,123],"capacity":[108],"as":[109,176],"boundary,":[112],"optimizes":[113],"monthly":[115,161],"control":[116,132],"water":[117,130],"level":[118,131],"hydropower":[120],"with":[122],"capacity,":[124],"obtains":[126],"long-term":[128],"scale":[129],"strategy.":[133],"Secondly,":[134],"method":[137,185],"trading":[139,162],"quantity":[141,164],"is":[142,169],"proposed.":[143],"Considering":[144],"randomness":[146],"generation,":[149],"price":[151],"default":[153],"price,":[154],"estimated":[156],"value":[157],"optimal":[160],"plant":[168,175,196],"obtained.":[170],"Finally,":[171],"taking":[172],"example,":[178],"calculation":[180],"shows":[181],"that":[182],"proposed":[184],"effectively":[187],"improve":[188],"efficiency":[192],"realize":[198],"maximum":[200],"benefit":[201],"environment.":[206]},"counts_by_year":[{"year":2024,"cited_by_count":1}],"updated_date":"2025-12-23T23:11:35.936235","created_date":"2025-10-10T00:00:00"}
