{"id":"https://openalex.org/W4391216442","doi":"https://doi.org/10.1109/ispec58282.2023.10402819","title":"Reliability Assessment of Road-Electricity Coupled Distribution Network Considering Electric Vehicle Demand Response","display_name":"Reliability Assessment of Road-Electricity Coupled Distribution Network Considering Electric Vehicle Demand Response","publication_year":2023,"publication_date":"2023-11-28","ids":{"openalex":"https://openalex.org/W4391216442","doi":"https://doi.org/10.1109/ispec58282.2023.10402819"},"language":"en","primary_location":{"id":"doi:10.1109/ispec58282.2023.10402819","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10402819","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5101296453","display_name":"Yawen Zheng","orcid":null},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Yawen Zheng","raw_affiliation_strings":["Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5002120153","display_name":"Hao Bai","orcid":"https://orcid.org/0000-0001-8529-9432"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Hao Bai","raw_affiliation_strings":["Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100720125","display_name":"Xiaofeng Dai","orcid":"https://orcid.org/0000-0002-0006-4042"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Xiaofeng Dai","raw_affiliation_strings":["Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100683583","display_name":"Wei Li","orcid":"https://orcid.org/0000-0002-7772-5697"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Wei Li","raw_affiliation_strings":["Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5103091566","display_name":"Rui Tong","orcid":"https://orcid.org/0000-0001-7974-4341"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Rui Tong","raw_affiliation_strings":["Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd.,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd., Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5034269057","display_name":"Min Xu","orcid":"https://orcid.org/0000-0001-6238-6058"},"institutions":[{"id":"https://openalex.org/I74872605","display_name":"China Southern Power Grid (China)","ror":"https://ror.org/03hkh9419","country_code":"CN","type":"company","lineage":["https://openalex.org/I74872605"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Min Xu","raw_affiliation_strings":["Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China"],"affiliations":[{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid,Guangdong,Guangzhou,China","institution_ids":["https://openalex.org/I74872605"]},{"raw_affiliation_string":"Electric Power Research Institute of China Southern Power Grid, Guangdong, Guangzhou, China","institution_ids":["https://openalex.org/I74872605"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":6,"corresponding_author_ids":["https://openalex.org/A5101296453"],"corresponding_institution_ids":["https://openalex.org/I74872605"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.18407594,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"6"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10768","display_name":"Electric Vehicles and Infrastructure","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10768","display_name":"Electric Vehicles and Infrastructure","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10663","display_name":"Advanced Battery Technologies Research","score":0.9991000294685364,"subfield":{"id":"https://openalex.org/subfields/2203","display_name":"Automotive Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9948999881744385,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.7036126852035522},{"id":"https://openalex.org/keywords/reliability","display_name":"Reliability (semiconductor)","score":0.6682769060134888},{"id":"https://openalex.org/keywords/electric-vehicle","display_name":"Electric vehicle","score":0.5682772994041443},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.5462777018547058},{"id":"https://openalex.org/keywords/automotive-engineering","display_name":"Automotive engineering","score":0.5321656465530396},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.5167742967605591},{"id":"https://openalex.org/keywords/voltage","display_name":"Voltage","score":0.4845089316368103},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.451379656791687},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.4398561418056488},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.38307321071624756},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.3778861165046692},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.26839500665664673}],"concepts":[{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.7036126852035522},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.6682769060134888},{"id":"https://openalex.org/C2776422217","wikidata":"https://www.wikidata.org/wiki/Q13629441","display_name":"Electric vehicle","level":3,"score":0.5682772994041443},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.5462777018547058},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.5321656465530396},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.5167742967605591},{"id":"https://openalex.org/C165801399","wikidata":"https://www.wikidata.org/wiki/Q25428","display_name":"Voltage","level":2,"score":0.4845089316368103},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.451379656791687},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.4398561418056488},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.38307321071624756},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3778861165046692},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.26839500665664673},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ispec58282.2023.10402819","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ispec58282.2023.10402819","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE Sustainable Power and Energy Conference (iSPEC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.49000000953674316,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[{"id":"https://openalex.org/F4320323192","display_name":"China Southern Power Grid","ror":"https://ror.org/03hkh9419"}],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":18,"referenced_works":["https://openalex.org/W1523739524","https://openalex.org/W2084601546","https://openalex.org/W2342981086","https://openalex.org/W2907076847","https://openalex.org/W2945327210","https://openalex.org/W2982320587","https://openalex.org/W3036640459","https://openalex.org/W3119834975","https://openalex.org/W3130190330","https://openalex.org/W3176891247","https://openalex.org/W4213427370","https://openalex.org/W4285210089","https://openalex.org/W4312082878","https://openalex.org/W4376457676","https://openalex.org/W4379983507","https://openalex.org/W4383098017","https://openalex.org/W4383748288","https://openalex.org/W4411356117"],"related_works":["https://openalex.org/W2555175041","https://openalex.org/W2032085210","https://openalex.org/W2389561653","https://openalex.org/W2052188148","https://openalex.org/W4239205706","https://openalex.org/W4239297229","https://openalex.org/W3003695187","https://openalex.org/W3166575991","https://openalex.org/W4205710825","https://openalex.org/W4210490979"],"abstract_inverted_index":{"With":[0],"the":[1,7,16,19,46,55,61,85,101,122,137,157,165,168],"increasing":[2],"number":[3],"of":[4,9,18,30,49,60,91,103,126,139,159,167],"electric":[5,35,50,92,160],"vehicles,":[6],"characteristics":[8,59],"their":[10],"mobile":[11],"load":[12],"have":[13],"significantly":[14],"impacted":[15],"operation":[17],"distribution":[20,32,140,153],"network.":[21,64,170],"For":[22],"this":[23],"issue,":[24],"a":[25,66,108,149],"novel":[26],"reliability":[27,138,166],"assessment":[28],"method":[29,134],"power":[31,80],"network":[33,154],"considering":[34,100],"vehicle":[36,51,161],"demand":[37,67,162],"response":[38,68,163],"is":[39,71,142],"rroposed.":[40],"This":[41],"paper":[42],"begins":[43],"by":[44],"describing":[45],"spatiotemporal":[47],"attributes":[48],"loads":[52,106],"based":[53,83],"on":[54,84,148,164],"topology":[56],"and":[57,79,88,116,124],"driving":[58],"traffic":[62],"road":[63],"Subsequently,":[65],"scheduling":[69],"strategy":[70],"constructed,":[72],"taking":[73,117],"into":[74,111,118],"account":[75,119],"user":[76],"charging":[77,86,97,105],"costs":[78],"system":[81],"losses,":[82],"time":[87],"remaining":[89],"electricity":[90],"vehicles":[93],"when":[94],"connected":[95],"to":[96,155],"stations.":[98],"Finally,":[99],"conversion":[102],"post-demand-response":[104],"from":[107],"typical":[109],"day":[110],"an":[112,130],"equivalent":[113],"annual":[114],"load,":[115],"scenarios":[120],"involving":[121],"misoperation":[123],"refusal":[125],"low-voltage":[127,152],"circuit":[128],"breakers,":[129],"improved":[131],"minimal":[132],"path":[133],"for":[135],"assessing":[136],"networks":[141],"proposed.":[143],"Case":[144],"studies":[145],"are":[146],"conducted":[147],"specific":[150],"practical":[151],"analyze":[156],"impact":[158],"said":[169]},"counts_by_year":[],"updated_date":"2025-12-25T23:11:45.687758","created_date":"2025-10-10T00:00:00"}
