{"id":"https://openalex.org/W4390402071","doi":"https://doi.org/10.1109/isgtasia54891.2023.10372690","title":"Effect of Considering Network Constraints in Energy or Reserve Market on Procurement Cost of Market Players","display_name":"Effect of Considering Network Constraints in Energy or Reserve Market on Procurement Cost of Market Players","publication_year":2023,"publication_date":"2023-11-21","ids":{"openalex":"https://openalex.org/W4390402071","doi":"https://doi.org/10.1109/isgtasia54891.2023.10372690"},"language":"en","primary_location":{"id":"doi:10.1109/isgtasia54891.2023.10372690","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgtasia54891.2023.10372690","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5016019785","display_name":"Keita Kato","orcid":"https://orcid.org/0000-0002-2901-2502"},"institutions":[{"id":"https://openalex.org/I201537933","display_name":"Tohoku University","ror":"https://ror.org/01dq60k83","country_code":"JP","type":"education","lineage":["https://openalex.org/I201537933"]}],"countries":["JP"],"is_corresponding":true,"raw_author_name":"Keita Kato","raw_affiliation_strings":["Tohoku University,Department of Electrical Engineering,Sendai,Japan","Department of Electrical Engineering, Tohoku University, Sendai, Japan"],"affiliations":[{"raw_affiliation_string":"Tohoku University,Department of Electrical Engineering,Sendai,Japan","institution_ids":["https://openalex.org/I201537933"]},{"raw_affiliation_string":"Department of Electrical Engineering, Tohoku University, Sendai, Japan","institution_ids":["https://openalex.org/I201537933"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5112295925","display_name":"Hiroumi Saitoh","orcid":null},"institutions":[{"id":"https://openalex.org/I201537933","display_name":"Tohoku University","ror":"https://ror.org/01dq60k83","country_code":"JP","type":"education","lineage":["https://openalex.org/I201537933"]}],"countries":["JP"],"is_corresponding":false,"raw_author_name":"Hiroumi Saitoh","raw_affiliation_strings":["Tohoku University,Department of Electrical Engineering,Sendai,Japan","Department of Electrical Engineering, Tohoku University, Sendai, Japan"],"affiliations":[{"raw_affiliation_string":"Tohoku University,Department of Electrical Engineering,Sendai,Japan","institution_ids":["https://openalex.org/I201537933"]},{"raw_affiliation_string":"Department of Electrical Engineering, Tohoku University, Sendai, Japan","institution_ids":["https://openalex.org/I201537933"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5016019785"],"corresponding_institution_ids":["https://openalex.org/I201537933"],"apc_list":null,"apc_paid":null,"fwci":0.3912,"has_fulltext":false,"cited_by_count":3,"citation_normalized_percentile":{"value":0.61810378,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":94,"max":99},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9987999796867371,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.989300012588501,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/procurement","display_name":"Procurement","score":0.7733287811279297},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.6642734408378601},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.6361339092254639},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.5881242156028748},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.5153102874755859},{"id":"https://openalex.org/keywords/reserve-requirement","display_name":"Reserve requirement","score":0.5035693049430847},{"id":"https://openalex.org/keywords/balance","display_name":"Balance (ability)","score":0.48765337467193604},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.4843624532222748},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.4749608039855957},{"id":"https://openalex.org/keywords/energy-market","display_name":"Energy market","score":0.45288562774658203},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.4504738748073578},{"id":"https://openalex.org/keywords/industrial-organization","display_name":"Industrial organization","score":0.4489150643348694},{"id":"https://openalex.org/keywords/supply-and-demand","display_name":"Supply and demand","score":0.4458233416080475},{"id":"https://openalex.org/keywords/energy-supply","display_name":"Energy supply","score":0.4107916057109833},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.3862605392932892},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.3349834084510803},{"id":"https://openalex.org/keywords/risk-analysis","display_name":"Risk analysis (engineering)","score":0.3297725021839142},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.24583902955055237},{"id":"https://openalex.org/keywords/energy","display_name":"Energy (signal processing)","score":0.21802112460136414},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.1746038794517517},{"id":"https://openalex.org/keywords/monetary-economics","display_name":"Monetary economics","score":0.10722184181213379},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.09250140190124512},{"id":"https://openalex.org/keywords/central-bank","display_name":"Central bank","score":0.08880674839019775}],"concepts":[{"id":"https://openalex.org/C201650216","wikidata":"https://www.wikidata.org/wiki/Q829492","display_name":"Procurement","level":2,"score":0.7733287811279297},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.6642734408378601},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.6361339092254639},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.5881242156028748},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.5153102874755859},{"id":"https://openalex.org/C150149615","wikidata":"https://www.wikidata.org/wiki/Q1058762","display_name":"Reserve requirement","level":4,"score":0.5035693049430847},{"id":"https://openalex.org/C168031717","wikidata":"https://www.wikidata.org/wiki/Q1530280","display_name":"Balance (ability)","level":2,"score":0.48765337467193604},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4843624532222748},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.4749608039855957},{"id":"https://openalex.org/C2776849302","wikidata":"https://www.wikidata.org/wiki/Q1239166","display_name":"Energy market","level":3,"score":0.45288562774658203},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.4504738748073578},{"id":"https://openalex.org/C40700","wikidata":"https://www.wikidata.org/wiki/Q1411783","display_name":"Industrial organization","level":1,"score":0.4489150643348694},{"id":"https://openalex.org/C120330832","wikidata":"https://www.wikidata.org/wiki/Q166656","display_name":"Supply and demand","level":2,"score":0.4458233416080475},{"id":"https://openalex.org/C2776190866","wikidata":"https://www.wikidata.org/wiki/Q1341477","display_name":"Energy supply","level":3,"score":0.4107916057109833},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.3862605392932892},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3349834084510803},{"id":"https://openalex.org/C112930515","wikidata":"https://www.wikidata.org/wiki/Q4389547","display_name":"Risk analysis (engineering)","level":1,"score":0.3297725021839142},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.24583902955055237},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.21802112460136414},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.1746038794517517},{"id":"https://openalex.org/C556758197","wikidata":"https://www.wikidata.org/wiki/Q580018","display_name":"Monetary economics","level":1,"score":0.10722184181213379},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.09250140190124512},{"id":"https://openalex.org/C2992735868","wikidata":"https://www.wikidata.org/wiki/Q66344","display_name":"Central bank","level":3,"score":0.08880674839019775},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0},{"id":"https://openalex.org/C71924100","wikidata":"https://www.wikidata.org/wiki/Q11190","display_name":"Medicine","level":0,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C126285488","wikidata":"https://www.wikidata.org/wiki/Q178476","display_name":"Monetary policy","level":2,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C99508421","wikidata":"https://www.wikidata.org/wiki/Q2678675","display_name":"Physical medicine and rehabilitation","level":1,"score":0.0},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgtasia54891.2023.10372690","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgtasia54891.2023.10372690","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","score":0.8700000047683716,"display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W1504334853","https://openalex.org/W2141975707","https://openalex.org/W2955382644"],"related_works":["https://openalex.org/W2383417413","https://openalex.org/W1993360808","https://openalex.org/W2371783788","https://openalex.org/W3211064698","https://openalex.org/W2558002628","https://openalex.org/W2356662412","https://openalex.org/W2147476353","https://openalex.org/W2350644859","https://openalex.org/W2894208143","https://openalex.org/W2326317874"],"abstract_inverted_index":{"With":[0],"the":[1,9,14,26,67,86,93,99,113,117],"increasing":[2],"penetration":[3],"of":[4,39,88,102],"renewable":[5],"energy":[6,94],"sources,":[7],"matching":[8],"instantaneous":[10],"supply-demand":[11],"balance":[12],"in":[13,92],"power":[15],"system":[16,27],"has":[17],"become":[18],"a":[19,36],"challenging":[20],"task.":[21],"To":[22],"maintain":[23],"this":[24,82],"balance,":[25],"operator":[28],"is":[29,71],"responsible":[30],"for":[31,120],"procuring":[32],"reserve,":[33],"making":[34],"it":[35,70],"critical":[37],"aspect":[38],"grid":[40,75],"operation.":[41],"Market":[42],"mechanisms":[43,63],"have":[44,56],"been":[45],"adopted":[46],"as":[47],"effective":[48],"means":[49],"to":[50,73],"procure":[51],"reserve.":[52],"However,":[53],"previous":[54],"studies":[55],"indicated":[57],"that":[58,108],"relying":[59],"solely":[60],"on":[61,98],"market":[62,103,115,121],"could":[64],"potentially":[65],"destabilize":[66],"grid.":[68],"Therefore,":[69],"essential":[72],"incorporate":[74],"constraints":[76,91,111],"effectively":[77],"into":[78,112],"electricity":[79],"markets.":[80],"In":[81],"paper,":[83],"we":[84],"analyze":[85],"effect":[87],"considering":[89],"network":[90,110],"or":[95],"reserve":[96,114],"markets":[97],"procurement":[100,118],"costs":[101,119],"players.":[104],"The":[105],"results":[106],"indicate":[107],"introducing":[109],"increases":[116],"participants":[122],"but":[123],"enables":[124],"reliable":[125],"supply":[126],"and":[127],"demand":[128],"operations.":[129]},"counts_by_year":[{"year":2026,"cited_by_count":1},{"year":2024,"cited_by_count":2}],"updated_date":"2026-04-01T17:29:45.350535","created_date":"2025-10-10T00:00:00"}
