{"id":"https://openalex.org/W4315694895","doi":"https://doi.org/10.1109/isgtasia54193.2022.10003578","title":"Joint Optimization of Battery Energy Storage and Gas Turbine for Ancillary Service Provision","display_name":"Joint Optimization of Battery Energy Storage and Gas Turbine for Ancillary Service Provision","publication_year":2022,"publication_date":"2022-11-01","ids":{"openalex":"https://openalex.org/W4315694895","doi":"https://doi.org/10.1109/isgtasia54193.2022.10003578"},"language":"en","primary_location":{"id":"doi:10.1109/isgtasia54193.2022.10003578","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgtasia54193.2022.10003578","pdf_url":null,"source":{"id":"https://openalex.org/S4363605779","display_name":"2022 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5021723695","display_name":"Rohit Chandra","orcid":"https://orcid.org/0000-0002-7101-8609"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Rohit Chandra","raw_affiliation_strings":["Envision Digital Pte Ltd.,Singapore","Envision Digital Pte Ltd., Singapore"],"affiliations":[{"raw_affiliation_string":"Envision Digital Pte Ltd.,Singapore","institution_ids":[]},{"raw_affiliation_string":"Envision Digital Pte Ltd., Singapore","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5000834976","display_name":"Katayoun Rahbar","orcid":"https://orcid.org/0000-0002-1643-911X"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Katayoun Rahbar","raw_affiliation_strings":["Envision Digital Pte Ltd.,Singapore","Envision Digital Pte Ltd., Singapore"],"affiliations":[{"raw_affiliation_string":"Envision Digital Pte Ltd.,Singapore","institution_ids":[]},{"raw_affiliation_string":"Envision Digital Pte Ltd., Singapore","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5112612859","display_name":"Peng Peng","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Peng Peng","raw_affiliation_strings":["Envision Digital Pte Ltd.,Singapore","Envision Digital Pte Ltd., Singapore"],"affiliations":[{"raw_affiliation_string":"Envision Digital Pte Ltd.,Singapore","institution_ids":[]},{"raw_affiliation_string":"Envision Digital Pte Ltd., Singapore","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5021723695"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.3222,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.49503848,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":94},"biblio":{"volume":null,"issue":null,"first_page":"379","last_page":"383"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9997000098228455,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9997000098228455,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9993000030517578,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10768","display_name":"Electric Vehicles and Infrastructure","score":0.9940000176429749,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/arbitrage","display_name":"Arbitrage","score":0.6276795864105225},{"id":"https://openalex.org/keywords/revenue","display_name":"Revenue","score":0.5808968544006348},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.5692377090454102},{"id":"https://openalex.org/keywords/energy-storage","display_name":"Energy storage","score":0.5571317076683044},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.5431328415870667},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.5369387269020081},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.5148695707321167},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.5133303999900818},{"id":"https://openalex.org/keywords/profit","display_name":"Profit (economics)","score":0.5035595297813416},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.4553854465484619},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.4244665205478668},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.41021743416786194},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.4093787372112274},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.28864508867263794},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.24016636610031128},{"id":"https://openalex.org/keywords/finance","display_name":"Finance","score":0.228479266166687},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.19788143038749695},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.15682458877563477},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.13111895322799683}],"concepts":[{"id":"https://openalex.org/C160623529","wikidata":"https://www.wikidata.org/wiki/Q273088","display_name":"Arbitrage","level":2,"score":0.6276795864105225},{"id":"https://openalex.org/C195487862","wikidata":"https://www.wikidata.org/wiki/Q850210","display_name":"Revenue","level":2,"score":0.5808968544006348},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.5692377090454102},{"id":"https://openalex.org/C73916439","wikidata":"https://www.wikidata.org/wiki/Q837718","display_name":"Energy storage","level":3,"score":0.5571317076683044},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.5431328415870667},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.5369387269020081},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.5148695707321167},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.5133303999900818},{"id":"https://openalex.org/C181622380","wikidata":"https://www.wikidata.org/wiki/Q26911","display_name":"Profit (economics)","level":2,"score":0.5035595297813416},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.4553854465484619},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.4244665205478668},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.41021743416786194},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.4093787372112274},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.28864508867263794},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.24016636610031128},{"id":"https://openalex.org/C10138342","wikidata":"https://www.wikidata.org/wiki/Q43015","display_name":"Finance","level":1,"score":0.228479266166687},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.19788143038749695},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.15682458877563477},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.13111895322799683},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgtasia54193.2022.10003578","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgtasia54193.2022.10003578","pdf_url":null,"source":{"id":"https://openalex.org/S4363605779","display_name":"2022 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 IEEE PES Innovative Smart Grid Technologies - Asia (ISGT Asia)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","score":0.7799999713897705,"id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":6,"referenced_works":["https://openalex.org/W2044868077","https://openalex.org/W2075233444","https://openalex.org/W2687340363","https://openalex.org/W2781997466","https://openalex.org/W2805077308","https://openalex.org/W2918584125"],"related_works":["https://openalex.org/W2555175041","https://openalex.org/W2032085210","https://openalex.org/W4392752943","https://openalex.org/W2389561653","https://openalex.org/W2052188148","https://openalex.org/W4239205706","https://openalex.org/W4239297229","https://openalex.org/W3166575991","https://openalex.org/W3124616626","https://openalex.org/W3125573662"],"abstract_inverted_index":{"Ancillary":[0],"services":[1,66],"play":[2],"a":[3,72,93,142],"crucial":[4],"role":[5],"in":[6,89,99,136],"maintaining":[7],"the":[8,47,50,57,85,121],"reliability":[9],"of":[10,49,56,124],"electrical":[11],"power":[12],"grids":[13],"with":[14,29,74],"integrated":[15],"intermittent":[16],"renewable":[17],"energy":[18,31,36,62,105],"generation.":[19],"They":[20],"can":[21,128],"also":[22],"provide":[23],"additional":[24,132],"revenue":[25,133],"streams":[26],"for":[27,61,104,131],"systems":[28,38],"distributed":[30],"resources":[32],"(DERs),":[33],"e.g.,":[34],"battery":[35],"storage":[37],"(BESSs)":[39],"and":[40,53,59,64,76,78,108,126,141],"gas":[41],"turbines":[42],"(GTs).":[43],"This":[44],"paper":[45],"evaluates":[46],"benefits":[48],"joint":[51],"optimization":[52,81],"coordinated":[54],"control":[55],"BESS":[58,75,125],"GT":[60,77,127],"arbitrage":[63],"ancillary":[65],"provision.":[67],"Specifically,":[68],"we":[69,96],"mathematically":[70],"model":[71],"system":[73],"formulate":[79],"an":[80],"problem":[82],"to":[83],"maximize":[84],"profit":[86],"through":[87,134],"participation":[88,98,135],"various":[90],"markets.":[91],"As":[92],"case":[94],"study,":[95],"consider":[97],"Singapore's":[100,115],"wholesale":[101],"electricity":[102],"market":[103,117,140],"arbitrage,":[106],"regulation,":[107],"contingency":[109,147],"reserve.":[110],"Our":[111],"analysis":[112],"based":[113],"on":[114],"actual":[116],"prices":[118],"shows":[119],"that":[120],"complimentary":[122],"nature":[123],"be":[129],"leveraged":[130],"both":[137],"fast-response":[138],"regulation":[139],"relatively":[143],"slower-response":[144],"but":[145],"longer-term":[146],"reserve":[148],"market.":[149]},"counts_by_year":[{"year":2023,"cited_by_count":1}],"updated_date":"2025-12-23T23:11:35.936235","created_date":"2025-10-10T00:00:00"}
