{"id":"https://openalex.org/W4392389588","doi":"https://doi.org/10.1109/isgt59692.2024.10454215","title":"MicrogridUP: Prospecting High Value Microgrid Deployments Across Full Utility Systems With a Multi-Staged Optimization Approach","display_name":"MicrogridUP: Prospecting High Value Microgrid Deployments Across Full Utility Systems With a Multi-Staged Optimization Approach","publication_year":2024,"publication_date":"2024-02-19","ids":{"openalex":"https://openalex.org/W4392389588","doi":"https://doi.org/10.1109/isgt59692.2024.10454215"},"language":"en","primary_location":{"id":"doi:10.1109/isgt59692.2024.10454215","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgt59692.2024.10454215","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5054915919","display_name":"Austin Chang","orcid":"https://orcid.org/0000-0001-7343-6874"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Austin Chang","raw_affiliation_strings":["NRECA Research,Arlington,VA,USA","NRECA Research, Arlington, VA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"NRECA Research,Arlington,VA,USA","institution_ids":[]},{"raw_affiliation_string":"NRECA Research, Arlington, VA, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5094051847","display_name":"Thomas Jankovic","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Thomas Jankovic","raw_affiliation_strings":["NRECA Research,Arlington,VA,USA","NRECA Research, Arlington, VA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"NRECA Research,Arlington,VA,USA","institution_ids":[]},{"raw_affiliation_string":"NRECA Research, Arlington, VA, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5094051848","display_name":"Lauren Khair","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Lauren Khair","raw_affiliation_strings":["NRECA Research,Arlington,VA,USA","NRECA Research, Arlington, VA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"NRECA Research,Arlington,VA,USA","institution_ids":[]},{"raw_affiliation_string":"NRECA Research, Arlington, VA, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5000887834","display_name":"David Pinney","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"David Pinney","raw_affiliation_strings":["NRECA Research,Arlington,VA,USA","NRECA Research, Arlington, VA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"NRECA Research,Arlington,VA,USA","institution_ids":[]},{"raw_affiliation_string":"NRECA Research, Arlington, VA, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5045045549","display_name":"Matthew Stevenson","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Matthew Stevenson","raw_affiliation_strings":["NRECA Research,Arlington,VA,USA","NRECA Research, Arlington, VA, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"NRECA Research,Arlington,VA,USA","institution_ids":[]},{"raw_affiliation_string":"NRECA Research, Arlington, VA, USA","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5043083359","display_name":"Fathalla Eldali","orcid":"https://orcid.org/0000-0003-1400-9148"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Fathalla Eldali","raw_affiliation_strings":["North Carolina Electric Membership Corporation,Raleigh,NC,USA","North Carolina Electric Membership Corporation, Raleigh, NC, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"North Carolina Electric Membership Corporation,Raleigh,NC,USA","institution_ids":[]},{"raw_affiliation_string":"North Carolina Electric Membership Corporation, Raleigh, NC, USA","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.8877,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.60470474,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":94},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11007","display_name":"Hybrid Renewable Energy Systems","score":0.9945999979972839,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/microgrid","display_name":"Microgrid","score":0.8220121264457703},{"id":"https://openalex.org/keywords/prospecting","display_name":"Prospecting","score":0.7832156419754028},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5982021689414978},{"id":"https://openalex.org/keywords/geology","display_name":"Geology","score":0.28519678115844727},{"id":"https://openalex.org/keywords/mining-engineering","display_name":"Mining engineering","score":0.13020524382591248},{"id":"https://openalex.org/keywords/artificial-intelligence","display_name":"Artificial intelligence","score":0.08665671944618225}],"concepts":[{"id":"https://openalex.org/C2776784348","wikidata":"https://www.wikidata.org/wiki/Q5762595","display_name":"Microgrid","level":3,"score":0.8220121264457703},{"id":"https://openalex.org/C175181221","wikidata":"https://www.wikidata.org/wiki/Q1650350","display_name":"Prospecting","level":2,"score":0.7832156419754028},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5982021689414978},{"id":"https://openalex.org/C127313418","wikidata":"https://www.wikidata.org/wiki/Q1069","display_name":"Geology","level":0,"score":0.28519678115844727},{"id":"https://openalex.org/C16674752","wikidata":"https://www.wikidata.org/wiki/Q1370637","display_name":"Mining engineering","level":1,"score":0.13020524382591248},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.08665671944618225},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt59692.2024.10454215","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/isgt59692.2024.10454215","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[{"id":"https://openalex.org/F4320333589","display_name":"Environmental Security Technology Certification Program","ror":null}],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":10,"referenced_works":["https://openalex.org/W1829950752","https://openalex.org/W1991971024","https://openalex.org/W2163925008","https://openalex.org/W2775538088","https://openalex.org/W2889897272","https://openalex.org/W2897614285","https://openalex.org/W3216540311","https://openalex.org/W4214824730","https://openalex.org/W4296704965","https://openalex.org/W4319317579"],"related_works":["https://openalex.org/W4391375266","https://openalex.org/W2899084033","https://openalex.org/W2748952813","https://openalex.org/W1574359403","https://openalex.org/W2057975886","https://openalex.org/W4308700935","https://openalex.org/W4210780382","https://openalex.org/W2356033827","https://openalex.org/W2391138633","https://openalex.org/W2907234787"],"abstract_inverted_index":{"Facilities":[0],"with":[1,42,162],"large":[2],"critical":[3],"loads":[4],"(e.g.,":[5],"military":[6,104],"installations)":[7],"require":[8],"complex":[9],"microgrids":[10,74,102],"to":[11,88,123,146],"cost-effectively":[12],"meet":[13],"continuity":[14],"of":[15,101],"operations":[16],"and":[17,26,53,70,92,117,154,156],"resilience":[18],"requirements,":[19],"which":[20],"vary":[21],"based":[22],"on":[23,103],"the":[24,97,118,158,163],"installation":[25],"branch.":[27],"Existing":[28],"electric":[29],"grid":[30],"planning":[31,64,86,93,141,164],"tools":[32,65],"lack":[33],"integrated":[34],"methods":[35],"for":[36,75,127],"concurrently":[37],"modeling":[38],"on-site":[39],"generation":[40],"along":[41],"low":[43],"voltage":[44,48,55],"(i.e.,":[45,49,56],"buildings),":[46],"medium":[47],"distribution":[50],"system":[51],"primary),":[52],"high":[54],"transmission":[57],"systems)":[58],"loads.":[59],"This":[60],"shortcoming":[61],"in":[62,72],"existing":[63],"increases":[66],"time,":[67],"cost,":[68],"complexity,":[69],"uncertainty":[71],"designing":[73],"multi-building":[76],"sites.":[77],"The":[78,106],"MicrogridUP":[79,140],"project":[80,107],"has":[81,120,143],"created":[82],"a":[83],"comprehensive":[84],"microgrid":[85,125,149],"framework":[87,119,142],"address":[89],"known":[90],"software":[91],"problems":[94],"that":[95,111],"limit":[96],"widespread,":[98],"cost-effective":[99],"utilization":[100],"bases.":[105],"team":[108],"includes":[109],"utilities":[110,131],"hold":[112],"utility":[113],"privatization":[114],"(UP)":[115],"contracts,":[116],"been":[121,144],"used":[122],"develop":[124],"plans":[126],"four":[128],"installations":[129],"these":[130],"serve.":[132],"National":[133],"Rural":[134],"Electric":[135],"Cooperative":[136],"Association":[137],"(NRECA)":[138],"Research\u2019s":[139],"able":[145],"identify":[147],"attractive":[148],"candidates,":[150],"optimize":[151],"their":[152],"placement":[153],"components,":[155],"reduce":[157],"soft":[159],"costs":[160],"associated":[161],"process.":[165]},"counts_by_year":[{"year":2024,"cited_by_count":1}],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
