{"id":"https://openalex.org/W3147666140","doi":"https://doi.org/10.1109/isgt49243.2021.9372278","title":"Cost-Benefit Analysis of Load Autonomous Control Device","display_name":"Cost-Benefit Analysis of Load Autonomous Control Device","publication_year":2021,"publication_date":"2021-02-16","ids":{"openalex":"https://openalex.org/W3147666140","doi":"https://doi.org/10.1109/isgt49243.2021.9372278","mag":"3147666140"},"language":"en","primary_location":{"id":"doi:10.1109/isgt49243.2021.9372278","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt49243.2021.9372278","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5062856441","display_name":"Tuomas Talvitie","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Tuomas Talvitie","raw_affiliation_strings":["National Rural Electric Cooperative Association, Arlington, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"National Rural Electric Cooperative Association, Arlington, USA","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5043083359","display_name":"Fathalla Eldali","orcid":"https://orcid.org/0000-0003-1400-9148"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Fathalla Eldali","raw_affiliation_strings":["National Rural Electric Cooperative Association, Arlington, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"National Rural Electric Cooperative Association, Arlington, USA","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5000887834","display_name":"David Pinney","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"David Pinney","raw_affiliation_strings":["National Rural Electric Cooperative Association, Arlington, USA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"National Rural Electric Cooperative Association, Arlington, USA","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.03306573,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"20","issue":null,"first_page":"01","last_page":"05"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9987999796867371,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12277","display_name":"Frequency Control in Power Systems","score":0.9933000206947327,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/payback-period","display_name":"Payback period","score":0.5550501942634583},{"id":"https://openalex.org/keywords/load-management","display_name":"Load management","score":0.5449735522270203},{"id":"https://openalex.org/keywords/control","display_name":"Control (management)","score":0.5017893314361572},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.49137845635414124},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.48240911960601807},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.4823459982872009},{"id":"https://openalex.org/keywords/reserve-requirement","display_name":"Reserve requirement","score":0.4784238934516907},{"id":"https://openalex.org/keywords/net-present-value","display_name":"Net present value","score":0.4390971064567566},{"id":"https://openalex.org/keywords/duration","display_name":"Duration (music)","score":0.4385257065296173},{"id":"https://openalex.org/keywords/cost\u2013benefit-analysis","display_name":"Cost\u2013benefit analysis","score":0.4331654906272888},{"id":"https://openalex.org/keywords/load-balancing","display_name":"Load balancing (electrical power)","score":0.4220537543296814},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.34415581822395325},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.26858872175216675},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.21095117926597595},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.18134501576423645},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.17941832542419434},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.1604965627193451}],"concepts":[{"id":"https://openalex.org/C144553756","wikidata":"https://www.wikidata.org/wiki/Q15081665","display_name":"Payback period","level":3,"score":0.5550501942634583},{"id":"https://openalex.org/C2779370713","wikidata":"https://www.wikidata.org/wiki/Q357554","display_name":"Load management","level":2,"score":0.5449735522270203},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.5017893314361572},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.49137845635414124},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.48240911960601807},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.4823459982872009},{"id":"https://openalex.org/C150149615","wikidata":"https://www.wikidata.org/wiki/Q1058762","display_name":"Reserve requirement","level":4,"score":0.4784238934516907},{"id":"https://openalex.org/C181230689","wikidata":"https://www.wikidata.org/wiki/Q192472","display_name":"Net present value","level":3,"score":0.4390971064567566},{"id":"https://openalex.org/C112758219","wikidata":"https://www.wikidata.org/wiki/Q16038819","display_name":"Duration (music)","level":2,"score":0.4385257065296173},{"id":"https://openalex.org/C127454912","wikidata":"https://www.wikidata.org/wiki/Q942582","display_name":"Cost\u2013benefit analysis","level":2,"score":0.4331654906272888},{"id":"https://openalex.org/C138959212","wikidata":"https://www.wikidata.org/wiki/Q1806783","display_name":"Load balancing (electrical power)","level":3,"score":0.4220537543296814},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.34415581822395325},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.26858872175216675},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.21095117926597595},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.18134501576423645},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.17941832542419434},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.1604965627193451},{"id":"https://openalex.org/C126285488","wikidata":"https://www.wikidata.org/wiki/Q178476","display_name":"Monetary policy","level":2,"score":0.0},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.0},{"id":"https://openalex.org/C124952713","wikidata":"https://www.wikidata.org/wiki/Q8242","display_name":"Literature","level":1,"score":0.0},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.0},{"id":"https://openalex.org/C86803240","wikidata":"https://www.wikidata.org/wiki/Q420","display_name":"Biology","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C556758197","wikidata":"https://www.wikidata.org/wiki/Q580018","display_name":"Monetary economics","level":1,"score":0.0},{"id":"https://openalex.org/C2992735868","wikidata":"https://www.wikidata.org/wiki/Q66344","display_name":"Central bank","level":3,"score":0.0},{"id":"https://openalex.org/C18903297","wikidata":"https://www.wikidata.org/wiki/Q7150","display_name":"Ecology","level":1,"score":0.0},{"id":"https://openalex.org/C142362112","wikidata":"https://www.wikidata.org/wiki/Q735","display_name":"Art","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt49243.2021.9372278","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt49243.2021.9372278","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":8,"referenced_works":["https://openalex.org/W1993362534","https://openalex.org/W2007478227","https://openalex.org/W2030846484","https://openalex.org/W2144288136","https://openalex.org/W2155556726","https://openalex.org/W2313493060","https://openalex.org/W2552974691","https://openalex.org/W3143075780"],"related_works":["https://openalex.org/W2767303485","https://openalex.org/W2918403048","https://openalex.org/W2514944914","https://openalex.org/W3092647649","https://openalex.org/W3093559313","https://openalex.org/W127623911","https://openalex.org/W4386240735","https://openalex.org/W1592542920","https://openalex.org/W1608434648","https://openalex.org/W3013207118"],"abstract_inverted_index":{"The":[0,35],"National":[1],"Rural":[2],"Electric":[3],"Cooperative":[4],"Association":[5],"(NRECA)":[6],"conducted":[7],"a":[8,15,86,101,113],"cost-benefit":[9],"analysis":[10,121],"(CBA)":[11],"of":[12,38,105],"GridBallast":[13,39],"devices,":[14],"potential":[16],"autonomous":[17],"load":[18,74],"controls":[19],"that":[20],"are":[21],"voltage-and":[22],"frequency-reactive,":[23],"to":[24,27,99],"provide":[25],"services":[26,46],"distribution":[28,52,64],"operators":[29],"and":[30,51,72,91],"the":[31,73,119],"bulk":[32],"power":[33],"systems.":[34],"evaluated":[36,76],"benefits":[37],"include":[40],"fast":[41],"reserve":[42,45,57],"services,":[43],"slow":[44],"(ramping":[47],"or":[48],"secondary":[49],"reserves),":[50],"demand":[53],"management.":[54],"We":[55,110],"used":[56],"market":[58],"data":[59,65],"from":[60,66],"PJM's":[61],"2017":[62],"operations,":[63],"an":[67],"anonymous":[68],"NRECA":[69],"cooperative":[70],"member,":[71],"we":[75,84,96],"was":[77],"electric":[78],"water":[79],"heaters.":[80],"For":[81],"most":[82],"scenarios,":[83],"found":[85],"positive":[87],"net":[88],"present":[89],"value,":[90],"under":[92],"reasonable":[93],"cost":[94],"assumptions,":[95],"expect":[97],"devices":[98],"achieve":[100],"simple":[102,114],"payback":[103],"period":[104],"less":[106],"than":[107],"2":[108],"years.":[109],"also":[111],"created":[112],"spreadsheet":[115],"tool":[116,128],"which":[117],"conducts":[118],"same":[120],"as":[122],"presented":[123],"in":[124],"this":[125,127],"paper,":[126],"can":[129],"be":[130],"modified":[131],"for":[132],"other":[133],"markets.":[134]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
