{"id":"https://openalex.org/W2852975468","doi":"https://doi.org/10.1109/isgt.2018.8403371","title":"Capacity configuration optimization for stand-alone microgrid considering the uncertainties of wind and solar resource","display_name":"Capacity configuration optimization for stand-alone microgrid considering the uncertainties of wind and solar resource","publication_year":2018,"publication_date":"2018-02-01","ids":{"openalex":"https://openalex.org/W2852975468","doi":"https://doi.org/10.1109/isgt.2018.8403371","mag":"2852975468"},"language":"en","primary_location":{"id":"doi:10.1109/isgt.2018.8403371","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt.2018.8403371","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5021855763","display_name":"Kangping Li","orcid":"https://orcid.org/0000-0002-9046-7127"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Kangping Li","raw_affiliation_strings":["State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China","institution_ids":["https://openalex.org/I153473198"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100369430","display_name":"Jingjing Zhang","orcid":"https://orcid.org/0009-0007-8591-5515"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jingjing Zhang","raw_affiliation_strings":["State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China","institution_ids":["https://openalex.org/I153473198"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5029410088","display_name":"Jianfeng Che","orcid":null},"institutions":[{"id":"https://openalex.org/I4392738113","display_name":"China Electric Power Research Institute","ror":"https://ror.org/05ehpzy81","country_code":null,"type":"facility","lineage":["https://openalex.org/I17442442","https://openalex.org/I4392738113"]},{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jianfeng Che","raw_affiliation_strings":["State Key Laboratory of Operation and Control of Renewable Energy & Storage System (China Electric Power Research Institute), Beijing, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Operation and Control of Renewable Energy & Storage System (China Electric Power Research Institute), Beijing, China","institution_ids":["https://openalex.org/I153473198","https://openalex.org/I4392738113"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100455868","display_name":"Fei Wang","orcid":"https://orcid.org/0000-0002-7332-9726"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Fei Wang","raw_affiliation_strings":["State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China","institution_ids":["https://openalex.org/I153473198"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5015484149","display_name":"Hui Ren","orcid":"https://orcid.org/0000-0001-9205-0168"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Hui Ren","raw_affiliation_strings":["State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China","institution_ids":["https://openalex.org/I153473198"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5085608153","display_name":"Zengqiang Mi","orcid":null},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Zengqiang Mi","raw_affiliation_strings":["State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China"],"affiliations":[{"raw_affiliation_string":"State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University), Baoding, China","institution_ids":["https://openalex.org/I153473198"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":6,"corresponding_author_ids":["https://openalex.org/A5021855763"],"corresponding_institution_ids":["https://openalex.org/I153473198"],"apc_list":null,"apc_paid":null,"fwci":0.7357,"has_fulltext":false,"cited_by_count":7,"citation_normalized_percentile":{"value":0.71809958,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":96},"biblio":{"volume":"5","issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9993000030517578,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9991000294685364,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/microgrid","display_name":"Microgrid","score":0.8450437188148499},{"id":"https://openalex.org/keywords/cvar","display_name":"CVAR","score":0.8251524567604065},{"id":"https://openalex.org/keywords/latin-hypercube-sampling","display_name":"Latin hypercube sampling","score":0.6657718420028687},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.646851122379303},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.5760757923126221},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.5651201605796814},{"id":"https://openalex.org/keywords/stochastic-optimization","display_name":"Stochastic optimization","score":0.524415135383606},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5154374837875366},{"id":"https://openalex.org/keywords/particle-swarm-optimization","display_name":"Particle swarm optimization","score":0.5057339668273926},{"id":"https://openalex.org/keywords/photovoltaic-system","display_name":"Photovoltaic system","score":0.4682560861110687},{"id":"https://openalex.org/keywords/optimization-problem","display_name":"Optimization problem","score":0.43603214621543884},{"id":"https://openalex.org/keywords/expected-shortfall","display_name":"Expected shortfall","score":0.3246273398399353},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.28058189153671265},{"id":"https://openalex.org/keywords/monte-carlo-method","display_name":"Monte Carlo method","score":0.17146319150924683},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.1625988483428955},{"id":"https://openalex.org/keywords/risk-management","display_name":"Risk management","score":0.1124894917011261},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.09762260317802429},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.09214499592781067}],"concepts":[{"id":"https://openalex.org/C2776784348","wikidata":"https://www.wikidata.org/wiki/Q5762595","display_name":"Microgrid","level":3,"score":0.8450437188148499},{"id":"https://openalex.org/C2779922397","wikidata":"https://www.wikidata.org/wiki/Q5014755","display_name":"CVAR","level":4,"score":0.8251524567604065},{"id":"https://openalex.org/C20820323","wikidata":"https://www.wikidata.org/wiki/Q6496514","display_name":"Latin hypercube sampling","level":3,"score":0.6657718420028687},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.646851122379303},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.5760757923126221},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.5651201605796814},{"id":"https://openalex.org/C194387892","wikidata":"https://www.wikidata.org/wiki/Q1747770","display_name":"Stochastic optimization","level":2,"score":0.524415135383606},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5154374837875366},{"id":"https://openalex.org/C85617194","wikidata":"https://www.wikidata.org/wiki/Q2072794","display_name":"Particle swarm optimization","level":2,"score":0.5057339668273926},{"id":"https://openalex.org/C41291067","wikidata":"https://www.wikidata.org/wiki/Q1897785","display_name":"Photovoltaic system","level":2,"score":0.4682560861110687},{"id":"https://openalex.org/C137836250","wikidata":"https://www.wikidata.org/wiki/Q984063","display_name":"Optimization problem","level":2,"score":0.43603214621543884},{"id":"https://openalex.org/C5496284","wikidata":"https://www.wikidata.org/wiki/Q5420856","display_name":"Expected shortfall","level":3,"score":0.3246273398399353},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.28058189153671265},{"id":"https://openalex.org/C19499675","wikidata":"https://www.wikidata.org/wiki/Q232207","display_name":"Monte Carlo method","level":2,"score":0.17146319150924683},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.1625988483428955},{"id":"https://openalex.org/C32896092","wikidata":"https://www.wikidata.org/wiki/Q189447","display_name":"Risk management","level":2,"score":0.1124894917011261},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.09762260317802429},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.09214499592781067},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0},{"id":"https://openalex.org/C187736073","wikidata":"https://www.wikidata.org/wiki/Q2920921","display_name":"Management","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt.2018.8403371","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt.2018.8403371","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE Power &amp; Energy Society Innovative Smart Grid Technologies Conference (ISGT)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","score":0.7799999713897705,"id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":7,"referenced_works":["https://openalex.org/W2004170288","https://openalex.org/W2030810955","https://openalex.org/W2057463125","https://openalex.org/W2071884028","https://openalex.org/W2074457964","https://openalex.org/W2365502470","https://openalex.org/W2589489991"],"related_works":["https://openalex.org/W4316167276","https://openalex.org/W2002736235","https://openalex.org/W2232143283","https://openalex.org/W1647779468","https://openalex.org/W48101171","https://openalex.org/W2008510020","https://openalex.org/W2096554740","https://openalex.org/W2989754218","https://openalex.org/W3124407081","https://openalex.org/W3096753274"],"abstract_inverted_index":{"This":[0],"paper":[1],"focuses":[2],"on":[3,17,75],"capacity":[4],"configuration":[5],"optimization":[6,14,94,110,119,127],"for":[7],"the":[8,27,34,61,67,76,83,116,145,157],"stand-alone":[9],"Wind-PV-Diesel-Battery":[10],"microgrid.":[11],"A":[12],"stochastic":[13,93,126],"model":[15,95,147],"based":[16,74],"conditional":[18],"value":[19],"at":[20],"risk":[21,29,132],"(CVaR)":[22],"is":[23,64,101,112],"proposed":[24,146],"to":[25,114,151],"consider":[26],"operation":[28,154],"of":[30,36,45,47,69,78,89,123,134],"microgrid":[31,79],"caused":[32],"by":[33,66,131],"uncertainties":[35],"wind":[37,48],"and":[38,49,60,85,125,137],"solar":[39,50],"resource.":[40],"First,":[41],"a":[42,92],"large":[43],"number":[44],"scenarios":[46,62,155],"resources":[51],"are":[52,129],"generated":[53],"using":[54],"Latin":[55],"Hypercube":[56],"Sampling":[57],"(LHS)":[58],"method,":[59],"reduction":[63],"subtracted":[65],"use":[68],"K-medoids":[70],"clustering":[71],"algorithm.":[72],"Second,":[73],"reliability":[77],"power":[80,135],"supply,":[81],"considering":[82],"economy":[84],"high":[86],"utilization":[87],"rate":[88],"renewable":[90],"energy,":[91],"with":[96,104],"minimum":[97],"annual":[98],"comprehensive":[99],"cost":[100],"established":[102],"combined":[103],"CVaR.":[105],"Finally,":[106],"binary":[107],"particle":[108],"swarm":[109],"algorithm":[111],"used":[113],"solve":[115],"above":[117],"integer":[118],"model.":[120],"The":[121],"results":[122,142],"deterministic":[124],"models":[128],"evaluated":[130],"index":[133],"loss":[136,139],"load":[138],"respectively.":[140],"Simulation":[141],"show":[143],"that":[144],"can":[148],"well":[149],"accommodate":[150],"many":[152],"possible":[153],"in":[156],"future.":[158]},"counts_by_year":[{"year":2024,"cited_by_count":1},{"year":2023,"cited_by_count":2},{"year":2021,"cited_by_count":1},{"year":2020,"cited_by_count":2},{"year":2019,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
