{"id":"https://openalex.org/W4254793362","doi":"https://doi.org/10.1109/isgt.2014.6816486","title":"Day ahead hourly load forecast of PJM electricity market and iso new england market by using artificial neural network","display_name":"Day ahead hourly load forecast of PJM electricity market and iso new england market by using artificial neural network","publication_year":2014,"publication_date":"2014-02-01","ids":{"openalex":"https://openalex.org/W4254793362","doi":"https://doi.org/10.1109/isgt.2014.6816486"},"language":"en","primary_location":{"id":"doi:10.1109/isgt.2014.6816486","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt.2014.6816486","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ISGT 2014","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5045901552","display_name":"Kishan Bhushan Sahay","orcid":"https://orcid.org/0000-0003-2701-7315"},"institutions":[{"id":"https://openalex.org/I863896202","display_name":"Delhi Technological University","ror":"https://ror.org/01ztcvt22","country_code":"IN","type":"education","lineage":["https://openalex.org/I863896202"]}],"countries":["IN"],"is_corresponding":true,"raw_author_name":"Kishan Bhushan Sahay","raw_affiliation_strings":["Department of Electrical Engineering, Delhi Technological University, New Delhi, India"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Delhi Technological University, New Delhi, India","institution_ids":["https://openalex.org/I863896202"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5029988366","display_name":"M. M. Tripathi","orcid":"https://orcid.org/0000-0003-1675-1039"},"institutions":[{"id":"https://openalex.org/I863896202","display_name":"Delhi Technological University","ror":"https://ror.org/01ztcvt22","country_code":"IN","type":"education","lineage":["https://openalex.org/I863896202"]}],"countries":["IN"],"is_corresponding":false,"raw_author_name":"M.M. Tripathi","raw_affiliation_strings":["Department of Electrical Engineering, Delhi Technological University, New Delhi, India"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Delhi Technological University, New Delhi, India","institution_ids":["https://openalex.org/I863896202"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5045901552"],"corresponding_institution_ids":["https://openalex.org/I863896202"],"apc_list":null,"apc_paid":null,"fwci":0.628,"has_fulltext":false,"cited_by_count":33,"citation_normalized_percentile":{"value":0.75679029,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":99},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9977999925613403,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9751999974250793,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/artificial-neural-network","display_name":"Artificial neural network","score":0.7269703149795532},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.6678116321563721},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.6177734136581421},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5713163614273071},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5607016086578369},{"id":"https://openalex.org/keywords/new-england","display_name":"New england","score":0.4646989703178406},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.4506351351737976},{"id":"https://openalex.org/keywords/reliability","display_name":"Reliability (semiconductor)","score":0.44993168115615845},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.43597447872161865},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.4223182797431946},{"id":"https://openalex.org/keywords/electrical-load","display_name":"Electrical load","score":0.41587939858436584},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.2890505790710449},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.2698621451854706},{"id":"https://openalex.org/keywords/artificial-intelligence","display_name":"Artificial intelligence","score":0.22636383771896362},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.21958547830581665},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.13647794723510742}],"concepts":[{"id":"https://openalex.org/C50644808","wikidata":"https://www.wikidata.org/wiki/Q192776","display_name":"Artificial neural network","level":2,"score":0.7269703149795532},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.6678116321563721},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.6177734136581421},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5713163614273071},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5607016086578369},{"id":"https://openalex.org/C3019323424","wikidata":"https://www.wikidata.org/wiki/Q18389","display_name":"New england","level":3,"score":0.4646989703178406},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4506351351737976},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.44993168115615845},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.43597447872161865},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.4223182797431946},{"id":"https://openalex.org/C77715397","wikidata":"https://www.wikidata.org/wiki/Q931447","display_name":"Electrical load","level":3,"score":0.41587939858436584},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2890505790710449},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.2698621451854706},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.22636383771896362},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.21958547830581665},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.13647794723510742},{"id":"https://openalex.org/C34447519","wikidata":"https://www.wikidata.org/wiki/Q179522","display_name":"Market economy","level":1,"score":0.0},{"id":"https://openalex.org/C2779233565","wikidata":"https://www.wikidata.org/wiki/Q241588","display_name":"Middle class","level":2,"score":0.0},{"id":"https://openalex.org/C165801399","wikidata":"https://www.wikidata.org/wiki/Q25428","display_name":"Voltage","level":2,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt.2014.6816486","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt.2014.6816486","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"ISGT 2014","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","score":0.41999998688697815,"display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":6,"referenced_works":["https://openalex.org/W1958819020","https://openalex.org/W2018915553","https://openalex.org/W2071258353","https://openalex.org/W2117062870","https://openalex.org/W2143421648","https://openalex.org/W2189255968"],"related_works":["https://openalex.org/W3005545942","https://openalex.org/W2356680598","https://openalex.org/W2966111772","https://openalex.org/W2385067961","https://openalex.org/W2299915012","https://openalex.org/W2383586764","https://openalex.org/W4327773935","https://openalex.org/W2014767125","https://openalex.org/W2305061769","https://openalex.org/W2477218593"],"abstract_inverted_index":{"Day":[0],"ahead":[1],"hourly":[2,57,87,102,132],"load":[3,22,50,135,151],"forecasting":[4,51],"is":[5,99,139,158],"an":[6],"essential":[7],"instrument":[8],"in":[9,48,81,146],"power":[10,61],"system":[11,62],"planning,":[12],"operation,":[13],"and":[14,33,93,110,118],"control.":[15],"Many":[16],"operating":[17],"decisions":[18],"are":[19,86],"based":[20],"on":[21,101,120],"forecasts,":[23],"such":[24],"as":[25,163,170],"dispatch":[26],"scheduling":[27],"of":[28,44,59,84,90,134],"generating":[29],"capacity,":[30],"reliability":[31],"analysis,":[32],"maintenance":[34],"planning":[35],"for":[36,153,174],"the":[37,55,60,75,82,91,105,148],"generators.":[38],"This":[39],"paper":[40],"discusses":[41],"significant":[42],"role":[43],"artificial":[45,66],"intelligence":[46],"(AI)":[47],"short-term":[49],"(STLF),":[52],"that":[53,130],"is,":[54],"day-ahead":[56,131],"forecast":[58,152],"load.":[63,77,95],"A":[64],"new":[65],"neural":[67],"network":[68],"(ANN)":[69],"has":[70,166],"been":[71,168],"designed":[72],"to":[73,116,172],"compute":[74],"forecasted":[76],"The":[78,96],"data":[79,89,103,122,165],"used":[80],"modeling":[83],"ANN":[85,97,138,173],"historical":[88],"temperature":[92,164],"electricity":[94],"model":[98],"trained":[100],"from":[104,114,123],"ISO":[106,154],"New":[107,155],"England":[108,156],"market":[109,157,162],"PJM":[111,161],"Electricity":[112],"Market":[113],"2007":[115],"2011":[117],"tested":[119],"out-of-sample":[121],"2012.":[124],"Simulation":[125],"results":[126],"obtained":[127],"have":[128],"shown":[129],"forecasts":[133],"using":[136],"proposed":[137],"very":[140,143],"accurate":[141],"with":[142],"less":[144],"error":[145],"both":[147],"markets.":[149],"However":[150],"better":[159],"than":[160],"also":[167],"considered":[169],"input":[171],"this":[175],"market.":[176]},"counts_by_year":[{"year":2026,"cited_by_count":1},{"year":2024,"cited_by_count":2},{"year":2023,"cited_by_count":4},{"year":2022,"cited_by_count":2},{"year":2021,"cited_by_count":8},{"year":2020,"cited_by_count":8},{"year":2019,"cited_by_count":4},{"year":2018,"cited_by_count":1},{"year":2016,"cited_by_count":1},{"year":2014,"cited_by_count":2}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
