{"id":"https://openalex.org/W2807998511","doi":"https://doi.org/10.1109/isgt-asia.2017.8378423","title":"Demand power forecasting with data mining method in smart grid","display_name":"Demand power forecasting with data mining method in smart grid","publication_year":2017,"publication_date":"2017-12-01","ids":{"openalex":"https://openalex.org/W2807998511","doi":"https://doi.org/10.1109/isgt-asia.2017.8378423","mag":"2807998511"},"language":"en","primary_location":{"id":"doi:10.1109/isgt-asia.2017.8378423","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2017.8378423","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2017 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5027738445","display_name":"Seunghyeon Park","orcid":null},"institutions":[{"id":"https://openalex.org/I31419693","display_name":"Kyungpook National University","ror":"https://ror.org/040c17130","country_code":"KR","type":"education","lineage":["https://openalex.org/I31419693"]}],"countries":["KR"],"is_corresponding":true,"raw_author_name":"Seunghyeon Park","raw_affiliation_strings":["Department of Electrical Engineering, Kyungpook National University, Daegu, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Kyungpook National University, Daegu, South Korea","institution_ids":["https://openalex.org/I31419693"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5101882212","display_name":"Sekyung Han","orcid":null},"institutions":[{"id":"https://openalex.org/I31419693","display_name":"Kyungpook National University","ror":"https://ror.org/040c17130","country_code":"KR","type":"education","lineage":["https://openalex.org/I31419693"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Sekyung Han","raw_affiliation_strings":["Department of Electrical Engineering, Kyungpook National University, Daegu, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, Kyungpook National University, Daegu, South Korea","institution_ids":["https://openalex.org/I31419693"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5046242217","display_name":"Yeongik Son","orcid":null},"institutions":[{"id":"https://openalex.org/I3019177047","display_name":"Korea Institute of Civil Engineering and Building Technology","ror":"https://ror.org/035enhp47","country_code":"KR","type":"government","lineage":["https://openalex.org/I2801339556","https://openalex.org/I3019177047","https://openalex.org/I4210144908","https://openalex.org/I4387152098"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Yeongik Son","raw_affiliation_strings":["Korea Institute of Building Energy Technology, Seoul, South Korea"],"affiliations":[{"raw_affiliation_string":"Korea Institute of Building Energy Technology, Seoul, South Korea","institution_ids":["https://openalex.org/I3019177047"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5027738445"],"corresponding_institution_ids":["https://openalex.org/I31419693"],"apc_list":null,"apc_paid":null,"fwci":1.0034,"has_fulltext":false,"cited_by_count":14,"citation_normalized_percentile":{"value":0.79017345,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":98},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"6"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9983999729156494,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9983999729156494,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11344","display_name":"Traffic Prediction and Management Techniques","score":0.9839000105857849,"subfield":{"id":"https://openalex.org/subfields/2215","display_name":"Building and Construction"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.970300018787384,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/autoregressive-integrated-moving-average","display_name":"Autoregressive integrated moving average","score":0.8380329608917236},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.734139084815979},{"id":"https://openalex.org/keywords/cluster-analysis","display_name":"Cluster analysis","score":0.630214512348175},{"id":"https://openalex.org/keywords/smart-grid","display_name":"Smart grid","score":0.6238288283348083},{"id":"https://openalex.org/keywords/artificial-neural-network","display_name":"Artificial neural network","score":0.596697986125946},{"id":"https://openalex.org/keywords/demand-forecasting","display_name":"Demand forecasting","score":0.5870764255523682},{"id":"https://openalex.org/keywords/key","display_name":"Key (lock)","score":0.5667949318885803},{"id":"https://openalex.org/keywords/data-mining","display_name":"Data mining","score":0.5318203568458557},{"id":"https://openalex.org/keywords/power-demand","display_name":"Power demand","score":0.47168734669685364},{"id":"https://openalex.org/keywords/bayesian-probability","display_name":"Bayesian probability","score":0.4368407130241394},{"id":"https://openalex.org/keywords/time-series","display_name":"Time series","score":0.43360480666160583},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.3548091650009155},{"id":"https://openalex.org/keywords/artificial-intelligence","display_name":"Artificial intelligence","score":0.2981901168823242},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.28461116552352905},{"id":"https://openalex.org/keywords/machine-learning","display_name":"Machine learning","score":0.253548264503479},{"id":"https://openalex.org/keywords/power-consumption","display_name":"Power consumption","score":0.2209758460521698},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.15322136878967285}],"concepts":[{"id":"https://openalex.org/C24338571","wikidata":"https://www.wikidata.org/wiki/Q2566298","display_name":"Autoregressive integrated moving average","level":3,"score":0.8380329608917236},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.734139084815979},{"id":"https://openalex.org/C73555534","wikidata":"https://www.wikidata.org/wiki/Q622825","display_name":"Cluster analysis","level":2,"score":0.630214512348175},{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.6238288283348083},{"id":"https://openalex.org/C50644808","wikidata":"https://www.wikidata.org/wiki/Q192776","display_name":"Artificial neural network","level":2,"score":0.596697986125946},{"id":"https://openalex.org/C193809577","wikidata":"https://www.wikidata.org/wiki/Q3409300","display_name":"Demand forecasting","level":2,"score":0.5870764255523682},{"id":"https://openalex.org/C26517878","wikidata":"https://www.wikidata.org/wiki/Q228039","display_name":"Key (lock)","level":2,"score":0.5667949318885803},{"id":"https://openalex.org/C124101348","wikidata":"https://www.wikidata.org/wiki/Q172491","display_name":"Data mining","level":1,"score":0.5318203568458557},{"id":"https://openalex.org/C2983317576","wikidata":"https://www.wikidata.org/wiki/Q1853339","display_name":"Power demand","level":4,"score":0.47168734669685364},{"id":"https://openalex.org/C107673813","wikidata":"https://www.wikidata.org/wiki/Q812534","display_name":"Bayesian probability","level":2,"score":0.4368407130241394},{"id":"https://openalex.org/C151406439","wikidata":"https://www.wikidata.org/wiki/Q186588","display_name":"Time series","level":2,"score":0.43360480666160583},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3548091650009155},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.2981901168823242},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.28461116552352905},{"id":"https://openalex.org/C119857082","wikidata":"https://www.wikidata.org/wiki/Q2539","display_name":"Machine learning","level":1,"score":0.253548264503479},{"id":"https://openalex.org/C2984118289","wikidata":"https://www.wikidata.org/wiki/Q29954","display_name":"Power consumption","level":3,"score":0.2209758460521698},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.15322136878967285},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C38652104","wikidata":"https://www.wikidata.org/wiki/Q3510521","display_name":"Computer security","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt-asia.2017.8378423","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2017.8378423","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2017 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.8999999761581421,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W895582153","https://openalex.org/W2080443218","https://openalex.org/W2103504194","https://openalex.org/W2107634461","https://openalex.org/W2109018050","https://openalex.org/W2165022825","https://openalex.org/W2343586331","https://openalex.org/W2405856240","https://openalex.org/W2618016010","https://openalex.org/W3140675287","https://openalex.org/W6676407442"],"related_works":["https://openalex.org/W3175321409","https://openalex.org/W4312561791","https://openalex.org/W2389894046","https://openalex.org/W2215717369","https://openalex.org/W4312309719","https://openalex.org/W4313123484","https://openalex.org/W2146461990","https://openalex.org/W4200142652","https://openalex.org/W1527014014","https://openalex.org/W4383613901"],"abstract_inverted_index":{"Nowadays":[0],"increasing":[1,12],"electricity":[2],"demand":[3,10,26,45],"is":[4,11,19,29,111],"a":[5,44,54],"key":[6],"issue.":[7],"As":[8],"the":[9,67,84,120,127],"day":[13],"by":[14],"day,":[15],"obtaining":[16],"energy":[17,33],"efficiency":[18,34],"also":[20,124],"getting":[21],"important.":[22],"Hence":[23],"developing":[24],"accurate":[25],"forecasting":[27,46,86],"methods":[28],"crucial":[30],"for":[31],"ensuring":[32],"through":[35],"efficient":[36],"system":[37],"operation.":[38],"In":[39],"this":[40,73,82],"paper,":[41],"we":[42],"suggested":[43],"method":[47,56],"with":[48,98,126],"data":[49],"mining":[50],"techniques.":[51],"We":[52],"proposed":[53,85,114,121,138],"hybrid":[55],"which":[57],"combined":[58],"K-means":[59],"clustering,":[60],"Bayesian":[61],"classification":[62],"and":[63],"ARIMA.":[64],"Most":[65],"of":[66,119,137],"previous":[68],"research":[69],"tried":[70],"to":[71,141],"solve":[72],"issue":[74],"from":[75,102,113],"supply":[76],"side":[77],"management":[78],"but":[79],"here":[80],"in":[81],"paper":[83],"model":[87,122,139],"works":[88],"on":[89],"consumer":[90],"side.":[91],"Case":[92],"study":[93],"has":[94],"been":[95],"carried":[96],"out":[97],"actual":[99],"load":[100],"profile":[101],"Jeju":[103],"island,":[104],"South":[105],"Korea.":[106],"The":[107,117,132],"minimum":[108],"error":[109],"rate":[110],"0.1853":[112],"Hybrid":[115],"Model.":[116],"performance":[118,136],"was":[123],"compared":[125,140],"Neural":[128,142],"Network":[129],"based":[130],"forecasting.":[131],"comparison":[133],"shows":[134],"better":[135],"Network.":[143]},"counts_by_year":[{"year":2024,"cited_by_count":1},{"year":2023,"cited_by_count":1},{"year":2022,"cited_by_count":1},{"year":2021,"cited_by_count":4},{"year":2020,"cited_by_count":2},{"year":2019,"cited_by_count":4},{"year":2018,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
