{"id":"https://openalex.org/W2246154617","doi":"https://doi.org/10.1109/isgt-asia.2015.7387119","title":"Economic dispatch integrating wind power generation farms using cuckoo search algorithm","display_name":"Economic dispatch integrating wind power generation farms using cuckoo search algorithm","publication_year":2015,"publication_date":"2015-11-01","ids":{"openalex":"https://openalex.org/W2246154617","doi":"https://doi.org/10.1109/isgt-asia.2015.7387119","mag":"2246154617"},"language":"en","primary_location":{"id":"doi:10.1109/isgt-asia.2015.7387119","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2015.7387119","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5033341747","display_name":"Duy C. Huynh","orcid":"https://orcid.org/0000-0003-3369-0127"},"institutions":[{"id":"https://openalex.org/I47265099","display_name":"Ho Chi Minh City University of Technology","ror":"https://ror.org/04qva2324","country_code":"VN","type":"education","lineage":["https://openalex.org/I123565023","https://openalex.org/I47265099"]}],"countries":["VN"],"is_corresponding":true,"raw_author_name":"Duy C. Huynh","raw_affiliation_strings":["Electrical Engineering Department, Ho Chi Minh City University of Technology, Ho Chi Minh City, Vietnam"],"affiliations":[{"raw_affiliation_string":"Electrical Engineering Department, Ho Chi Minh City University of Technology, Ho Chi Minh City, Vietnam","institution_ids":["https://openalex.org/I47265099"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5068740589","display_name":"Nirmal\u2010Kumar C. Nair","orcid":"https://orcid.org/0000-0002-8456-3999"},"institutions":[{"id":"https://openalex.org/I154130895","display_name":"University of Auckland","ror":"https://ror.org/03b94tp07","country_code":"NZ","type":"education","lineage":["https://openalex.org/I154130895"]}],"countries":["NZ"],"is_corresponding":false,"raw_author_name":"Nirmal Nair","raw_affiliation_strings":["Electrical and Computer Engineering Department, The University of Auckland, Auckland, New Zealand"],"affiliations":[{"raw_affiliation_string":"Electrical and Computer Engineering Department, The University of Auckland, Auckland, New Zealand","institution_ids":["https://openalex.org/I154130895"]}]}],"institutions":[],"countries_distinct_count":2,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5033341747"],"corresponding_institution_ids":["https://openalex.org/I47265099"],"apc_list":null,"apc_paid":null,"fwci":0.1973,"has_fulltext":false,"cited_by_count":9,"citation_normalized_percentile":{"value":0.60161381,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":97},"biblio":{"volume":"6","issue":null,"first_page":"1","last_page":"6"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9966999888420105,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.9934999942779541,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/cuckoo-search","display_name":"Cuckoo search","score":0.8017807006835938},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.7591593265533447},{"id":"https://openalex.org/keywords/economic-dispatch","display_name":"Economic dispatch","score":0.7388774156570435},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.636185348033905},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.6168386936187744},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5493084192276001},{"id":"https://openalex.org/keywords/electricity-generation","display_name":"Electricity generation","score":0.47805339097976685},{"id":"https://openalex.org/keywords/electric-power-transmission","display_name":"Electric power transmission","score":0.42764997482299805},{"id":"https://openalex.org/keywords/search-algorithm","display_name":"Search algorithm","score":0.4165256917476654},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.403641015291214},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.4024606943130493},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.39953935146331787},{"id":"https://openalex.org/keywords/particle-swarm-optimization","display_name":"Particle swarm optimization","score":0.3604710102081299},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.33763593435287476},{"id":"https://openalex.org/keywords/automotive-engineering","display_name":"Automotive engineering","score":0.32793307304382324},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.1735071837902069},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.11251366138458252}],"concepts":[{"id":"https://openalex.org/C117241572","wikidata":"https://www.wikidata.org/wiki/Q5192379","display_name":"Cuckoo search","level":3,"score":0.8017807006835938},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.7591593265533447},{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.7388774156570435},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.636185348033905},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.6168386936187744},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5493084192276001},{"id":"https://openalex.org/C423512","wikidata":"https://www.wikidata.org/wiki/Q383973","display_name":"Electricity generation","level":3,"score":0.47805339097976685},{"id":"https://openalex.org/C140311924","wikidata":"https://www.wikidata.org/wiki/Q200928","display_name":"Electric power transmission","level":2,"score":0.42764997482299805},{"id":"https://openalex.org/C125583679","wikidata":"https://www.wikidata.org/wiki/Q755673","display_name":"Search algorithm","level":2,"score":0.4165256917476654},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.403641015291214},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.4024606943130493},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.39953935146331787},{"id":"https://openalex.org/C85617194","wikidata":"https://www.wikidata.org/wiki/Q2072794","display_name":"Particle swarm optimization","level":2,"score":0.3604710102081299},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.33763593435287476},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.32793307304382324},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.1735071837902069},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.11251366138458252},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt-asia.2015.7387119","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2015.7387119","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7","score":0.7900000214576721}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":23,"referenced_works":["https://openalex.org/W1532470827","https://openalex.org/W1553010236","https://openalex.org/W1596914020","https://openalex.org/W1774026425","https://openalex.org/W1976744965","https://openalex.org/W1979356488","https://openalex.org/W1992812930","https://openalex.org/W2000135657","https://openalex.org/W2027765904","https://openalex.org/W2040255061","https://openalex.org/W2128788487","https://openalex.org/W2139055885","https://openalex.org/W2152195021","https://openalex.org/W2186058797","https://openalex.org/W2287814884","https://openalex.org/W2332531356","https://openalex.org/W2374862514","https://openalex.org/W2541030712","https://openalex.org/W2542044613","https://openalex.org/W3138355580","https://openalex.org/W6638001319","https://openalex.org/W6696126189","https://openalex.org/W6728432684"],"related_works":["https://openalex.org/W1978568284","https://openalex.org/W2102833174","https://openalex.org/W2753354457","https://openalex.org/W2742451303","https://openalex.org/W2776887934","https://openalex.org/W3004914311","https://openalex.org/W2462345271","https://openalex.org/W2805172798","https://openalex.org/W1972908963","https://openalex.org/W2100400127"],"abstract_inverted_index":{"This":[0],"paper":[1,45],"proposes":[2,46],"a":[3,13,87],"cuckoo":[4],"search":[5],"(CS)":[6],"algorithm":[7,22,71,110,130,138],"for":[8],"economic":[9],"dispatch":[10,114],"(ED)":[11],"of":[12,35,75,106,116,134],"power":[14,37,41,50,77,98,150],"system":[15,38,51,78],"integrated":[16,152],"wind":[17,53,82,122,153],"energy":[18,54,123,154],"sources.":[19,155],"The":[20,69,100,125],"proposed":[21,108,136],"is":[23,84],"to":[24,29,47,111,143],"seek":[25],"the":[26,31,36,44,49,76,104,107,117,121,128,132,135,145],"optimal":[27,113],"generated-powers":[28],"minimize":[30],"total":[32],"generation":[33],"costs":[34],"with":[39,52,79,127],"thermal":[40],"plants.":[42],"Additionally,":[43],"integrate":[48],"sources":[55],"which":[56],"are":[57],"renewable,":[58],"widely":[59],"distributed,":[60],"clean":[61],"and":[62,80,139],"no":[63],"greenhouse":[64],"gas":[65],"emissions":[66],"during":[67],"operation.":[68],"CS":[70,109,137],"based":[72],"ED":[73,118,146],"problem":[74,119],"without":[81],"powers":[83],"considered":[85],"on":[86],"modified":[88],"IEEE":[89],"30-bus":[90],"6-conventional":[91],"generator":[92],"2-wind":[93],"farm":[94],"41-transmission":[95],"line":[96],"test":[97],"system.":[99],"numerical":[101],"results":[102],"validate":[103],"capabilities":[105],"generate":[112],"solutions":[115],"incorporating":[120],"resources.":[124],"comparison":[126],"PSO":[129],"demonstrates":[131],"superiority":[133],"confirms":[140],"its":[141],"potential":[142],"solve":[144],"problem,":[147],"especially":[148],"in":[149],"systems":[151]},"counts_by_year":[{"year":2023,"cited_by_count":3},{"year":2022,"cited_by_count":1},{"year":2021,"cited_by_count":2},{"year":2020,"cited_by_count":2},{"year":2016,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
