{"id":"https://openalex.org/W2246160778","doi":"https://doi.org/10.1109/isgt-asia.2015.7387095","title":"MEA Smart Grid roadmap and initiation of the smart district office building pilot project","display_name":"MEA Smart Grid roadmap and initiation of the smart district office building pilot project","publication_year":2015,"publication_date":"2015-11-01","ids":{"openalex":"https://openalex.org/W2246160778","doi":"https://doi.org/10.1109/isgt-asia.2015.7387095","mag":"2246160778"},"language":"en","primary_location":{"id":"doi:10.1109/isgt-asia.2015.7387095","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2015.7387095","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5083113851","display_name":"A. Phayomhom","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"A. Phayomhom","raw_affiliation_strings":["Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand"],"affiliations":[{"raw_affiliation_string":"Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5019807371","display_name":"N. Chotiheerunyasakaya","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"N. Chotiheerunyasakaya","raw_affiliation_strings":["Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand"],"affiliations":[{"raw_affiliation_string":"Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5008290226","display_name":"M. Kheawkham","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"M. Kheawkham","raw_affiliation_strings":["Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand"],"affiliations":[{"raw_affiliation_string":"Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5000870431","display_name":"S. Songsit","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"S. Songsit","raw_affiliation_strings":["Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand"],"affiliations":[{"raw_affiliation_string":"Department of Power System Planning, Metropolitan Electricity Authority (MEA), Bangkok, Thailand","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":4,"corresponding_author_ids":["https://openalex.org/A5083113851"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.1973,"has_fulltext":false,"cited_by_count":2,"citation_normalized_percentile":{"value":0.60162256,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":94},"biblio":{"volume":"3","issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10917","display_name":"Smart Grid Security and Resilience","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9975000023841858,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/smart-grid","display_name":"Smart grid","score":0.8205955624580383},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.655921220779419},{"id":"https://openalex.org/keywords/smart-city","display_name":"Smart city","score":0.4710661768913269},{"id":"https://openalex.org/keywords/photovoltaic-system","display_name":"Photovoltaic system","score":0.451758474111557},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.44660666584968567},{"id":"https://openalex.org/keywords/energy-management-system","display_name":"Energy management system","score":0.44021356105804443},{"id":"https://openalex.org/keywords/service","display_name":"Service (business)","score":0.41981077194213867},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.4111979305744171},{"id":"https://openalex.org/keywords/energy-management","display_name":"Energy management","score":0.40881022810935974},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.3981616795063019},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.3606554865837097},{"id":"https://openalex.org/keywords/systems-engineering","display_name":"Systems engineering","score":0.3595178723335266},{"id":"https://openalex.org/keywords/architectural-engineering","display_name":"Architectural engineering","score":0.3455125391483307},{"id":"https://openalex.org/keywords/telecommunications","display_name":"Telecommunications","score":0.3374320864677429},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.21666473150253296},{"id":"https://openalex.org/keywords/embedded-system","display_name":"Embedded system","score":0.21306633949279785},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.17385458946228027},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.17324844002723694},{"id":"https://openalex.org/keywords/energy","display_name":"Energy (signal processing)","score":0.14087873697280884},{"id":"https://openalex.org/keywords/internet-of-things","display_name":"Internet of Things","score":0.08274000883102417}],"concepts":[{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.8205955624580383},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.655921220779419},{"id":"https://openalex.org/C2777103469","wikidata":"https://www.wikidata.org/wiki/Q1231558","display_name":"Smart city","level":3,"score":0.4710661768913269},{"id":"https://openalex.org/C41291067","wikidata":"https://www.wikidata.org/wiki/Q1897785","display_name":"Photovoltaic system","level":2,"score":0.451758474111557},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.44660666584968567},{"id":"https://openalex.org/C2781260460","wikidata":"https://www.wikidata.org/wiki/Q6139999","display_name":"Energy management system","level":4,"score":0.44021356105804443},{"id":"https://openalex.org/C2780378061","wikidata":"https://www.wikidata.org/wiki/Q25351891","display_name":"Service (business)","level":2,"score":0.41981077194213867},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.4111979305744171},{"id":"https://openalex.org/C7817414","wikidata":"https://www.wikidata.org/wiki/Q1779504","display_name":"Energy management","level":3,"score":0.40881022810935974},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3981616795063019},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.3606554865837097},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.3595178723335266},{"id":"https://openalex.org/C170154142","wikidata":"https://www.wikidata.org/wiki/Q150737","display_name":"Architectural engineering","level":1,"score":0.3455125391483307},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.3374320864677429},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.21666473150253296},{"id":"https://openalex.org/C149635348","wikidata":"https://www.wikidata.org/wiki/Q193040","display_name":"Embedded system","level":1,"score":0.21306633949279785},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.17385458946228027},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.17324844002723694},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.14087873697280884},{"id":"https://openalex.org/C81860439","wikidata":"https://www.wikidata.org/wiki/Q251212","display_name":"Internet of Things","level":2,"score":0.08274000883102417},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/isgt-asia.2015.7387095","is_oa":false,"landing_page_url":"https://doi.org/10.1109/isgt-asia.2015.7387095","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2015 IEEE Innovative Smart Grid Technologies - Asia (ISGT ASIA)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.4699999988079071,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":15,"referenced_works":["https://openalex.org/W1526129569","https://openalex.org/W1604973446","https://openalex.org/W2065193193","https://openalex.org/W2082550319","https://openalex.org/W2088299474","https://openalex.org/W2096814182","https://openalex.org/W2110449981","https://openalex.org/W2119866123","https://openalex.org/W2137243960","https://openalex.org/W2145397365","https://openalex.org/W2155556726","https://openalex.org/W2257818135","https://openalex.org/W2475705155","https://openalex.org/W6692199829","https://openalex.org/W6720707982"],"related_works":["https://openalex.org/W2749199243","https://openalex.org/W2333017163","https://openalex.org/W2362940481","https://openalex.org/W2133545517","https://openalex.org/W2352231626","https://openalex.org/W2964681094","https://openalex.org/W2782741053","https://openalex.org/W4312501103","https://openalex.org/W2577786578","https://openalex.org/W3037868018"],"abstract_inverted_index":{"This":[0],"paper":[1],"presents":[2],"the":[3,10,102,133,137,144],"revised":[4],"MEA":[5,19,54],"Smart":[6,14,20,28,40,42,56,116,127],"Grid":[7,21,29,57,117],"roadmap":[8,22],"and":[9,44,49,72,78,82,97,140,146],"pilot":[11,107,112],"project":[12,108,113],"called":[13],"District":[15],"Office":[16],"Building.":[17],"The":[18,111],"which":[23],"is":[24,58,109],"aligned":[25],"with":[26,65],"National":[27],"Policy":[30],"of":[31,67,104],"Thailand,":[32],"mainly":[33],"focuses":[34],"on":[35],"3":[36],"important":[37],"enhancement":[38],"aspects:":[39],"System,":[41],"Service":[43],"Green":[45],"Society":[46],"for":[47,93],"smart":[48],"low":[50],"carbon":[51],"city.":[52],"In":[53,100],"viewpoint,":[55],"viewed":[59],"as":[60,87,89],"electric":[61],"power":[62,134],"distribution":[63],"system":[64,70],"integration":[66],"both":[68],"electrical":[69],"infrastructure":[71],"ICT":[73],"leads":[74],"to":[75,131,143],"higher":[76],"reliability":[77],"stability,":[79],"better":[80],"efficiency,":[81],"accommodating":[83],"renewable":[84],"energy":[85,105],"source,":[86],"well":[88],"enhancing":[90],"quality":[91],"service":[92],"greatest":[94],"public":[95],"benefits":[96],"sustainable":[98],"development.":[99],"addition,":[101],"initiation":[103],"management":[106],"addressed.":[110],"will":[114],"apply":[115],"technology":[118],"using":[119],"Solar":[120,141],"PV,":[121],"Energy":[122,128],"Storage":[123],"System":[124,130],"(ESS)":[125],"by":[126],"Management":[129],"control":[132],"flow":[135],"from":[136],"main":[138],"grid":[139],"PV":[142],"ESS":[145],"loads.":[147]},"counts_by_year":[{"year":2021,"cited_by_count":1},{"year":2016,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
