{"id":"https://openalex.org/W2162684067","doi":"https://doi.org/10.1109/iros.2004.1389719","title":"Development of coordinated scheduling strategy with end-to-end response time analysis for the CAN-based distributed control systems","display_name":"Development of coordinated scheduling strategy with end-to-end response time analysis for the CAN-based distributed control systems","publication_year":2005,"publication_date":"2005-04-01","ids":{"openalex":"https://openalex.org/W2162684067","doi":"https://doi.org/10.1109/iros.2004.1389719","mag":"2162684067"},"language":"en","primary_location":{"id":"doi:10.1109/iros.2004.1389719","is_oa":false,"landing_page_url":"https://doi.org/10.1109/iros.2004.1389719","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2004 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS) (IEEE Cat. No.04CH37566)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5109101069","display_name":"H.J. Kim","orcid":null},"institutions":[{"id":"https://openalex.org/I89004649","display_name":"Korea Institute of Industrial Technology","ror":"https://ror.org/04qfph657","country_code":"KR","type":"other","lineage":["https://openalex.org/I2801339556","https://openalex.org/I4210144908","https://openalex.org/I4387152098","https://openalex.org/I89004649"]},{"id":"https://openalex.org/I89440247","display_name":"Myongji University","ror":"https://ror.org/00s9dpb54","country_code":"KR","type":"education","lineage":["https://openalex.org/I89440247"]}],"countries":["KR"],"is_corresponding":true,"raw_author_name":"Hongrycol Kim","raw_affiliation_strings":["Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea","Dept. of Inf. Control Eng., Myongji Univ., Kyongki, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","institution_ids":["https://openalex.org/I89440247"]},{"raw_affiliation_string":"Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea","institution_ids":["https://openalex.org/I89004649"]},{"raw_affiliation_string":"Dept. of Inf. Control Eng., Myongji Univ., Kyongki, South Korea","institution_ids":["https://openalex.org/I89440247"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5084824606","display_name":"Joomin Kim","orcid":null},"institutions":[{"id":"https://openalex.org/I89440247","display_name":"Myongji University","ror":"https://ror.org/00s9dpb54","country_code":"KR","type":"education","lineage":["https://openalex.org/I89440247"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Joomin Kim","raw_affiliation_strings":["Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","institution_ids":["https://openalex.org/I89440247"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100650947","display_name":"Daewon Kim","orcid":"https://orcid.org/0000-0003-1246-5035"},"institutions":[{"id":"https://openalex.org/I89440247","display_name":"Myongji University","ror":"https://ror.org/00s9dpb54","country_code":"KR","type":"education","lineage":["https://openalex.org/I89440247"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Daewon Kim","raw_affiliation_strings":["Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","institution_ids":["https://openalex.org/I89440247"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5049420521","display_name":"Hongseok Kim","orcid":"https://orcid.org/0000-0002-5744-2358"},"institutions":[{"id":"https://openalex.org/I89440247","display_name":"Myongji University","ror":"https://ror.org/00s9dpb54","country_code":"KR","type":"education","lineage":["https://openalex.org/I89440247"]},{"id":"https://openalex.org/I89004649","display_name":"Korea Institute of Industrial Technology","ror":"https://ror.org/04qfph657","country_code":"KR","type":"other","lineage":["https://openalex.org/I2801339556","https://openalex.org/I4210144908","https://openalex.org/I4387152098","https://openalex.org/I89004649"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Hongseok Kim","raw_affiliation_strings":["Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea"],"affiliations":[{"raw_affiliation_string":"Department of Information Control Engineering, Myongji University, Yongin si, Kyunggi, South Korea","institution_ids":["https://openalex.org/I89440247"]},{"raw_affiliation_string":"Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea","institution_ids":["https://openalex.org/I89004649"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5023123074","display_name":"Ho\u2010Gil Lee","orcid":null},"institutions":[{"id":"https://openalex.org/I89004649","display_name":"Korea Institute of Industrial Technology","ror":"https://ror.org/04qfph657","country_code":"KR","type":"other","lineage":["https://openalex.org/I2801339556","https://openalex.org/I4210144908","https://openalex.org/I4387152098","https://openalex.org/I89004649"]}],"countries":["KR"],"is_corresponding":false,"raw_author_name":"Hogil Lee","raw_affiliation_strings":["Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea"],"affiliations":[{"raw_affiliation_string":"Korea Institute of Industrial Technology, Mechatronics Team, Cheonan, Chungcheongnam, South Korea","institution_ids":["https://openalex.org/I89004649"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":5,"corresponding_author_ids":["https://openalex.org/A5109101069"],"corresponding_institution_ids":["https://openalex.org/I89004649","https://openalex.org/I89440247"],"apc_list":null,"apc_paid":null,"fwci":0.5156,"has_fulltext":false,"cited_by_count":6,"citation_normalized_percentile":{"value":0.70280612,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":94},"biblio":{"volume":"3","issue":null,"first_page":"2099","last_page":"2104"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10933","display_name":"Real-Time Systems Scheduling","score":0.9990000128746033,"subfield":{"id":"https://openalex.org/subfields/1708","display_name":"Hardware and Architecture"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10933","display_name":"Real-Time Systems Scheduling","score":0.9990000128746033,"subfield":{"id":"https://openalex.org/subfields/1708","display_name":"Hardware and Architecture"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11125","display_name":"Petri Nets in System Modeling","score":0.9914000034332275,"subfield":{"id":"https://openalex.org/subfields/1703","display_name":"Computational Theory and Mathematics"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10715","display_name":"Distributed and Parallel Computing Systems","score":0.9790999889373779,"subfield":{"id":"https://openalex.org/subfields/1705","display_name":"Computer Networks and Communications"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.7928736209869385},{"id":"https://openalex.org/keywords/response-time","display_name":"Response time","score":0.6574379205703735},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6475231051445007},{"id":"https://openalex.org/keywords/asynchronous-communication","display_name":"Asynchronous communication","score":0.6328429579734802},{"id":"https://openalex.org/keywords/distributed-computing","display_name":"Distributed computing","score":0.6125407814979553},{"id":"https://openalex.org/keywords/fixed-priority-pre-emptive-scheduling","display_name":"Fixed-priority pre-emptive scheduling","score":0.5961518883705139},{"id":"https://openalex.org/keywords/earliest-deadline-first-scheduling","display_name":"Earliest deadline first scheduling","score":0.5878911018371582},{"id":"https://openalex.org/keywords/dynamic-priority-scheduling","display_name":"Dynamic priority scheduling","score":0.5868951678276062},{"id":"https://openalex.org/keywords/fair-share-scheduling","display_name":"Fair-share scheduling","score":0.5627894997596741},{"id":"https://openalex.org/keywords/round-robin-scheduling","display_name":"Round-robin scheduling","score":0.5306628942489624},{"id":"https://openalex.org/keywords/rate-monotonic-scheduling","display_name":"Rate-monotonic scheduling","score":0.5227351784706116},{"id":"https://openalex.org/keywords/two-level-scheduling","display_name":"Two-level scheduling","score":0.5218595266342163},{"id":"https://openalex.org/keywords/deadline-monotonic-scheduling","display_name":"Deadline-monotonic scheduling","score":0.4339739680290222},{"id":"https://openalex.org/keywords/real-time-computing","display_name":"Real-time computing","score":0.4325188398361206},{"id":"https://openalex.org/keywords/end-to-end-principle","display_name":"End-to-end principle","score":0.4267916679382324},{"id":"https://openalex.org/keywords/computer-network","display_name":"Computer network","score":0.283661425113678},{"id":"https://openalex.org/keywords/quality-of-service","display_name":"Quality of service","score":0.11982282996177673},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.10966861248016357},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.0909034013748169}],"concepts":[{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.7928736209869385},{"id":"https://openalex.org/C19012869","wikidata":"https://www.wikidata.org/wiki/Q578372","display_name":"Response time","level":2,"score":0.6574379205703735},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6475231051445007},{"id":"https://openalex.org/C151319957","wikidata":"https://www.wikidata.org/wiki/Q752739","display_name":"Asynchronous communication","level":2,"score":0.6328429579734802},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.6125407814979553},{"id":"https://openalex.org/C122141398","wikidata":"https://www.wikidata.org/wiki/Q5456330","display_name":"Fixed-priority pre-emptive scheduling","level":5,"score":0.5961518883705139},{"id":"https://openalex.org/C32310161","wikidata":"https://www.wikidata.org/wiki/Q666365","display_name":"Earliest deadline first scheduling","level":5,"score":0.5878911018371582},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.5868951678276062},{"id":"https://openalex.org/C31689143","wikidata":"https://www.wikidata.org/wiki/Q733809","display_name":"Fair-share scheduling","level":3,"score":0.5627894997596741},{"id":"https://openalex.org/C175893541","wikidata":"https://www.wikidata.org/wiki/Q1196582","display_name":"Round-robin scheduling","level":4,"score":0.5306628942489624},{"id":"https://openalex.org/C127456818","wikidata":"https://www.wikidata.org/wiki/Q238879","display_name":"Rate-monotonic scheduling","level":4,"score":0.5227351784706116},{"id":"https://openalex.org/C119948110","wikidata":"https://www.wikidata.org/wiki/Q7858726","display_name":"Two-level scheduling","level":4,"score":0.5218595266342163},{"id":"https://openalex.org/C76774629","wikidata":"https://www.wikidata.org/wiki/Q1146103","display_name":"Deadline-monotonic scheduling","level":5,"score":0.4339739680290222},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.4325188398361206},{"id":"https://openalex.org/C74296488","wikidata":"https://www.wikidata.org/wiki/Q2527392","display_name":"End-to-end principle","level":2,"score":0.4267916679382324},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.283661425113678},{"id":"https://openalex.org/C5119721","wikidata":"https://www.wikidata.org/wiki/Q220501","display_name":"Quality of service","level":2,"score":0.11982282996177673},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.10966861248016357},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0909034013748169},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/iros.2004.1389719","is_oa":false,"landing_page_url":"https://doi.org/10.1109/iros.2004.1389719","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2004 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS) (IEEE Cat. No.04CH37566)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":15,"referenced_works":["https://openalex.org/W1484610889","https://openalex.org/W1801704802","https://openalex.org/W2014608904","https://openalex.org/W2040692426","https://openalex.org/W2100725016","https://openalex.org/W2116160603","https://openalex.org/W2145725108","https://openalex.org/W2206464522","https://openalex.org/W2405004335","https://openalex.org/W3200688358","https://openalex.org/W6628810893","https://openalex.org/W6638451115","https://openalex.org/W6660451871","https://openalex.org/W6674975210","https://openalex.org/W6688284625"],"related_works":["https://openalex.org/W4300092030","https://openalex.org/W2912206708","https://openalex.org/W1935185185","https://openalex.org/W2167574351","https://openalex.org/W2377321505","https://openalex.org/W1545991362","https://openalex.org/W2184166483","https://openalex.org/W2393789493","https://openalex.org/W2545511463","https://openalex.org/W3184267879"],"abstract_inverted_index":{"In":[0,117],"this":[1],"paper,":[2],"a":[3,163],"coordinated":[4,86,151,168,176],"scheduling":[5,60,87,152,169,177],"strategy":[6,88,111,153,170],"is":[7,39,52,89,112,154],"proposed":[8,113,167],"to":[9],"reduce":[10],"end-to-end":[11,32,49],"response":[12,33,50,55,65],"time":[13,34,51,56,66],"in":[14,35,57,67],"distributed":[15],"control":[16],"systems":[17,80,103],"based":[18],"on":[19,91],"the":[20,26,28,36,62,68,78,82,92,95,115,118,127,130,144,150,166,172,175],"CAN":[21,69,83],"(controller":[22],"area":[23],"network).":[24],"For":[25],"strategy,":[27,119],"analysis":[29],"of":[30,54,61,94,129],"practical":[31],"worst":[37],"case":[38],"performed":[40],"priory":[41],"with":[42,140,149,165],"considering":[43],"real-time":[44,58],"multi-task":[45,59],"operating":[46,63,79,102],"systems.":[47],"The":[48,85,146],"composed":[53],"systems,":[64],"communications,":[70],"and":[71,81,104,126,171],"delay":[72,96],"caused":[73,97],"by":[74,98,159],"asynchronous":[75,99],"timing":[76,100],"between":[77,101,162],"communications.":[84,106],"focused":[90],"reduction":[93],"network":[105],"An":[107],"online":[108,141],"deadline":[109],"assignment":[110],"for":[114,143],"coordination.":[116,145],"periods":[120],"are":[121,135],"defined":[122,136],"as":[123,137],"hard":[124],"deadlines,":[125],"deadlines":[128,139],"DMS":[131],"(deadline":[132],"monotonic":[133],"scheduling)":[134],"soft":[138],"assignments":[142],"performance":[147,160],"enhancement":[148],"validated":[155],"through":[156],"simulation":[157],"tests,":[158],"comparison":[161],"system":[164,173],"without":[174],"strategy.":[178]},"counts_by_year":[{"year":2016,"cited_by_count":1},{"year":2015,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
