{"id":"https://openalex.org/W4407129288","doi":"https://doi.org/10.1109/ieem62345.2024.10857148","title":"Optimizing Manufacturing Processes through the Integration of Dynamic Job Shop Scheduling and Maintenance Planning","display_name":"Optimizing Manufacturing Processes through the Integration of Dynamic Job Shop Scheduling and Maintenance Planning","publication_year":2024,"publication_date":"2024-12-15","ids":{"openalex":"https://openalex.org/W4407129288","doi":"https://doi.org/10.1109/ieem62345.2024.10857148"},"language":"en","primary_location":{"id":"doi:10.1109/ieem62345.2024.10857148","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem62345.2024.10857148","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5116144319","display_name":"Fauzi","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Fauzi","raw_affiliation_strings":[],"affiliations":[]},{"author_position":"middle","author":{"id":"https://openalex.org/A5040974464","display_name":"Rifqi Rifqi","orcid":null},"institutions":[{"id":"https://openalex.org/I165230279","display_name":"Universitas Gadjah Mada","ror":"https://ror.org/03ke6d638","country_code":"ID","type":"education","lineage":["https://openalex.org/I165230279"]}],"countries":["ID"],"is_corresponding":false,"raw_author_name":"Rifqi","raw_affiliation_strings":["Universitas Gadjah Mada,Department of Mechanical and Industrial Engineering,Sleman,Indonesia"],"affiliations":[{"raw_affiliation_string":"Universitas Gadjah Mada,Department of Mechanical and Industrial Engineering,Sleman,Indonesia","institution_ids":["https://openalex.org/I165230279"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5116144320","display_name":"Masruroh","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Masruroh","raw_affiliation_strings":[],"affiliations":[]},{"author_position":"last","author":{"id":"https://openalex.org/A5101773271","display_name":"Nur Aini","orcid":"https://orcid.org/0000-0003-3976-406X"},"institutions":[{"id":"https://openalex.org/I165230279","display_name":"Universitas Gadjah Mada","ror":"https://ror.org/03ke6d638","country_code":"ID","type":"education","lineage":["https://openalex.org/I165230279"]}],"countries":["ID"],"is_corresponding":false,"raw_author_name":"Nur Aini","raw_affiliation_strings":["Universitas Gadjah Mada,Department of Mechanical and Industrial Engineering,Sleman,Indonesia"],"affiliations":[{"raw_affiliation_string":"Universitas Gadjah Mada,Department of Mechanical and Industrial Engineering,Sleman,Indonesia","institution_ids":["https://openalex.org/I165230279"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":4,"corresponding_author_ids":["https://openalex.org/A5116144319"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.40076628,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"723","last_page":"727"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.979200005531311,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.979200005531311,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9682999849319458,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9666000008583069,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.587176501750946},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.5573300719261169},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.5417239665985107},{"id":"https://openalex.org/keywords/dynamic-priority-scheduling","display_name":"Dynamic priority scheduling","score":0.4989635944366455},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.42077553272247314},{"id":"https://openalex.org/keywords/job-shop","display_name":"Job shop","score":0.41751453280448914},{"id":"https://openalex.org/keywords/flow-shop-scheduling","display_name":"Flow shop scheduling","score":0.4122549295425415},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.3665385842323303},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.1968640387058258},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.17032921314239502},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.10754221677780151},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.07770711183547974}],"concepts":[{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.587176501750946},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.5573300719261169},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.5417239665985107},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.4989635944366455},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.42077553272247314},{"id":"https://openalex.org/C2777243215","wikidata":"https://www.wikidata.org/wiki/Q1493226","display_name":"Job shop","level":5,"score":0.41751453280448914},{"id":"https://openalex.org/C158336966","wikidata":"https://www.wikidata.org/wiki/Q3074426","display_name":"Flow shop scheduling","level":4,"score":0.4122549295425415},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.3665385842323303},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.1968640387058258},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.17032921314239502},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.10754221677780151},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.07770711183547974}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ieem62345.2024.10857148","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem62345.2024.10857148","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.7200000286102295,"display_name":"Decent work and economic growth","id":"https://metadata.un.org/sdg/8"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":13,"referenced_works":["https://openalex.org/W2076785727","https://openalex.org/W2941722570","https://openalex.org/W3006646737","https://openalex.org/W3152192037","https://openalex.org/W4214875184","https://openalex.org/W4283316183","https://openalex.org/W4366830122","https://openalex.org/W4377097745","https://openalex.org/W4383752013","https://openalex.org/W4389794392","https://openalex.org/W4390578079","https://openalex.org/W4398149107","https://openalex.org/W6809879188"],"related_works":["https://openalex.org/W2967782293","https://openalex.org/W2185192838","https://openalex.org/W2069961172","https://openalex.org/W2955323683","https://openalex.org/W1564838499","https://openalex.org/W2559484340","https://openalex.org/W2146297781","https://openalex.org/W2612484291","https://openalex.org/W3109838862","https://openalex.org/W2022848409"],"abstract_inverted_index":{"This":[0,120],"study":[1],"integrates":[2],"the":[3,24,81,88,130],"Dynamic":[4],"Job":[5],"Shop":[6],"Scheduling":[7],"Problem":[8],"(DJSSP)":[9],"with":[10],"maintenance":[11,101,145],"planning":[12],"to":[13,57,80,95,116],"optimize":[14],"manufacturing":[15],"processes.":[16],"The":[17,134],"model":[18,90],"minimizes":[19],"makespan":[20,36,59,84],"while":[21],"accounting":[22],"for":[23,112,132],"uncertainty":[25],"of":[26,37,43,60,70,85],"job":[27],"arrivals":[28],"and":[29,40,67,125],"machine":[30,123],"maintenance.":[31],"Analysis":[32],"revealed":[33],"a":[34,41,52,58,68],"minimum":[35],"753.31":[38],"hours":[39,50,66,77],"tardiness":[42,69],"$\\mathbf{1":[44,71],"3":[45,64],"9":[46],"1.":[47],"4":[48,75],"2}$":[49],"before":[51],"new":[53],"job,":[54],"which":[55],"increased":[56],"$\\mathbf{8":[61],"1":[62],"3.":[63],"1}$":[65],"6":[72],"8":[73,97],"9.":[74],"4}$":[76],"afterward.":[78],"Compared":[79],"existing":[82,140],"estimation":[83],"835.81":[86],"hours,":[87],"proposed":[89],"shows":[91],"significant":[92,137],"improvement":[93],"up":[94],"$\\mathbf{9.":[96],"\\%}$.":[98],"Optimal":[99],"preventive":[100],"intervals,":[102],"based":[103],"on":[104],"minimizing":[105],"Total":[106],"Expected":[107],"Maintenance":[108],"Cost":[109],"(TEMC),":[110],"varied":[111],"each":[113],"component":[114],"due":[115],"their":[117],"non-identical":[118],"component.":[119],"approach":[121],"enhances":[122],"reliability":[124],"extends":[126],"equipment":[127],"life,":[128],"delaying":[129],"need":[131],"replacements.":[133],"results":[135],"demonstrate":[136],"improvements":[138],"over":[139],"methods":[141],"that":[142],"use":[143],"unplanned":[144],"schedule.":[146]},"counts_by_year":[],"updated_date":"2025-12-22T23:10:17.713674","created_date":"2025-10-10T00:00:00"}
