{"id":"https://openalex.org/W4391422428","doi":"https://doi.org/10.1109/ieem58616.2023.10406642","title":"An Integrated Production Parameters Decision on Multi-Stage Sequential Manufacturing Through Experimental Design and Mathematical Programming","display_name":"An Integrated Production Parameters Decision on Multi-Stage Sequential Manufacturing Through Experimental Design and Mathematical Programming","publication_year":2023,"publication_date":"2023-12-18","ids":{"openalex":"https://openalex.org/W4391422428","doi":"https://doi.org/10.1109/ieem58616.2023.10406642"},"language":"en","primary_location":{"id":"doi:10.1109/ieem58616.2023.10406642","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ieem58616.2023.10406642","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5074513242","display_name":"Angus Jeang","orcid":"https://orcid.org/0000-0003-4473-245X"},"institutions":[{"id":"https://openalex.org/I4880106","display_name":"Feng Chia University","ror":"https://ror.org/05vhczg54","country_code":"TW","type":"education","lineage":["https://openalex.org/I4880106"]}],"countries":["TW"],"is_corresponding":true,"raw_author_name":"A. Jeang","raw_affiliation_strings":["Feng Chia University,Department of Industrial Engineering and Systems Management,Taiwan","Department of Industrial Engineering and Systems Management, Feng Chia University, Taiwan"],"affiliations":[{"raw_affiliation_string":"Feng Chia University,Department of Industrial Engineering and Systems Management,Taiwan","institution_ids":["https://openalex.org/I4880106"]},{"raw_affiliation_string":"Department of Industrial Engineering and Systems Management, Feng Chia University, Taiwan","institution_ids":["https://openalex.org/I4880106"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5101493275","display_name":"Chien-Ping Chung","orcid":null},"institutions":[{"id":"https://openalex.org/I131948415","display_name":"National Taichung University of Science and Technology","ror":"https://ror.org/05bgcav40","country_code":"TW","type":"education","lineage":["https://openalex.org/I131948415"]}],"countries":["TW"],"is_corresponding":false,"raw_author_name":"C. P. Chung","raw_affiliation_strings":["National Taichung University of Science and Technology,Department of Intelligent Production Engineering,Taiwan","Department of Intelligent Production Engineering, National Taichung University of Science and Technology, Taiwan"],"affiliations":[{"raw_affiliation_string":"National Taichung University of Science and Technology,Department of Intelligent Production Engineering,Taiwan","institution_ids":["https://openalex.org/I131948415"]},{"raw_affiliation_string":"Department of Intelligent Production Engineering, National Taichung University of Science and Technology, Taiwan","institution_ids":["https://openalex.org/I131948415"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5074513242"],"corresponding_institution_ids":["https://openalex.org/I4880106"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.34556801,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"46","issue":null,"first_page":"0225","last_page":"0229"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9857000112533569,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9857000112533569,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9430999755859375,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T13197","display_name":"Spreadsheets and End-User Computing","score":0.9398000240325928,"subfield":{"id":"https://openalex.org/subfields/1712","display_name":"Software"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.7261446118354797},{"id":"https://openalex.org/keywords/process","display_name":"Process (computing)","score":0.6452727317810059},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6404432654380798},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.4891803562641144},{"id":"https://openalex.org/keywords/idle","display_name":"Idle","score":0.4837508201599121},{"id":"https://openalex.org/keywords/process-integration","display_name":"Process integration","score":0.47737357020378113},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.45790553092956543},{"id":"https://openalex.org/keywords/process-design","display_name":"Process design","score":0.4418308138847351},{"id":"https://openalex.org/keywords/production-planning","display_name":"Production planning","score":0.41432225704193115},{"id":"https://openalex.org/keywords/process-engineering","display_name":"Process engineering","score":0.40038642287254333},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.3994661569595337},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.361236035823822},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.24440544843673706},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.08013057708740234}],"concepts":[{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.7261446118354797},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.6452727317810059},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6404432654380798},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.4891803562641144},{"id":"https://openalex.org/C16320812","wikidata":"https://www.wikidata.org/wiki/Q1812200","display_name":"Idle","level":2,"score":0.4837508201599121},{"id":"https://openalex.org/C54725748","wikidata":"https://www.wikidata.org/wiki/Q7247277","display_name":"Process integration","level":2,"score":0.47737357020378113},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.45790553092956543},{"id":"https://openalex.org/C55396564","wikidata":"https://www.wikidata.org/wiki/Q3084971","display_name":"Process design","level":3,"score":0.4418308138847351},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.41432225704193115},{"id":"https://openalex.org/C21880701","wikidata":"https://www.wikidata.org/wiki/Q2144042","display_name":"Process engineering","level":1,"score":0.40038642287254333},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.3994661569595337},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.361236035823822},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.24440544843673706},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.08013057708740234},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ieem58616.2023.10406642","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/ieem58616.2023.10406642","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.47999998927116394,"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":12,"referenced_works":["https://openalex.org/W159436435","https://openalex.org/W1988725147","https://openalex.org/W2091370793","https://openalex.org/W2127861000","https://openalex.org/W2793685908","https://openalex.org/W2797233731","https://openalex.org/W2900206564","https://openalex.org/W3004900674","https://openalex.org/W3186530598","https://openalex.org/W3203849619","https://openalex.org/W4281938685","https://openalex.org/W6750922287"],"related_works":["https://openalex.org/W4310559326","https://openalex.org/W2885718090","https://openalex.org/W1550691622","https://openalex.org/W4378839705","https://openalex.org/W2532058913","https://openalex.org/W2135012663","https://openalex.org/W2093688830","https://openalex.org/W2088822619","https://openalex.org/W2746170211","https://openalex.org/W4245874871"],"abstract_inverted_index":{"This":[0],"study":[1],"focuses":[2],"on":[3,44],"optimizing":[4],"production":[5,55,98,102],"parameters":[6],"within":[7],"a":[8,71,114],"multi-stage":[9,128],"sequential":[10,129],"manufacturing":[11,130],"system":[12],"for":[13,132],"the":[14,31,64,93,106,123],"rayon":[15],"fiber":[16],"coagulating":[17],"bath":[18],"recycle":[19],"process.":[20],"It":[21],"employs":[22],"experimental":[23,79],"design":[24],"and":[25,33,53,67,83,88,118,135],"mathematical":[26],"programming":[27],"techniques":[28],"to":[29,58],"address":[30],"interdependence":[32],"interactions":[34],"among":[35],"these":[36],"stages.":[37],"Unlike":[38],"previous":[39],"approaches":[40],"that":[41],"solely":[42],"concentrated":[43],"single":[45],"process":[46,82,131],"optimization,":[47],"often":[48],"resulting":[49],"in":[50],"suboptimal":[51],"designs":[52],"increased":[54],"costs":[56,99],"due":[57],"idle":[59],"time,":[60],"our":[61,109,119],"approach":[62],"integrates":[63],"filtering,":[65],"evaporating,":[66],"crystallizing":[68],"processes":[69],"as":[70],"cohesive":[72],"system.":[73],"The":[74],"objective":[75],"function,":[76],"derived":[77],"from":[78],"design,":[80],"considers":[81],"equipment":[84],"limitations,":[85],"input-output":[86],"balance,":[87,91],"heat":[89],"energy":[90],"with":[92],"overarching":[94],"aim":[95],"of":[96,108,126],"minimizing":[97],"while":[100],"meeting":[101],"constraints.":[103],"To":[104],"underscore":[105],"significance":[107],"integrated":[110],"approach,":[111,121],"we":[112],"provide":[113],"comparison":[115],"between":[116],"non-integration":[117],"present":[120],"highlighting":[122],"crucial":[124],"importance":[125],"this":[127],"enhanced":[133],"efficiency":[134],"cost-effectiveness.":[136]},"counts_by_year":[],"updated_date":"2025-12-25T23:11:45.687758","created_date":"2025-10-10T00:00:00"}
