{"id":"https://openalex.org/W4312198923","doi":"https://doi.org/10.1109/ieem55944.2022.9989966","title":"Integrated Scheduling of Production and Material Delivery in a Make-to-order Flow Shop","display_name":"Integrated Scheduling of Production and Material Delivery in a Make-to-order Flow Shop","publication_year":2022,"publication_date":"2022-12-07","ids":{"openalex":"https://openalex.org/W4312198923","doi":"https://doi.org/10.1109/ieem55944.2022.9989966"},"language":"en","primary_location":{"id":"doi:10.1109/ieem55944.2022.9989966","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem55944.2022.9989966","pdf_url":null,"source":{"id":"https://openalex.org/S4363607849","display_name":"2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5015105063","display_name":"Tianning Liang","orcid":null},"institutions":[{"id":"https://openalex.org/I183067930","display_name":"Shanghai Jiao Tong University","ror":"https://ror.org/0220qvk04","country_code":"CN","type":"education","lineage":["https://openalex.org/I183067930"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Tianning Liang","raw_affiliation_strings":["Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China"],"affiliations":[{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5102792943","display_name":"Liping Zhou","orcid":"https://orcid.org/0000-0003-2669-0006"},"institutions":[{"id":"https://openalex.org/I183067930","display_name":"Shanghai Jiao Tong University","ror":"https://ror.org/0220qvk04","country_code":"CN","type":"education","lineage":["https://openalex.org/I183067930"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Liping Zhou","raw_affiliation_strings":["Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","Data-Driven Management Decision Making Lab, Shanghai Jiao Tong University, Shanghai, China","Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China"],"affiliations":[{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Data-Driven Management Decision Making Lab, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5011681810","display_name":"Zhibin Jiang","orcid":"https://orcid.org/0000-0002-9241-0212"},"institutions":[{"id":"https://openalex.org/I183067930","display_name":"Shanghai Jiao Tong University","ror":"https://ror.org/0220qvk04","country_code":"CN","type":"education","lineage":["https://openalex.org/I183067930"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Zhibin Jiang","raw_affiliation_strings":["Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","Data-Driven Management Decision Making Lab, Shanghai Jiao Tong University, Shanghai, China","Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China","Antai College of Economics and Management, Shanghai Jiao Tong University, Shanghai, China"],"affiliations":[{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University,Shanghai,China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Data-Driven Management Decision Making Lab, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Sino-US Global Logistics Institute, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]},{"raw_affiliation_string":"Antai College of Economics and Management, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":3,"corresponding_author_ids":["https://openalex.org/A5015105063"],"corresponding_institution_ids":["https://openalex.org/I183067930"],"apc_list":null,"apc_paid":null,"fwci":1.7338,"has_fulltext":false,"cited_by_count":5,"citation_normalized_percentile":{"value":0.84687176,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":95,"max":97},"biblio":{"volume":null,"issue":null,"first_page":"1422","last_page":"1426"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":1.0,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9965999722480774,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/mass-customization","display_name":"Mass customization","score":0.7609812617301941},{"id":"https://openalex.org/keywords/workstation","display_name":"Workstation","score":0.6783385872840881},{"id":"https://openalex.org/keywords/material-flow","display_name":"Material flow","score":0.6286109089851379},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6222622990608215},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6123379468917847},{"id":"https://openalex.org/keywords/flow-shop-scheduling","display_name":"Flow shop scheduling","score":0.5888621211051941},{"id":"https://openalex.org/keywords/material-requirements-planning","display_name":"Material requirements planning","score":0.5206250548362732},{"id":"https://openalex.org/keywords/time-horizon","display_name":"Time horizon","score":0.5158318877220154},{"id":"https://openalex.org/keywords/build-to-order","display_name":"Build to order","score":0.513587474822998},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.5056369304656982},{"id":"https://openalex.org/keywords/batch-production","display_name":"Batch production","score":0.49631887674331665},{"id":"https://openalex.org/keywords/personalization","display_name":"Personalization","score":0.46569857001304626},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.44828709959983826},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.3910784125328064},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.3841993808746338},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.22818857431411743},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.15985560417175293},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.1397016942501068},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.11863544583320618},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.08920595049858093},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.07762229442596436}],"concepts":[{"id":"https://openalex.org/C72414096","wikidata":"https://www.wikidata.org/wiki/Q1367461","display_name":"Mass customization","level":3,"score":0.7609812617301941},{"id":"https://openalex.org/C67953723","wikidata":"https://www.wikidata.org/wiki/Q192525","display_name":"Workstation","level":2,"score":0.6783385872840881},{"id":"https://openalex.org/C183906286","wikidata":"https://www.wikidata.org/wiki/Q4284762","display_name":"Material flow","level":2,"score":0.6286109089851379},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6222622990608215},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6123379468917847},{"id":"https://openalex.org/C158336966","wikidata":"https://www.wikidata.org/wiki/Q3074426","display_name":"Flow shop scheduling","level":4,"score":0.5888621211051941},{"id":"https://openalex.org/C167523981","wikidata":"https://www.wikidata.org/wiki/Q1365335","display_name":"Material requirements planning","level":3,"score":0.5206250548362732},{"id":"https://openalex.org/C28761237","wikidata":"https://www.wikidata.org/wiki/Q7805321","display_name":"Time horizon","level":2,"score":0.5158318877220154},{"id":"https://openalex.org/C142000545","wikidata":"https://www.wikidata.org/wiki/Q1003004","display_name":"Build to order","level":3,"score":0.513587474822998},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.5056369304656982},{"id":"https://openalex.org/C2776043813","wikidata":"https://www.wikidata.org/wiki/Q1759113","display_name":"Batch production","level":2,"score":0.49631887674331665},{"id":"https://openalex.org/C183003079","wikidata":"https://www.wikidata.org/wiki/Q1000371","display_name":"Personalization","level":2,"score":0.46569857001304626},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.44828709959983826},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.3910784125328064},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.3841993808746338},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.22818857431411743},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.15985560417175293},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.1397016942501068},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.11863544583320618},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.08920595049858093},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.07762229442596436},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C18903297","wikidata":"https://www.wikidata.org/wiki/Q7150","display_name":"Ecology","level":1,"score":0.0},{"id":"https://openalex.org/C136764020","wikidata":"https://www.wikidata.org/wiki/Q466","display_name":"World Wide Web","level":1,"score":0.0},{"id":"https://openalex.org/C86803240","wikidata":"https://www.wikidata.org/wiki/Q420","display_name":"Biology","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ieem55944.2022.9989966","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem55944.2022.9989966","pdf_url":null,"source":{"id":"https://openalex.org/S4363607849","display_name":"2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2022 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.6100000143051147,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":13,"referenced_works":["https://openalex.org/W1965605059","https://openalex.org/W1987635525","https://openalex.org/W2024085737","https://openalex.org/W2025819959","https://openalex.org/W2046678043","https://openalex.org/W2726914775","https://openalex.org/W2782230350","https://openalex.org/W2905418984","https://openalex.org/W2919774221","https://openalex.org/W3193438168","https://openalex.org/W3208964875","https://openalex.org/W3215999497","https://openalex.org/W6747087213"],"related_works":["https://openalex.org/W2529934805","https://openalex.org/W2500469198","https://openalex.org/W2080388201","https://openalex.org/W2369211088","https://openalex.org/W2370653714","https://openalex.org/W1830302991","https://openalex.org/W2007221344","https://openalex.org/W1526401839","https://openalex.org/W1971164915","https://openalex.org/W3217139527"],"abstract_inverted_index":{"With":[0],"the":[1,46,50,57,80,101,104,129,134,143],"growing":[2],"demand":[3],"for":[4,56,65],"customization,":[5],"many":[6],"industries":[7],"are":[8,139],"changing":[9],"from":[10],"inventory-oriented":[11],"mass":[12],"production":[13,31,40,58,69,84,105,131],"to":[14,17,38,67,127,141],"make-to-order":[15],"strategies":[16],"meet":[18,45],"multi-variety":[19,60],"and":[20,33,41,70,85,111,118],"small-batch":[21],"demands.":[22],"Manufacturers":[23],"build":[24],"intelligent":[25],"flexible":[26],"flow":[27,51],"shops":[28],"using":[29],"automated":[30,34],"equipment":[32],"guided":[35],"vehicles":[36],"(AGVs)":[37],"organize":[39],"material":[42,71,86,113],"delivery.":[43],"To":[44],"fast":[47],"takt":[48],"of":[49,59,83,103,106,109,145],"shop":[52],"with":[53,73,93,153],"multiple":[54],"workstations":[55],"orders,":[61],"it":[62],"is":[63,125],"critical":[64],"manufacturers":[66],"coordinate":[68],"delivery":[72,87],"limited":[74],"AGV":[75],"resources.":[76],"This":[77],"paper":[78],"studies":[79],"integrated":[81,148],"scheduling":[82,149,156],"problem":[88],"motivated":[89],"by":[90,99,115,151],"our":[91,146],"collaboration":[92],"an":[94],"air":[95],"conditioning":[96],"compressor":[97],"manufacturer":[98],"considering":[100],"features":[102],"various":[107],"types":[108],"products":[110,117],"heterogeneous":[112],"requirements":[114],"different":[116],"workstations.":[119],"A":[120],"mixed-integer":[121],"linear":[122],"programming":[123],"model":[124],"proposed":[126,147],"minimize":[128],"total":[130],"delay":[132],"in":[133],"planning":[135],"horizon.":[136],"Numerical":[137],"experiments":[138],"performed":[140],"demonstrate":[142],"effectiveness":[144],"method":[150],"comparing":[152],"two":[154],"separate":[155],"methods.":[157]},"counts_by_year":[{"year":2025,"cited_by_count":2},{"year":2024,"cited_by_count":3}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
