{"id":"https://openalex.org/W2909450954","doi":"https://doi.org/10.1109/ieem.2018.8607602","title":"ACO-based Parallel Machine Scheduling Considering Both Setup Time and Run-based Preventive Maintenance with Reliability Constraints","display_name":"ACO-based Parallel Machine Scheduling Considering Both Setup Time and Run-based Preventive Maintenance with Reliability Constraints","publication_year":2018,"publication_date":"2018-12-01","ids":{"openalex":"https://openalex.org/W2909450954","doi":"https://doi.org/10.1109/ieem.2018.8607602","mag":"2909450954"},"language":"en","primary_location":{"id":"doi:10.1109/ieem.2018.8607602","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem.2018.8607602","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5100460986","display_name":"Siqi Chen","orcid":"https://orcid.org/0009-0002-5008-7522"},"institutions":[{"id":"https://openalex.org/I183067930","display_name":"Shanghai Jiao Tong University","ror":"https://ror.org/0220qvk04","country_code":"CN","type":"education","lineage":["https://openalex.org/I183067930"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Siqi Chen","raw_affiliation_strings":["School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai, China"],"affiliations":[{"raw_affiliation_string":"School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5100407768","display_name":"Liya Wang","orcid":"https://orcid.org/0000-0001-6622-1437"},"institutions":[{"id":"https://openalex.org/I183067930","display_name":"Shanghai Jiao Tong University","ror":"https://ror.org/0220qvk04","country_code":"CN","type":"education","lineage":["https://openalex.org/I183067930"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Liya Wang","raw_affiliation_strings":["School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai, China"],"affiliations":[{"raw_affiliation_string":"School of Mechanical Engineering, Shanghai Jiao Tong University, Shanghai, China","institution_ids":["https://openalex.org/I183067930"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5100460986"],"corresponding_institution_ids":["https://openalex.org/I183067930"],"apc_list":null,"apc_paid":null,"fwci":0.4927,"has_fulltext":false,"cited_by_count":4,"citation_normalized_percentile":{"value":0.74557365,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":93,"max":96},"biblio":{"volume":null,"issue":null,"first_page":null,"last_page":null},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9976000189781189,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9952999949455261,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/ant-colony-optimization-algorithms","display_name":"Ant colony optimization algorithms","score":0.7827543020248413},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6953626871109009},{"id":"https://openalex.org/keywords/preventive-maintenance","display_name":"Preventive maintenance","score":0.6609417200088501},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.6458265781402588},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6033424139022827},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.6021454334259033},{"id":"https://openalex.org/keywords/reliability","display_name":"Reliability (semiconductor)","score":0.5667396783828735},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.3278040289878845},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.2767254710197449},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.18122965097427368},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.11537289619445801},{"id":"https://openalex.org/keywords/routing","display_name":"Routing (electronic design automation)","score":0.06028136610984802},{"id":"https://openalex.org/keywords/embedded-system","display_name":"Embedded system","score":0.05416351556777954}],"concepts":[{"id":"https://openalex.org/C40128228","wikidata":"https://www.wikidata.org/wiki/Q460851","display_name":"Ant colony optimization algorithms","level":2,"score":0.7827543020248413},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6953626871109009},{"id":"https://openalex.org/C24090081","wikidata":"https://www.wikidata.org/wiki/Q1043452","display_name":"Preventive maintenance","level":2,"score":0.6609417200088501},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.6458265781402588},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6033424139022827},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.6021454334259033},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.5667396783828735},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.3278040289878845},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.2767254710197449},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.18122965097427368},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.11537289619445801},{"id":"https://openalex.org/C74172769","wikidata":"https://www.wikidata.org/wiki/Q1446839","display_name":"Routing (electronic design automation)","level":2,"score":0.06028136610984802},{"id":"https://openalex.org/C149635348","wikidata":"https://www.wikidata.org/wiki/Q193040","display_name":"Embedded system","level":1,"score":0.05416351556777954},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ieem.2018.8607602","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem.2018.8607602","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":7,"referenced_works":["https://openalex.org/W2005202176","https://openalex.org/W2024666582","https://openalex.org/W2032885523","https://openalex.org/W2111590521","https://openalex.org/W2122967269","https://openalex.org/W2393863992","https://openalex.org/W2581944861"],"related_works":["https://openalex.org/W2056013424","https://openalex.org/W2182624400","https://openalex.org/W4214827973","https://openalex.org/W1967226400","https://openalex.org/W2365800168","https://openalex.org/W3172150420","https://openalex.org/W2046656570","https://openalex.org/W2767428579","https://openalex.org/W2241208925","https://openalex.org/W3204654320"],"abstract_inverted_index":{"This":[0],"paper":[1],"studied":[2],"the":[3,60,68,80,88],"problem":[4],"of":[5,52,67],"parallel":[6],"processing":[7],"machine":[8],"scheduling,":[9],"taking":[10],"both":[11],"set":[12,48],"up":[13],"time":[14],"and":[15],"run-based":[16],"preventive":[17],"maintenance":[18],"with":[19],"reliability":[20],"constraints":[21],"into":[22],"consideration.":[23],"The":[24,42,55,75],"objective":[25,56],"is":[26,40,47,63],"to":[27,65],"minimize":[28],"makespan.":[29],"For":[30],"this":[31,53],"NP-hard":[32],"problem,":[33],"an":[34],"Ant":[35],"Colony":[36],"Optimization":[37],"(ACO)":[38],"algorithm":[39,62,83],"proposed.":[41],"node":[43],"selecting":[44],"probability":[45],"equation":[46],"based":[49],"on":[50],"characteristics":[51],"problem.":[54],"value":[57],"obtained":[58],"by":[59],"proposed":[61,81],"compared":[64],"that":[66,79],"classical":[69],"LPT":[70,89],"rule":[71],"through":[72],"numerical":[73],"experiments.":[74],"experiment":[76],"results":[77],"imply":[78],"ACO":[82],"has":[84],"better":[85],"performance":[86],"than":[87],"rule.":[90]},"counts_by_year":[{"year":2024,"cited_by_count":2},{"year":2021,"cited_by_count":2}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
