{"id":"https://openalex.org/W2015888373","doi":"https://doi.org/10.1109/ieem.2011.6118104","title":"Application of fuzzy mathematical programming to optimize an integrated production-distribution system","display_name":"Application of fuzzy mathematical programming to optimize an integrated production-distribution system","publication_year":2011,"publication_date":"2011-12-01","ids":{"openalex":"https://openalex.org/W2015888373","doi":"https://doi.org/10.1109/ieem.2011.6118104","mag":"2015888373"},"language":"en","primary_location":{"id":"doi:10.1109/ieem.2011.6118104","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem.2011.6118104","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2011 IEEE International Conference on Industrial Engineering and Engineering Management","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5073080302","display_name":"Fardin Ahmadizar","orcid":"https://orcid.org/0000-0002-8615-9893"},"institutions":[{"id":"https://openalex.org/I3124704065","display_name":"University of Kurdistan","ror":"https://ror.org/04k89yk85","country_code":"IR","type":"education","lineage":["https://openalex.org/I3124704065"]}],"countries":["IR"],"is_corresponding":true,"raw_author_name":"Fardin Ahmadizar","raw_affiliation_strings":["Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","Department\u00a0of Industrial Engineering, University of Kurdistan, Sanandaj, Iran"],"affiliations":[{"raw_affiliation_string":"Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","institution_ids":["https://openalex.org/I3124704065"]},{"raw_affiliation_string":"Department\u00a0of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","institution_ids":["https://openalex.org/I3124704065"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5044459671","display_name":"Mehdi Zeynivand","orcid":null},"institutions":[{"id":"https://openalex.org/I3124704065","display_name":"University of Kurdistan","ror":"https://ror.org/04k89yk85","country_code":"IR","type":"education","lineage":["https://openalex.org/I3124704065"]}],"countries":["IR"],"is_corresponding":false,"raw_author_name":"Mehdi Zeynivand","raw_affiliation_strings":["Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","Department\u00a0of Industrial Engineering, University of Kurdistan, Sanandaj, Iran"],"affiliations":[{"raw_affiliation_string":"Department of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","institution_ids":["https://openalex.org/I3124704065"]},{"raw_affiliation_string":"Department\u00a0of Industrial Engineering, University of Kurdistan, Sanandaj, Iran","institution_ids":["https://openalex.org/I3124704065"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5073080302"],"corresponding_institution_ids":["https://openalex.org/I3124704065"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.07925144,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"13","issue":null,"first_page":"1195","last_page":"1198"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T12709","display_name":"Optimization and Mathematical Programming","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T12709","display_name":"Optimization and Mathematical Programming","score":0.9998000264167786,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10050","display_name":"Multi-Criteria Decision Making","score":0.9948999881744385,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}},{"id":"https://openalex.org/T10539","display_name":"Sustainable Supply Chain Management","score":0.9905999898910522,"subfield":{"id":"https://openalex.org/subfields/1408","display_name":"Strategy and Management"},"field":{"id":"https://openalex.org/fields/14","display_name":"Business, Management and Accounting"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6586593985557556},{"id":"https://openalex.org/keywords/fuzzy-logic","display_name":"Fuzzy logic","score":0.643220067024231},{"id":"https://openalex.org/keywords/supply-chain","display_name":"Supply chain","score":0.6275843977928162},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.6214971542358398},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.5635419487953186},{"id":"https://openalex.org/keywords/supply-chain-management","display_name":"Supply chain management","score":0.5080040097236633},{"id":"https://openalex.org/keywords/linear-programming","display_name":"Linear programming","score":0.47504472732543945},{"id":"https://openalex.org/keywords/supply-chain-network","display_name":"Supply chain network","score":0.45065802335739136},{"id":"https://openalex.org/keywords/integrated-production","display_name":"Integrated production","score":0.4354128837585449},{"id":"https://openalex.org/keywords/production-planning","display_name":"Production planning","score":0.41279876232147217},{"id":"https://openalex.org/keywords/operations-research","display_name":"Operations research","score":0.3321363031864166},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.15179312229156494},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.13060206174850464},{"id":"https://openalex.org/keywords/artificial-intelligence","display_name":"Artificial intelligence","score":0.11479192972183228}],"concepts":[{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6586593985557556},{"id":"https://openalex.org/C58166","wikidata":"https://www.wikidata.org/wiki/Q224821","display_name":"Fuzzy logic","level":2,"score":0.643220067024231},{"id":"https://openalex.org/C108713360","wikidata":"https://www.wikidata.org/wiki/Q1824206","display_name":"Supply chain","level":2,"score":0.6275843977928162},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.6214971542358398},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.5635419487953186},{"id":"https://openalex.org/C44104985","wikidata":"https://www.wikidata.org/wiki/Q492886","display_name":"Supply chain management","level":3,"score":0.5080040097236633},{"id":"https://openalex.org/C41045048","wikidata":"https://www.wikidata.org/wiki/Q202843","display_name":"Linear programming","level":2,"score":0.47504472732543945},{"id":"https://openalex.org/C2778397037","wikidata":"https://www.wikidata.org/wiki/Q17083947","display_name":"Supply chain network","level":4,"score":0.45065802335739136},{"id":"https://openalex.org/C66341344","wikidata":"https://www.wikidata.org/wiki/Q2297743","display_name":"Integrated production","level":3,"score":0.4354128837585449},{"id":"https://openalex.org/C2777909354","wikidata":"https://www.wikidata.org/wiki/Q1386523","display_name":"Production planning","level":3,"score":0.41279876232147217},{"id":"https://openalex.org/C42475967","wikidata":"https://www.wikidata.org/wiki/Q194292","display_name":"Operations research","level":1,"score":0.3321363031864166},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.15179312229156494},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.13060206174850464},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.11479192972183228},{"id":"https://openalex.org/C199539241","wikidata":"https://www.wikidata.org/wiki/Q7748","display_name":"Law","level":1,"score":0.0},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.0},{"id":"https://openalex.org/C17744445","wikidata":"https://www.wikidata.org/wiki/Q36442","display_name":"Political science","level":0,"score":0.0},{"id":"https://openalex.org/C139719470","wikidata":"https://www.wikidata.org/wiki/Q39680","display_name":"Macroeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/ieem.2011.6118104","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ieem.2011.6118104","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2011 IEEE International Conference on Industrial Engineering and Engineering Management","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/9","score":0.4300000071525574,"display_name":"Industry, innovation and infrastructure"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W1964714279","https://openalex.org/W1973822995","https://openalex.org/W1982037250","https://openalex.org/W1982199694","https://openalex.org/W1988131669","https://openalex.org/W2001855247","https://openalex.org/W2009366122","https://openalex.org/W2041986753","https://openalex.org/W2089109958","https://openalex.org/W2912565176","https://openalex.org/W4211007335"],"related_works":["https://openalex.org/W2083520178","https://openalex.org/W2592044638","https://openalex.org/W2388427558","https://openalex.org/W2026960789","https://openalex.org/W2368850097","https://openalex.org/W1535178592","https://openalex.org/W2384301605","https://openalex.org/W159685533","https://openalex.org/W2550839360","https://openalex.org/W3168076711"],"abstract_inverted_index":{"Providing":[0],"an":[1,12],"efficient":[2],"unified":[3,44],"plan":[4],"that":[5],"integrates":[6],"production":[7,48],"and":[8,38,49,85,105,115],"distribution":[9,89],"plans":[10],"in":[11,77,91],"uncertain":[13],"environment":[14],"is":[15,67,119,129],"necessary":[16],"to":[17,56,68,79,101,121,132],"ensure":[18],"the":[19,70,74,82,123,134,137],"overall":[20],"effectiveness":[21],"of":[22,73,136],"supply":[23,94],"chain":[24],"management.":[25],"This":[26],"paper":[27],"presents":[28],"a":[29,43,87,92,106,111],"fuzzy":[30,47,97,103],"bi-objective":[31],"linear":[32],"programming":[33],"model":[34,118],"for":[35],"integrating":[36],"multi-product":[37],"multi-period":[39],"production-distribution":[40,75],"planning":[41],"into":[42],"framework":[45],"considering":[46],"demand.":[50],"In":[51],"this":[52],"model,":[53],"products":[54],"deliver":[55],"retailers":[57],"through":[58],"cross":[59],"docking":[60],"or":[61],"direct":[62],"shipment":[63],"strategies.":[64],"The":[65],"aim":[66],"determine":[69],"optimal":[71],"configuration":[72],"network":[76],"order":[78],"simultaneously":[80],"minimize":[81],"total":[83],"costs":[84],"design":[86],"JIT":[88],"system":[90],"three-echelon":[93],"chain.":[95],"Triangular":[96],"numbers":[98],"are":[99],"used":[100,131],"represent":[102],"parameters,":[104],"two-phase":[107],"approach":[108],"based":[109],"on":[110],"weighted":[112,116],"average":[113],"method":[114],"additive":[117],"applied":[120],"solve":[122],"proposed":[124],"model.":[125,138],"A":[126],"numerical":[127],"example":[128],"then":[130],"validate":[133],"applicability":[135]},"counts_by_year":[],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
