{"id":"https://openalex.org/W4388720282","doi":"https://doi.org/10.1109/iecon51785.2023.10312169","title":"Robust Optimal Scheduling of Integrated Electricity-Gas-Heat System Considering DC Power Flow Safety Domain","display_name":"Robust Optimal Scheduling of Integrated Electricity-Gas-Heat System Considering DC Power Flow Safety Domain","publication_year":2023,"publication_date":"2023-10-16","ids":{"openalex":"https://openalex.org/W4388720282","doi":"https://doi.org/10.1109/iecon51785.2023.10312169"},"language":"en","primary_location":{"id":"doi:10.1109/iecon51785.2023.10312169","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iecon51785.2023.10312169","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IECON 2023- 49th Annual Conference of the IEEE Industrial Electronics Society","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5016759992","display_name":"Yuzhi Zhou","orcid":"https://orcid.org/0000-0002-6797-282X"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Yuzhi Zhou","raw_affiliation_strings":["School of Electrical Engineering, Northeast Electric Power University,Jilin,China","School of Electrical Engineering, Northeast Electric Power University, Jilin, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University,Jilin,China","institution_ids":["https://openalex.org/I179060312"]},{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University, Jilin, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5053132608","display_name":"X. Li","orcid":"https://orcid.org/0000-0001-8792-3921"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Xinling Li","raw_affiliation_strings":["School of Electrical Engineering, Northeast Electric Power University,Jilin,China","School of Electrical Engineering, Northeast Electric Power University, Jilin, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University,Jilin,China","institution_ids":["https://openalex.org/I179060312"]},{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University, Jilin, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5037784515","display_name":"ChangXing Wang","orcid":null},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"ChangXing Wang","raw_affiliation_strings":["School of Electrical Engineering, Northeast Electric Power University,Jilin,China","School of Electrical Engineering, Northeast Electric Power University, Jilin, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University,Jilin,China","institution_ids":["https://openalex.org/I179060312"]},{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University, Jilin, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5082235308","display_name":"LI Hong-we","orcid":"https://orcid.org/0000-0003-1119-2119"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Hongwei Li","raw_affiliation_strings":["School of Electrical Engineering, Northeast Electric Power University,Jilin,China","School of Electrical Engineering, Northeast Electric Power University, Jilin, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University,Jilin,China","institution_ids":["https://openalex.org/I179060312"]},{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University, Jilin, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100655287","display_name":"Hongpeng Liu","orcid":"https://orcid.org/0000-0002-7494-9097"},"institutions":[{"id":"https://openalex.org/I179060312","display_name":"Northeast Electric Power University","ror":"https://ror.org/00zqaxa34","country_code":"CN","type":"education","lineage":["https://openalex.org/I179060312"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Hongpeng Liu","raw_affiliation_strings":["School of Electrical Engineering, Northeast Electric Power University,Jilin,China","School of Electrical Engineering, Northeast Electric Power University, Jilin, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University,Jilin,China","institution_ids":["https://openalex.org/I179060312"]},{"raw_affiliation_string":"School of Electrical Engineering, Northeast Electric Power University, Jilin, China","institution_ids":["https://openalex.org/I179060312"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5021902834","display_name":"Xiaolin Jiang","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xiaolin Jiang","raw_affiliation_strings":["State Grid Power Supply Company of Daqing City,Heilongjiang Province,China,163000"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Power Supply Company of Daqing City,Heilongjiang Province,China,163000","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":null,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":null,"cited_by_percentile_year":null,"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.9988999962806702,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.9987000226974487,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9977999925613403,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5769626498222351},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.5718982815742493},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.5169141292572021},{"id":"https://openalex.org/keywords/robust-optimization","display_name":"Robust optimization","score":0.482596755027771},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.4624026417732239},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.4490441381931305},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.4388664662837982},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.3670918941497803},{"id":"https://openalex.org/keywords/control-theory","display_name":"Control theory (sociology)","score":0.35097992420196533},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.3144327998161316},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.28576675057411194},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.11071145534515381},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.09552794694900513}],"concepts":[{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5769626498222351},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.5718982815742493},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5169141292572021},{"id":"https://openalex.org/C193254401","wikidata":"https://www.wikidata.org/wiki/Q2160088","display_name":"Robust optimization","level":2,"score":0.482596755027771},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.4624026417732239},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.4490441381931305},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.4388664662837982},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.3670918941497803},{"id":"https://openalex.org/C47446073","wikidata":"https://www.wikidata.org/wiki/Q5165890","display_name":"Control theory (sociology)","level":3,"score":0.35097992420196533},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3144327998161316},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.28576675057411194},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.11071145534515381},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.09552794694900513},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C2775924081","wikidata":"https://www.wikidata.org/wiki/Q55608371","display_name":"Control (management)","level":2,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/iecon51785.2023.10312169","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iecon51785.2023.10312169","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IECON 2023- 49th Annual Conference of the IEEE Industrial Electronics Society","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.9200000166893005,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W2006848839","https://openalex.org/W2068920029","https://openalex.org/W2906640402"],"related_works":["https://openalex.org/W2557657611","https://openalex.org/W3195104199","https://openalex.org/W4211120176","https://openalex.org/W1986587019","https://openalex.org/W2108466866","https://openalex.org/W4307690338","https://openalex.org/W2138908244","https://openalex.org/W4380898831","https://openalex.org/W4386420510","https://openalex.org/W4234407667"],"abstract_inverted_index":{"Due":[0],"to":[1,32,42,174],"its":[2,18],"unique":[3],"uncertainty":[4,36,94,156],"and":[5,17,41,52,61,97,111,121,126,136,160,169,180,190],"volatility,":[6],"wind":[7,38,92,112,158],"power":[8,15,24,39,66,78,85,93,113,159,167],"is":[9,27,70,95,104,119,131],"increasingly":[10],"penetrating":[11],"various":[12],"levels":[13],"of":[14,23,37,46,102,138,157,164,192],"grids,":[16],"impact":[19],"on":[20,74,91],"the":[21,35,44,56,64,75,98,108,134,139,149,155,161,165,188,193],"stability":[22,45],"grid":[25],"operations":[26],"gradually":[28],"increasing.":[29],"In":[30,147],"order":[31],"cope":[33],"with":[34],"output":[40],"improve":[43],"system":[47,59],"operation,":[48],"a":[49,83,115,122,176],"robust":[50,116,124,171,178],"optimization":[51,125,179],"scheduling":[53,127,181],"model":[54,89,128,141,151],"for":[55,129,182],"integrated":[57],"electricity-gas-heat":[58],"(IEGHS),":[60],"heat":[62],"considering":[63,107],"DC":[65,77,84,166],"flow":[67,79,86],"security":[68,80,87,109],"domain":[69,81,88,110,163],"proposed.":[71,132],"Firstly,":[72],"based":[73,90],"traditional":[76],"model,":[82],"established":[96],"operating":[99],"safety":[100,162],"boundary":[101],"nodes":[103],"established.":[105],"Secondly,":[106],"uncertainty,":[114],"budget":[117,172],"parameter":[118],"introduced,":[120],"controllable":[123,177],"IEGHS":[130],"Finally,":[133],"effectiveness":[135,189],"practicality":[137,191],"proposed":[140,150,194],"are":[142],"demonstrated":[143],"through":[144],"numerical":[145],"simulation.":[146],"summary,":[148],"takes":[152],"into":[153],"account":[154],"flow,":[168],"introduces":[170],"parameters":[173],"achieve":[175],"IEGHS.":[183],"The":[184],"simulation":[185],"results":[186],"demonstrate":[187],"model.":[195]},"counts_by_year":[{"year":2025,"cited_by_count":1}],"updated_date":"2026-07-14T23:27:15.235271","created_date":"2025-10-10T00:00:00"}
