{"id":"https://openalex.org/W2567989247","doi":"https://doi.org/10.1109/iecon.2016.7793881","title":"Selecting energy storage systems with wind power in distribution network","display_name":"Selecting energy storage systems with wind power in distribution network","publication_year":2016,"publication_date":"2016-10-01","ids":{"openalex":"https://openalex.org/W2567989247","doi":"https://doi.org/10.1109/iecon.2016.7793881","mag":"2567989247"},"language":"en","primary_location":{"id":"doi:10.1109/iecon.2016.7793881","is_oa":false,"landing_page_url":"https://doi.org/10.1109/iecon.2016.7793881","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IECON 2016 - 42nd Annual Conference of the IEEE Industrial Electronics Society","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5027121592","display_name":"Ibrahim Amin","orcid":null},"institutions":[{"id":"https://openalex.org/I134085113","display_name":"King Fahd University of Petroleum and Minerals","ror":"https://ror.org/03yez3163","country_code":"SA","type":"education","lineage":["https://openalex.org/I134085113"]}],"countries":["SA"],"is_corresponding":false,"raw_author_name":"Ibrahim El Amin","raw_affiliation_strings":["Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA","institution_ids":["https://openalex.org/I134085113"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5064392661","display_name":"Muhammad Fahad Zia","orcid":"https://orcid.org/0000-0002-8654-6121"},"institutions":[{"id":"https://openalex.org/I134085113","display_name":"King Fahd University of Petroleum and Minerals","ror":"https://ror.org/03yez3163","country_code":"SA","type":"education","lineage":["https://openalex.org/I134085113"]}],"countries":["SA"],"is_corresponding":false,"raw_author_name":"Muhammad Fahad Zia","raw_affiliation_strings":["Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA","institution_ids":["https://openalex.org/I134085113"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5075386163","display_name":"Md Shafiullah","orcid":"https://orcid.org/0000-0003-2282-5663"},"institutions":[{"id":"https://openalex.org/I134085113","display_name":"King Fahd University of Petroleum and Minerals","ror":"https://ror.org/03yez3163","country_code":"SA","type":"education","lineage":["https://openalex.org/I134085113"]}],"countries":["SA"],"is_corresponding":false,"raw_author_name":"Md Shafiullah","raw_affiliation_strings":["Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"Department of Electrical Engineering, King Fahd University of Petroleum & Minerals, Dhahran, KSA","institution_ids":["https://openalex.org/I134085113"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I134085113"],"apc_list":null,"apc_paid":null,"fwci":0.8101,"has_fulltext":false,"cited_by_count":7,"citation_normalized_percentile":{"value":0.77016805,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":96},"biblio":{"volume":"45","issue":null,"first_page":"4229","last_page":"4234"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11185","display_name":"Integrated Energy Systems Optimization","score":0.998199999332428,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9979000091552734,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.603416383266449},{"id":"https://openalex.org/keywords/limit","display_name":"Limit (mathematics)","score":0.5093811750411987},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.5057175159454346},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5050557255744934},{"id":"https://openalex.org/keywords/energy-storage","display_name":"Energy storage","score":0.4911441504955292},{"id":"https://openalex.org/keywords/base-load-power-plant","display_name":"Base load power plant","score":0.48221027851104736},{"id":"https://openalex.org/keywords/peak-demand","display_name":"Peak demand","score":0.4629564881324768},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.46248680353164673},{"id":"https://openalex.org/keywords/stand-alone-power-system","display_name":"Stand-alone power system","score":0.4503830075263977},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.43935760855674744},{"id":"https://openalex.org/keywords/profit","display_name":"Profit (economics)","score":0.4339006543159485},{"id":"https://openalex.org/keywords/load-management","display_name":"Load management","score":0.42105796933174133},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.41611966490745544},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.4050736129283905},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.38787034153938293},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.37415361404418945},{"id":"https://openalex.org/keywords/automotive-engineering","display_name":"Automotive engineering","score":0.36871621012687683},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.34977149963378906},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.2836761474609375},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.24750259518623352},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.09579393267631531},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.08641624450683594}],"concepts":[{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.603416383266449},{"id":"https://openalex.org/C151201525","wikidata":"https://www.wikidata.org/wiki/Q177239","display_name":"Limit (mathematics)","level":2,"score":0.5093811750411987},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5057175159454346},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5050557255744934},{"id":"https://openalex.org/C73916439","wikidata":"https://www.wikidata.org/wiki/Q837718","display_name":"Energy storage","level":3,"score":0.4911441504955292},{"id":"https://openalex.org/C123153844","wikidata":"https://www.wikidata.org/wiki/Q360897","display_name":"Base load power plant","level":4,"score":0.48221027851104736},{"id":"https://openalex.org/C147940328","wikidata":"https://www.wikidata.org/wiki/Q3393666","display_name":"Peak demand","level":3,"score":0.4629564881324768},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.46248680353164673},{"id":"https://openalex.org/C104708988","wikidata":"https://www.wikidata.org/wiki/Q1664450","display_name":"Stand-alone power system","level":4,"score":0.4503830075263977},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.43935760855674744},{"id":"https://openalex.org/C181622380","wikidata":"https://www.wikidata.org/wiki/Q26911","display_name":"Profit (economics)","level":2,"score":0.4339006543159485},{"id":"https://openalex.org/C2779370713","wikidata":"https://www.wikidata.org/wiki/Q357554","display_name":"Load management","level":2,"score":0.42105796933174133},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.41611966490745544},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.4050736129283905},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.38787034153938293},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.37415361404418945},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.36871621012687683},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.34977149963378906},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2836761474609375},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.24750259518623352},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.09579393267631531},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.08641624450683594},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C134306372","wikidata":"https://www.wikidata.org/wiki/Q7754","display_name":"Mathematical analysis","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/iecon.2016.7793881","is_oa":false,"landing_page_url":"https://doi.org/10.1109/iecon.2016.7793881","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"IECON 2016 - 42nd Annual Conference of the IEEE Industrial Electronics Society","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7","score":0.9100000262260437}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":26,"referenced_works":["https://openalex.org/W158748235","https://openalex.org/W163729060","https://openalex.org/W1480986506","https://openalex.org/W1486519276","https://openalex.org/W1565229770","https://openalex.org/W1981984653","https://openalex.org/W1993392501","https://openalex.org/W2002785432","https://openalex.org/W2007485113","https://openalex.org/W2046869866","https://openalex.org/W2049531454","https://openalex.org/W2089000719","https://openalex.org/W2099915902","https://openalex.org/W2106574687","https://openalex.org/W2122610583","https://openalex.org/W2123135901","https://openalex.org/W2126123166","https://openalex.org/W2134918206","https://openalex.org/W2135811075","https://openalex.org/W2139073438","https://openalex.org/W2142815812","https://openalex.org/W2168326514","https://openalex.org/W2181869058","https://openalex.org/W4292483811","https://openalex.org/W6652396340","https://openalex.org/W6678029789"],"related_works":["https://openalex.org/W2522559011","https://openalex.org/W2555175041","https://openalex.org/W2591208647","https://openalex.org/W4239205706","https://openalex.org/W4239297229","https://openalex.org/W2888353983","https://openalex.org/W3209288936","https://openalex.org/W2907087623","https://openalex.org/W2782880286","https://openalex.org/W39487273"],"abstract_inverted_index":{"In":[0,48],"distribution":[1,67,100,114,129],"systems,":[2],"load":[3,25,84],"demand":[4,13,85],"can":[5,21,38],"exceed":[6,87],"the":[7,57,80,83,94,98,120,136],"feeder":[8,88],"thermal":[9,89],"limit":[10],"during":[11],"peak":[12],"periods":[14],"and":[15,34,61,102,134],"cause":[16],"system":[17,101],"damage.":[18],"This":[19,91],"situation":[20],"be":[22,39],"prevented":[23],"by":[24,41],"shedding,":[26],"which":[27],"results":[28,117],"in":[29,64,75,128],"financial":[30],"losses":[31],"to":[32,131],"utilities":[33],"customers.":[35],"The":[36,105,116],"problem":[37,55,108],"countered":[40],"utilizing":[42],"energy":[43],"storage":[44],"systems":[45,130],"(ESS)":[46],"properly.":[47],"this":[49],"paper,":[50],"we":[51],"formulate":[52],"an":[53,76],"optimization":[54,107],"combining":[56],"utilization":[58],"of":[59,97,123],"ESS":[60,124,137],"wind":[62,126],"power":[63,71,99,127],"a":[65,112],"typical":[66,113],"system,":[68],"whereby":[69],"real":[70],"is":[72,109],"optimally":[73],"scheduled":[74],"electricity":[77],"market":[78],"under":[79],"constraint":[81],"that":[82],"cannot":[86],"limit.":[90],"approach":[92],"ensures":[93],"reliable":[95],"operation":[96,122],"prevents":[103],"outages.":[104],"developed":[106],"solved":[110],"for":[111],"system.":[115],"clearly":[118],"demonstrate":[119],"economical":[121],"with":[125],"prevent":[132],"outages":[133],"maximize":[135],"profit.":[138]},"counts_by_year":[{"year":2021,"cited_by_count":2},{"year":2020,"cited_by_count":2},{"year":2019,"cited_by_count":1},{"year":2018,"cited_by_count":1},{"year":2017,"cited_by_count":1}],"updated_date":"2026-06-26T08:34:08.712188","created_date":"2025-10-10T00:00:00"}
