{"id":"https://openalex.org/W4205148654","doi":"https://doi.org/10.1109/icsai53574.2021.9664036","title":"Intelligent Prediction of Power Grid Project Cost Based on PSO-BP Model","display_name":"Intelligent Prediction of Power Grid Project Cost Based on PSO-BP Model","publication_year":2021,"publication_date":"2021-11-13","ids":{"openalex":"https://openalex.org/W4205148654","doi":"https://doi.org/10.1109/icsai53574.2021.9664036"},"language":"en","primary_location":{"id":"doi:10.1109/icsai53574.2021.9664036","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai53574.2021.9664036","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 7th International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5113963385","display_name":"Dan Chen","orcid":"https://orcid.org/0009-0007-2001-3334"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Dan Chen","raw_affiliation_strings":["Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5056285679","display_name":"Daojun Ding","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Daojun Ding","raw_affiliation_strings":["State Grid Jiangsu Electric Power Co. ltd., Nanjing, China"],"affiliations":[{"raw_affiliation_string":"State Grid Jiangsu Electric Power Co. ltd., Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5011040963","display_name":"Xiaomeng Zhai","orcid":"https://orcid.org/0009-0001-0577-4027"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xiaomeng Zhai","raw_affiliation_strings":["Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5036566563","display_name":"Xiang Zhou","orcid":"https://orcid.org/0000-0003-2746-5943"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xiang Zhou","raw_affiliation_strings":["Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5101831976","display_name":"Huichuan Liu","orcid":"https://orcid.org/0000-0003-4699-498X"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Huichuan Liu","raw_affiliation_strings":["Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Economic Research Institute, State Grid Jiangsu Electric Power Co. ltd., Nanjing, China","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5018356639","display_name":"Luofei Wu","orcid":null},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Luofei Wu","raw_affiliation_strings":["School of Economics and Management, North China Electric Power University, Beijing, China"],"affiliations":[{"raw_affiliation_string":"School of Economics and Management, North China Electric Power University, Beijing, China","institution_ids":["https://openalex.org/I153473198"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":6,"corresponding_author_ids":["https://openalex.org/A5113963385"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.3008,"has_fulltext":false,"cited_by_count":4,"citation_normalized_percentile":{"value":0.5788149,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":95},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"5"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9986000061035156,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9986000061035156,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11276","display_name":"Solar Radiation and Photovoltaics","score":0.9872000217437744,"subfield":{"id":"https://openalex.org/subfields/1702","display_name":"Artificial Intelligence"},"field":{"id":"https://openalex.org/fields/17","display_name":"Computer Science"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12368","display_name":"Grey System Theory Applications","score":0.9715999960899353,"subfield":{"id":"https://openalex.org/subfields/1803","display_name":"Management Science and Operations Research"},"field":{"id":"https://openalex.org/fields/18","display_name":"Decision Sciences"},"domain":{"id":"https://openalex.org/domains/2","display_name":"Social Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/smart-grid","display_name":"Smart grid","score":0.8017094135284424},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.6262199282646179},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5333680510520935},{"id":"https://openalex.org/keywords/particle-swarm-optimization","display_name":"Particle swarm optimization","score":0.4877946674823761},{"id":"https://openalex.org/keywords/power-grid","display_name":"Power grid","score":0.4850425124168396},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.48283323645591736},{"id":"https://openalex.org/keywords/investment","display_name":"Investment (military)","score":0.47840461134910583},{"id":"https://openalex.org/keywords/promotion","display_name":"Promotion (chess)","score":0.4689190983772278},{"id":"https://openalex.org/keywords/electric-power","display_name":"Electric power","score":0.46631675958633423},{"id":"https://openalex.org/keywords/electric-power-industry","display_name":"Electric power industry","score":0.462862104177475},{"id":"https://openalex.org/keywords/scale","display_name":"Scale (ratio)","score":0.4222617447376251},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.40168896317481995},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.3819730281829834},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.38100025057792664},{"id":"https://openalex.org/keywords/systems-engineering","display_name":"Systems engineering","score":0.3485719561576843},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.33089905977249146},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.18885445594787598},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.17734581232070923},{"id":"https://openalex.org/keywords/machine-learning","display_name":"Machine learning","score":0.10577347874641418}],"concepts":[{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.8017094135284424},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.6262199282646179},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5333680510520935},{"id":"https://openalex.org/C85617194","wikidata":"https://www.wikidata.org/wiki/Q2072794","display_name":"Particle swarm optimization","level":2,"score":0.4877946674823761},{"id":"https://openalex.org/C2983254600","wikidata":"https://www.wikidata.org/wiki/Q1096907","display_name":"Power grid","level":3,"score":0.4850425124168396},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.48283323645591736},{"id":"https://openalex.org/C27548731","wikidata":"https://www.wikidata.org/wiki/Q88272","display_name":"Investment (military)","level":3,"score":0.47840461134910583},{"id":"https://openalex.org/C98147612","wikidata":"https://www.wikidata.org/wiki/Q215599","display_name":"Promotion (chess)","level":3,"score":0.4689190983772278},{"id":"https://openalex.org/C40293303","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electric power","level":3,"score":0.46631675958633423},{"id":"https://openalex.org/C170777988","wikidata":"https://www.wikidata.org/wiki/Q2316331","display_name":"Electric power industry","level":3,"score":0.462862104177475},{"id":"https://openalex.org/C2778755073","wikidata":"https://www.wikidata.org/wiki/Q10858537","display_name":"Scale (ratio)","level":2,"score":0.4222617447376251},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.40168896317481995},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.3819730281829834},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.38100025057792664},{"id":"https://openalex.org/C201995342","wikidata":"https://www.wikidata.org/wiki/Q682496","display_name":"Systems engineering","level":1,"score":0.3485719561576843},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.33089905977249146},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.18885445594787598},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.17734581232070923},{"id":"https://openalex.org/C119857082","wikidata":"https://www.wikidata.org/wiki/Q2539","display_name":"Machine learning","level":1,"score":0.10577347874641418},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C199539241","wikidata":"https://www.wikidata.org/wiki/Q7748","display_name":"Law","level":1,"score":0.0},{"id":"https://openalex.org/C17744445","wikidata":"https://www.wikidata.org/wiki/Q36442","display_name":"Political science","level":0,"score":0.0},{"id":"https://openalex.org/C94625758","wikidata":"https://www.wikidata.org/wiki/Q7163","display_name":"Politics","level":2,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/icsai53574.2021.9664036","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai53574.2021.9664036","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2021 7th International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.6399999856948853,"id":"https://metadata.un.org/sdg/9","display_name":"Industry, innovation and infrastructure"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":6,"referenced_works":["https://openalex.org/W2353149078","https://openalex.org/W2369857871","https://openalex.org/W2791958283","https://openalex.org/W2894993992","https://openalex.org/W3041303727","https://openalex.org/W7033608739"],"related_works":["https://openalex.org/W2142945692","https://openalex.org/W2356512289","https://openalex.org/W1629635549","https://openalex.org/W2348819278","https://openalex.org/W2379250692","https://openalex.org/W2897016074","https://openalex.org/W2374094183","https://openalex.org/W2378187163","https://openalex.org/W2352170327","https://openalex.org/W2356781843"],"abstract_inverted_index":{"With":[0,24],"the":[1,11,19,25,41,53,60,82,93,102],"promotion":[2],"of":[3,7,21,34,44,56,70,86,89,95,105],"a":[4],"new":[5],"round":[6],"power":[8,12,36,45,72],"system":[9],"reform,":[10],"grid":[13,37,46,58,73],"project":[14],"cost":[15,42,75],"will":[16,48],"develop":[17],"towards":[18],"direction":[20],"lean":[22],"management.":[23],"increasingly":[26],"complex":[27],"construction":[28,104],"environment":[29],"and":[30,84,91],"increasing":[31],"investment":[32],"scale":[33],"electric":[35,71],"engineering":[38,74],"in":[39,59],"China,":[40],"control":[43],"projects":[47],"be":[49],"directly":[50],"related":[51],"to":[52],"development":[54],"level":[55],"smart":[57,106],"future.":[61],"Therefore,":[62],"this":[63],"paper":[64],"proposes":[65],"an":[66],"intelligent":[67,87],"forecasting":[68],"model":[69],"based":[76],"on":[77],"PSO-BP":[78],"algorithm,":[79],"which":[80,97],"improves":[81],"accuracy":[83],"efficiency":[85],"prediction":[88],"cost,":[90],"has":[92],"ability":[94],"popularization,":[96],"provides":[98],"strong":[99],"help":[100],"for":[101],"future":[103],"grid.":[107]},"counts_by_year":[{"year":2025,"cited_by_count":1},{"year":2024,"cited_by_count":1},{"year":2023,"cited_by_count":1},{"year":2022,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
