{"id":"https://openalex.org/W2782974103","doi":"https://doi.org/10.1109/icsai.2017.8248318","title":"Rolling dispatch of demand response resources considering renewable energy accommodation","display_name":"Rolling dispatch of demand response resources considering renewable energy accommodation","publication_year":2017,"publication_date":"2017-11-01","ids":{"openalex":"https://openalex.org/W2782974103","doi":"https://doi.org/10.1109/icsai.2017.8248318","mag":"2782974103"},"language":"en","primary_location":{"id":"doi:10.1109/icsai.2017.8248318","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai.2017.8248318","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2017 4th International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5040318942","display_name":"Meimei Duan","orcid":"https://orcid.org/0000-0002-5068-6747"},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"Meimei Duan","raw_affiliation_strings":["Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5087210927","display_name":"Xuesong Shao","orcid":"https://orcid.org/0000-0003-0127-0291"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Xuesong Shao","raw_affiliation_strings":["Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5108753025","display_name":"Gaoying Cui","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Gaoying Cui","raw_affiliation_strings":["Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5039919397","display_name":"Aixia Zheng","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Aixia Zheng","raw_affiliation_strings":["Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"Jiangsu Electric Power Company Research Institute, State Grid Key Laboratory of Electrical Power Metering, Nanjing, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5021800601","display_name":"Gege Tong","orcid":null},"institutions":[{"id":"https://openalex.org/I76569877","display_name":"Southeast University","ror":"https://ror.org/04ct4d772","country_code":"CN","type":"education","lineage":["https://openalex.org/I76569877"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Gege Tong","raw_affiliation_strings":["School of Electrical Engineering, Southeast University, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Southeast University, Nanjing, China","institution_ids":["https://openalex.org/I76569877"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5112778326","display_name":"Gang Wu","orcid":null},"institutions":[{"id":"https://openalex.org/I76569877","display_name":"Southeast University","ror":"https://ror.org/04ct4d772","country_code":"CN","type":"education","lineage":["https://openalex.org/I76569877"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Gang Wu","raw_affiliation_strings":["School of Electrical Engineering, Southeast University, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Southeast University, Nanjing, China","institution_ids":["https://openalex.org/I76569877"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5049214482","display_name":"Ciwei Gao","orcid":"https://orcid.org/0000-0002-6982-7984"},"institutions":[{"id":"https://openalex.org/I76569877","display_name":"Southeast University","ror":"https://ror.org/04ct4d772","country_code":"CN","type":"education","lineage":["https://openalex.org/I76569877"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Ciwei Gao","raw_affiliation_strings":["School of Electrical Engineering, Southeast University, Nanjing, China"],"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Southeast University, Nanjing, China","institution_ids":["https://openalex.org/I76569877"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":7,"corresponding_author_ids":["https://openalex.org/A5040318942"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":3,"citation_normalized_percentile":{"value":0.2600745,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":91,"max":95},"biblio":{"volume":null,"issue":null,"first_page":"358","last_page":"362"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9983999729156494,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9983999729156494,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.998199999332428,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14502","display_name":"High-Voltage Power Transmission Systems","score":0.9970999956130981,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.785736620426178},{"id":"https://openalex.org/keywords/economic-dispatch","display_name":"Economic dispatch","score":0.698711633682251},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.6797519326210022},{"id":"https://openalex.org/keywords/scale","display_name":"Scale (ratio)","score":0.5583281517028809},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5439115166664124},{"id":"https://openalex.org/keywords/generator","display_name":"Generator (circuit theory)","score":0.5417438745498657},{"id":"https://openalex.org/keywords/incentive","display_name":"Incentive","score":0.5291997194290161},{"id":"https://openalex.org/keywords/accommodation","display_name":"Accommodation","score":0.4489530622959137},{"id":"https://openalex.org/keywords/response-time","display_name":"Response time","score":0.4246729612350464},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.42458418011665344},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.35299378633499146},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.32956111431121826},{"id":"https://openalex.org/keywords/automotive-engineering","display_name":"Automotive engineering","score":0.32211834192276},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.2415682077407837},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.22032034397125244},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.1783858835697174},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.13109159469604492},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.12661293148994446}],"concepts":[{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.785736620426178},{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.698711633682251},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.6797519326210022},{"id":"https://openalex.org/C2778755073","wikidata":"https://www.wikidata.org/wiki/Q10858537","display_name":"Scale (ratio)","level":2,"score":0.5583281517028809},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5439115166664124},{"id":"https://openalex.org/C2780992000","wikidata":"https://www.wikidata.org/wiki/Q17016113","display_name":"Generator (circuit theory)","level":3,"score":0.5417438745498657},{"id":"https://openalex.org/C29122968","wikidata":"https://www.wikidata.org/wiki/Q1414816","display_name":"Incentive","level":2,"score":0.5291997194290161},{"id":"https://openalex.org/C157660682","wikidata":"https://www.wikidata.org/wiki/Q419793","display_name":"Accommodation","level":2,"score":0.4489530622959137},{"id":"https://openalex.org/C19012869","wikidata":"https://www.wikidata.org/wiki/Q578372","display_name":"Response time","level":2,"score":0.4246729612350464},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.42458418011665344},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.35299378633499146},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.32956111431121826},{"id":"https://openalex.org/C171146098","wikidata":"https://www.wikidata.org/wiki/Q124192","display_name":"Automotive engineering","level":1,"score":0.32211834192276},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.2415682077407837},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.22032034397125244},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.1783858835697174},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.13109159469604492},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.12661293148994446},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C169760540","wikidata":"https://www.wikidata.org/wiki/Q207011","display_name":"Neuroscience","level":1,"score":0.0},{"id":"https://openalex.org/C121684516","wikidata":"https://www.wikidata.org/wiki/Q7600677","display_name":"Computer graphics (images)","level":1,"score":0.0},{"id":"https://openalex.org/C86803240","wikidata":"https://www.wikidata.org/wiki/Q420","display_name":"Biology","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/icsai.2017.8248318","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai.2017.8248318","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2017 4th International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.8600000143051147,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":9,"referenced_works":["https://openalex.org/W2049975522","https://openalex.org/W2122367462","https://openalex.org/W2125790010","https://openalex.org/W2347935280","https://openalex.org/W2355759143","https://openalex.org/W2371654894","https://openalex.org/W2377267908","https://openalex.org/W2379283816","https://openalex.org/W2385146023"],"related_works":["https://openalex.org/W61434238","https://openalex.org/W4248007958","https://openalex.org/W1973833648","https://openalex.org/W2965932060","https://openalex.org/W4225930592","https://openalex.org/W3015888096","https://openalex.org/W1990602351","https://openalex.org/W2555175041","https://openalex.org/W3088191348","https://openalex.org/W2809389280"],"abstract_inverted_index":{"Based":[0],"on":[1,47,77],"the":[2,48,64,74,78,82,99,115,120,123],"multi-time":[3,61],"scale":[4,62],"characteristic":[5],"of":[6,16,35,57,66,102,114,122],"demand":[7,49],"response":[8],"(DR),":[9],"a":[10],"rolling":[11,125],"dispatch":[12,126],"model":[13,29],"which":[14],"consists":[15],"three":[17],"different":[18,36,54,67,91],"time":[19,37,92],"scales":[20,38,93],"(i.e.":[21],"day-ahead,":[22],"in-day":[23],"and":[24,39,63,73,87,98],"real-time)":[25],"was":[26],"proposed.":[27],"The":[28,111],"coordinately":[30],"considered":[31,53],"incentive-based":[32],"DR":[33,41,88],"resources":[34,42,89],"price-based":[40],"affected":[43],"by":[44],"real-time":[45],"price":[46],"side.":[50,80],"It":[51],"also":[52],"forecasting":[55],"accuracy":[56],"renewable":[58,106],"energy":[59,107],"in":[60,90],"generators":[65,86],"ramping":[68],"speeds":[69],"(the":[70],"conventional":[71],"generator":[72],"quick-start":[75],"generator)":[76],"supply":[79],"Through":[81],"proposed":[83,124],"triple-scale":[84],"model,":[85],"can":[94,108],"be":[95,109],"well":[96],"dispatched":[97],"operation":[100],"costs":[101],"power":[103],"system":[104,118],"with":[105],"optimized.":[110],"testing":[112],"results":[113],"IEEE":[116],"5-bus":[117],"verified":[119],"effectiveness":[121],"model.":[127]},"counts_by_year":[{"year":2025,"cited_by_count":1},{"year":2021,"cited_by_count":2}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
