{"id":"https://openalex.org/W2570485026","doi":"https://doi.org/10.1109/icsai.2016.7810961","title":"A time sequential simulation method for making electric energy monthly trade schedule incorporating multiple energy resources","display_name":"A time sequential simulation method for making electric energy monthly trade schedule incorporating multiple energy resources","publication_year":2016,"publication_date":"2016-11-01","ids":{"openalex":"https://openalex.org/W2570485026","doi":"https://doi.org/10.1109/icsai.2016.7810961","mag":"2570485026"},"language":"en","primary_location":{"id":"doi:10.1109/icsai.2016.7810961","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai.2016.7810961","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2016 3rd International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"},"type":"conference-paper","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5100666529","display_name":"Yi Wang","orcid":"https://orcid.org/0000-0002-8854-3848"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Yi Wang","raw_affiliation_strings":["State Grid Liaoning Electric Power Supply Co. Ltd., Shenyang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Supply Co. Ltd., Shenyang, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5016307221","display_name":"Jiakai Shen","orcid":"https://orcid.org/0000-0002-5602-0903"},"institutions":[{"id":"https://openalex.org/I27357992","display_name":"Dalian University of Technology","ror":"https://ror.org/023hj5876","country_code":"CN","type":"education","lineage":["https://openalex.org/I27357992"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jiakai Shen","raw_affiliation_strings":["School of Electrical Engineering, Dalian University of Technology, Dalian, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Dalian University of Technology, Dalian, China","institution_ids":["https://openalex.org/I27357992"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5080260006","display_name":"Dalong Hu","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Dalong Hu","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited, Economic Research Institute, Shenyang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited, Economic Research Institute, Shenyang, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100910920","display_name":"Ye Han","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Ye Han","raw_affiliation_strings":["State Grid Liaoning Electric Power Supply Co. Ltd., Shenyang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Supply Co. Ltd., Shenyang, China","institution_ids":[]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5100710867","display_name":"Weidong Li","orcid":"https://orcid.org/0000-0001-5559-7834"},"institutions":[{"id":"https://openalex.org/I27357992","display_name":"Dalian University of Technology","ror":"https://ror.org/023hj5876","country_code":"CN","type":"education","lineage":["https://openalex.org/I27357992"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Weidong Li","raw_affiliation_strings":["School of Electrical Engineering, Dalian University of Technology, Dalian, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Electrical Engineering, Dalian University of Technology, Dalian, China","institution_ids":["https://openalex.org/I27357992"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5102550773","display_name":"Jiye Yang","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Jiye Yang","raw_affiliation_strings":["State Grid Liaoning Electric Power Company Limited, Economic Research Institute, Shenyang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"State Grid Liaoning Electric Power Company Limited, Economic Research Institute, Shenyang, China","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.31339713,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"2016","issue":null,"first_page":"240","last_page":"246"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9933000206947327,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9933000206947327,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14276","display_name":"Power Systems and Technologies","score":0.9914000034332275,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.9866999983787537,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.7542529106140137},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6762021780014038},{"id":"https://openalex.org/keywords/correctness","display_name":"Correctness","score":0.6508190631866455},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.5380728840827942},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.5088841915130615},{"id":"https://openalex.org/keywords/energy","display_name":"Energy (signal processing)","score":0.5066183805465698},{"id":"https://openalex.org/keywords/resource","display_name":"Resource (disambiguation)","score":0.4871613681316376},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.48184072971343994},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.46603792905807495},{"id":"https://openalex.org/keywords/electric-power","display_name":"Electric power","score":0.45986366271972656},{"id":"https://openalex.org/keywords/simulation","display_name":"Simulation","score":0.4003520905971527},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.3784835636615753},{"id":"https://openalex.org/keywords/real-time-computing","display_name":"Real-time computing","score":0.36207640171051025},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.35694363713264465},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18346130847930908},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.15606418251991272},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.13163027167320251}],"concepts":[{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.7542529106140137},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6762021780014038},{"id":"https://openalex.org/C55439883","wikidata":"https://www.wikidata.org/wiki/Q360812","display_name":"Correctness","level":2,"score":0.6508190631866455},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.5380728840827942},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5088841915130615},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.5066183805465698},{"id":"https://openalex.org/C206345919","wikidata":"https://www.wikidata.org/wiki/Q20380951","display_name":"Resource (disambiguation)","level":2,"score":0.4871613681316376},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.48184072971343994},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.46603792905807495},{"id":"https://openalex.org/C40293303","wikidata":"https://www.wikidata.org/wiki/Q27137","display_name":"Electric power","level":3,"score":0.45986366271972656},{"id":"https://openalex.org/C44154836","wikidata":"https://www.wikidata.org/wiki/Q45045","display_name":"Simulation","level":1,"score":0.4003520905971527},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.3784835636615753},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.36207640171051025},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.35694363713264465},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18346130847930908},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.15606418251991272},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.13163027167320251},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.1109/icsai.2016.7810961","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icsai.2016.7810961","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2016 3rd International Conference on Systems and Informatics (ICSAI)","raw_type":"proceedings-article"},{"id":"mag:2748866697","is_oa":false,"landing_page_url":"http://jglobal.jst.go.jp/en/public/201702231185614740","pdf_url":null,"source":{"id":"https://openalex.org/S4306512817","display_name":"IEEE Conference Proceedings","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":null,"host_organization_name":null,"host_organization_lineage":[],"host_organization_lineage_names":[],"type":"conference"},"license":null,"license_id":null,"version":null,"is_accepted":false,"is_published":null,"raw_source_name":"IEEE Conference Proceedings","raw_type":null}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","score":0.699999988079071,"display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":3,"referenced_works":["https://openalex.org/W2351392266","https://openalex.org/W2364311255","https://openalex.org/W2366054180"],"related_works":["https://openalex.org/W3008339103","https://openalex.org/W2404647514","https://openalex.org/W1667647204","https://openalex.org/W4247536566","https://openalex.org/W3119814709","https://openalex.org/W2018477250","https://openalex.org/W1508895727","https://openalex.org/W4241418540","https://openalex.org/W2725786787","https://openalex.org/W4283160672"],"abstract_inverted_index":{"The":[0,20,62,83,115,150],"power":[1,71,84,88,148],"system":[2],"with":[3,90],"multiple":[4,45],"energy":[5,23,33,40,46,92,103],"sources":[6,47],"has":[7,64,152],"complicated":[8],"mathematic":[9],"models,":[10],"numerous":[11],"variables,":[12],"long":[13],"simulation":[14,55,128],"time":[15,53,126],"and":[16,35,72,80,98,130,137,156],"high":[17],"computing":[18,119],"requirements.":[19],"existing":[21],"electric":[22,39,102],"monthly":[24,41,104,147,163],"trade":[25,42,105,164],"schedules":[26],"study":[27],"only":[28],"on":[29,50],"one":[30],"single":[31],"conventional":[32,73],"resource":[34],"cannot":[36],"solve":[37],"the":[38,52,66,87,99,109,118,122,125,131,134,139,142],"schedule":[43,106],"incorporating":[44],"effectively.":[48],"Based":[49],"this,":[51],"sequential":[54,127],"method":[56,63],"is":[57,93,113],"proposed":[58],"in":[59],"this":[60],"paper.":[61],"considered":[65],"output":[67],"characteristics":[68,79],"of":[69,86,101,117,124,133,141,146],"wind":[70],"units,":[74],"load":[75],"characteristics,":[76],"unit":[77],"peaking":[78],"start-up":[81],"mode.":[82],"balance":[85],"grid":[89],"new":[91],"optimized":[94],"hour":[95,97],"by":[96],"model":[100,129,151],"that":[107],"meets":[108],"energy-saving":[110],"generation":[111],"dispatching":[112],"established.":[114],"result":[116],"example":[120],"verifies":[121],"rationality":[123],"correctness":[132],"theoretical":[135],"analysis":[136],"achieves":[138],"target":[140],"lowest":[143],"integrative":[144],"cost":[145],"generation.":[149],"strong":[153],"social":[154],"benefits":[155],"can":[157],"provide":[158],"a":[159],"reference":[160],"for":[161],"making":[162],"schedule.":[165]},"counts_by_year":[],"updated_date":"2026-07-29T14:22:42.915294","created_date":"2025-10-10T00:00:00"}
