{"id":"https://openalex.org/W4391093929","doi":"https://doi.org/10.1109/iciscae59047.2023.10392832","title":"Research on Adjustable Load Optimization Control Strategy Based on Multidimensional Operating Characteristics","display_name":"Research on Adjustable Load Optimization Control Strategy Based on Multidimensional Operating Characteristics","publication_year":2023,"publication_date":"2023-09-23","ids":{"openalex":"https://openalex.org/W4391093929","doi":"https://doi.org/10.1109/iciscae59047.2023.10392832"},"language":"en","primary_location":{"id":"doi:10.1109/iciscae59047.2023.10392832","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iciscae59047.2023.10392832","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE 6th International Conference on Information Systems and Computer Aided Education (ICISCAE)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5093760169","display_name":"Wang Weishuai","orcid":null},"institutions":[{"id":"https://openalex.org/I4210126065","display_name":"Shanghai Electric (China)","ror":"https://ror.org/0314qy595","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210126065"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Wang Weishuai","raw_affiliation_strings":["State Grid Shandong Electric Power Company,Marketing Department,Shandong,Jinan,China,250001"],"affiliations":[{"raw_affiliation_string":"State Grid Shandong Electric Power Company,Marketing Department,Shandong,Jinan,China,250001","institution_ids":["https://openalex.org/I4210126065"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5021298710","display_name":"Haijing Zhang","orcid":"https://orcid.org/0000-0002-3305-2507"},"institutions":[{"id":"https://openalex.org/I4210126065","display_name":"Shanghai Electric (China)","ror":"https://ror.org/0314qy595","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210126065"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Zhang Haijing","raw_affiliation_strings":["State Grid Shandong Electric Power Company,Marketing Service Center,Shandong,Jinan,China,250001"],"affiliations":[{"raw_affiliation_string":"State Grid Shandong Electric Power Company,Marketing Service Center,Shandong,Jinan,China,250001","institution_ids":["https://openalex.org/I4210126065"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5079570369","display_name":"Jia Pan","orcid":null},"institutions":[{"id":"https://openalex.org/I17442442","display_name":"State Grid Corporation of China (China)","ror":"https://ror.org/05twwhs70","country_code":"CN","type":"company","lineage":["https://openalex.org/I17442442"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Pan Jia","raw_affiliation_strings":["State Grid Laiwu Power Supply Company,Marketing Service Center,Shandong,Jinan,China,250001"],"affiliations":[{"raw_affiliation_string":"State Grid Laiwu Power Supply Company,Marketing Service Center,Shandong,Jinan,China,250001","institution_ids":["https://openalex.org/I17442442"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5101507800","display_name":"Xiangyu Zhou","orcid":"https://orcid.org/0000-0001-9351-936X"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Zhou Xiangyu","raw_affiliation_strings":["State Grid Jining Power Supply Company,Marketing Service Center,Shandong,Jinan,China,272001"],"affiliations":[{"raw_affiliation_string":"State Grid Jining Power Supply Company,Marketing Service Center,Shandong,Jinan,China,272001","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5037118904","display_name":"Feng Yankun","orcid":null},"institutions":[{"id":"https://openalex.org/I4210126065","display_name":"Shanghai Electric (China)","ror":"https://ror.org/0314qy595","country_code":"CN","type":"company","lineage":["https://openalex.org/I4210126065"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Feng Yankun","raw_affiliation_strings":["State Grid Shandong Electric Power Company,Marketing Service Center,Shandong,Jinan,China,250001"],"affiliations":[{"raw_affiliation_string":"State Grid Shandong Electric Power Company,Marketing Service Center,Shandong,Jinan,China,250001","institution_ids":["https://openalex.org/I4210126065"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":5,"corresponding_author_ids":["https://openalex.org/A5093760169"],"corresponding_institution_ids":["https://openalex.org/I4210126065"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.18187237,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"49","issue":null,"first_page":"666","last_page":"671"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9753000140190125,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9753000140190125,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9431999921798706,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T14444","display_name":"Power Systems and Renewable Energy","score":0.9340000152587891,"subfield":{"id":"https://openalex.org/subfields/2102","display_name":"Energy Engineering and Power Technology"},"field":{"id":"https://openalex.org/fields/21","display_name":"Energy"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/peaking-power-plant","display_name":"Peaking power plant","score":0.7022431492805481},{"id":"https://openalex.org/keywords/load-regulation","display_name":"Load regulation","score":0.7003058791160583},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5864967107772827},{"id":"https://openalex.org/keywords/load-balancing","display_name":"Load balancing (electrical power)","score":0.5447552800178528},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.490508496761322},{"id":"https://openalex.org/keywords/load-management","display_name":"Load management","score":0.4885607659816742},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.4824960231781006},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.4670965075492859},{"id":"https://openalex.org/keywords/base-load-power-plant","display_name":"Base load power plant","score":0.4504264295101166},{"id":"https://openalex.org/keywords/automatic-frequency-control","display_name":"Automatic frequency control","score":0.4113852083683014},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.3652890920639038},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.3634059429168701},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.27811723947525024},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.23436489701271057},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.2136441469192505},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.09667211771011353}],"concepts":[{"id":"https://openalex.org/C154594046","wikidata":"https://www.wikidata.org/wiki/Q18979989","display_name":"Peaking power plant","level":4,"score":0.7022431492805481},{"id":"https://openalex.org/C2776098794","wikidata":"https://www.wikidata.org/wiki/Q6663315","display_name":"Load regulation","level":3,"score":0.7003058791160583},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5864967107772827},{"id":"https://openalex.org/C138959212","wikidata":"https://www.wikidata.org/wiki/Q1806783","display_name":"Load balancing (electrical power)","level":3,"score":0.5447552800178528},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.490508496761322},{"id":"https://openalex.org/C2779370713","wikidata":"https://www.wikidata.org/wiki/Q357554","display_name":"Load management","level":2,"score":0.4885607659816742},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.4824960231781006},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.4670965075492859},{"id":"https://openalex.org/C123153844","wikidata":"https://www.wikidata.org/wiki/Q360897","display_name":"Base load power plant","level":4,"score":0.4504264295101166},{"id":"https://openalex.org/C25915539","wikidata":"https://www.wikidata.org/wiki/Q220786","display_name":"Automatic frequency control","level":2,"score":0.4113852083683014},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.3652890920639038},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.3634059429168701},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.27811723947525024},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.23436489701271057},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.2136441469192505},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.09667211771011353},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0},{"id":"https://openalex.org/C76155785","wikidata":"https://www.wikidata.org/wiki/Q418","display_name":"Telecommunications","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/iciscae59047.2023.10392832","is_oa":false,"landing_page_url":"http://dx.doi.org/10.1109/iciscae59047.2023.10392832","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2023 IEEE 6th International Conference on Information Systems and Computer Aided Education (ICISCAE)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.6700000166893005,"display_name":"Affordable and clean energy","id":"https://metadata.un.org/sdg/7"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":0,"referenced_works":[],"related_works":["https://openalex.org/W92211312","https://openalex.org/W2385272050","https://openalex.org/W3118953844","https://openalex.org/W2394127586","https://openalex.org/W3156022047","https://openalex.org/W4361013327","https://openalex.org/W2908503835","https://openalex.org/W2320815718","https://openalex.org/W3011915179","https://openalex.org/W2970491055"],"abstract_inverted_index":{"The":[0],"implementation":[1],"of":[2,10,28,36,49,76,85,95,105,169,177],"the":[3,8,11,24,29,33,47,56,82,91,96,99,111,174,178],"\"dual":[4],"carbon\"":[5],"policy":[6],"promotes":[7],"transformation":[9],"power":[12,30,51,77,120,166],"grid":[13],"towards":[14],"\"source":[15],"network":[16],"load":[17,20,64,86,106,127,149,170,186],"storage\".":[18],"Adjustable":[19],"can":[21,161],"effectively":[22],"expand":[23],"peak":[25,196],"shaving":[26],"resources":[27,88,108,172],"grid,":[31],"improve":[32],"consumption":[34],"space":[35],"new":[37,50,74],"energy":[38],"such":[39,140,194],"as":[40,141,195],"wind":[41],"and":[42,44,102,144,164,200],"solar,":[43],"assist":[45],"in":[46,72,90,110,173,190],"construction":[48],"systems.":[52],"In":[53],"response":[54,100],"to":[55,125,154],"above":[57],"issues,":[58],"this":[59],"article":[60],"proposes":[61],"an":[62,118,134,147],"adjustable":[63,148],"optimization":[65,150],"control":[66,93,114,121,151,168],"strategy":[67,152],"with":[68],"multi-dimensional":[69,155],"operating":[70,156],"characteristics":[71,101,157],"a":[73],"type":[75],"system.":[78],"Firstly,":[79],"based":[80,132],"on":[81,133],"actual":[83],"data":[84],"side":[87,107,171,187],"participating":[89,109],"closed-loop":[92,167],"operation":[94],"main":[97,112,179],"station,":[98,180],"regulation":[103],"performance":[104],"station":[113],"were":[115],"analyzed;":[116],"Secondly,":[117],"automatic":[119],"(APC)":[122],"architecture":[123],"adapted":[124,153],"source":[126],"storage":[128],"collaboration":[129],"was":[130,158],"constructed":[131],"aggregation":[135],"model;":[136],"Finally,":[137],"considering":[138],"factors":[139],"economy,":[142],"environment,":[143],"regulatory":[145],"technology,":[146],"proposed.":[159],"It":[160],"achieve":[162],"long-term":[163],"stable":[165],"APC":[175],"module":[176],"providing":[181],"technical":[182],"support":[183],"for":[184],"subsequent":[185],"resource":[188],"participation":[189],"scheduling":[191],"business":[192],"scenarios":[193],"shaving,":[197],"frequency":[198],"regulation,":[199],"accident":[201],"handling.":[202]},"counts_by_year":[],"updated_date":"2025-12-21T01:58:51.020947","created_date":"2025-10-10T00:00:00"}
