{"id":"https://openalex.org/W1995924656","doi":"https://doi.org/10.1109/icc.2013.6655202","title":"Optimal power scheduling for green smart grids with renewable sources","display_name":"Optimal power scheduling for green smart grids with renewable sources","publication_year":2013,"publication_date":"2013-06-01","ids":{"openalex":"https://openalex.org/W1995924656","doi":"https://doi.org/10.1109/icc.2013.6655202","mag":"1995924656"},"language":"en","primary_location":{"id":"doi:10.1109/icc.2013.6655202","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icc.2013.6655202","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2013 IEEE International Conference on Communications (ICC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5009050583","display_name":"Nihan \u00c7i\u00e7ek","orcid":null},"institutions":[{"id":"https://openalex.org/I4405392","display_name":"Bo\u011fazi\u00e7i University","ror":"https://ror.org/03z9tma90","country_code":"TR","type":"education","lineage":["https://openalex.org/I4405392"]}],"countries":["TR"],"is_corresponding":true,"raw_author_name":"Nihan Cicek","raw_affiliation_strings":["Bogazici Universitesi, Istanbul, TR","Dept. of Electr. & Electron. Eng., Bogazici Univ., I\u0301stanbul, Turkey"],"affiliations":[{"raw_affiliation_string":"Bogazici Universitesi, Istanbul, TR","institution_ids":["https://openalex.org/I4405392"]},{"raw_affiliation_string":"Dept. of Electr. & Electron. Eng., Bogazici Univ., I\u0301stanbul, Turkey","institution_ids":["https://openalex.org/I4405392"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5108505608","display_name":"H. Deli\u00e7","orcid":null},"institutions":[{"id":"https://openalex.org/I4405392","display_name":"Bo\u011fazi\u00e7i University","ror":"https://ror.org/03z9tma90","country_code":"TR","type":"education","lineage":["https://openalex.org/I4405392"]}],"countries":["TR"],"is_corresponding":false,"raw_author_name":"Hakan Delic","raw_affiliation_strings":["Department of Electrical and Electronics Engineering, Bo\u011fazi\u00e7i University, Istanbul, Turkey","Dept. of Electr. & Electron. Eng., Bogazici Univ., I\u0301stanbul, Turkey"],"affiliations":[{"raw_affiliation_string":"Department of Electrical and Electronics Engineering, Bo\u011fazi\u00e7i University, Istanbul, Turkey","institution_ids":["https://openalex.org/I4405392"]},{"raw_affiliation_string":"Dept. of Electr. & Electron. Eng., Bogazici Univ., I\u0301stanbul, Turkey","institution_ids":["https://openalex.org/I4405392"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5009050583"],"corresponding_institution_ids":["https://openalex.org/I4405392"],"apc_list":null,"apc_paid":null,"fwci":0.9458,"has_fulltext":false,"cited_by_count":5,"citation_normalized_percentile":{"value":0.77565818,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":97},"biblio":{"volume":null,"issue":null,"first_page":"4094","last_page":"4098"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10768","display_name":"Electric Vehicles and Infrastructure","score":0.9966999888420105,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9934999942779541,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.8437837362289429},{"id":"https://openalex.org/keywords/smart-grid","display_name":"Smart grid","score":0.6609432101249695},{"id":"https://openalex.org/keywords/wind-power","display_name":"Wind power","score":0.6489238142967224},{"id":"https://openalex.org/keywords/environmental-economics","display_name":"Environmental economics","score":0.5496349334716797},{"id":"https://openalex.org/keywords/intermittent-energy-source","display_name":"Intermittent energy source","score":0.5343586206436157},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5202304720878601},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.5003645420074463},{"id":"https://openalex.org/keywords/production","display_name":"Production (economics)","score":0.4890921711921692},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.4853874444961548},{"id":"https://openalex.org/keywords/limiting","display_name":"Limiting","score":0.4759630560874939},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.46032869815826416},{"id":"https://openalex.org/keywords/grid-parity","display_name":"Grid parity","score":0.42726534605026245},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.33891165256500244},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.3306824564933777},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.30468377470970154},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.24048393964767456},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.20758125185966492},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.20694229006767273},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.18280091881752014},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.17993870377540588},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.11177191138267517}],"concepts":[{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.8437837362289429},{"id":"https://openalex.org/C10558101","wikidata":"https://www.wikidata.org/wiki/Q689855","display_name":"Smart grid","level":2,"score":0.6609432101249695},{"id":"https://openalex.org/C78600449","wikidata":"https://www.wikidata.org/wiki/Q43302","display_name":"Wind power","level":2,"score":0.6489238142967224},{"id":"https://openalex.org/C134560507","wikidata":"https://www.wikidata.org/wiki/Q753291","display_name":"Environmental economics","level":1,"score":0.5496349334716797},{"id":"https://openalex.org/C121119573","wikidata":"https://www.wikidata.org/wiki/Q7915732","display_name":"Intermittent energy source","level":4,"score":0.5343586206436157},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5202304720878601},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.5003645420074463},{"id":"https://openalex.org/C2778348673","wikidata":"https://www.wikidata.org/wiki/Q739302","display_name":"Production (economics)","level":2,"score":0.4890921711921692},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.4853874444961548},{"id":"https://openalex.org/C188198153","wikidata":"https://www.wikidata.org/wiki/Q1613840","display_name":"Limiting","level":2,"score":0.4759630560874939},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.46032869815826416},{"id":"https://openalex.org/C186503672","wikidata":"https://www.wikidata.org/wiki/Q761847","display_name":"Grid parity","level":4,"score":0.42726534605026245},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.33891165256500244},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.3306824564933777},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.30468377470970154},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.24048393964767456},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.20758125185966492},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.20694229006767273},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.18280091881752014},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.17993870377540588},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.11177191138267517},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/icc.2013.6655202","is_oa":false,"landing_page_url":"https://doi.org/10.1109/icc.2013.6655202","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2013 IEEE International Conference on Communications (ICC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","score":0.8600000143051147,"display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":13,"referenced_works":["https://openalex.org/W1528653255","https://openalex.org/W2045362395","https://openalex.org/W2050958060","https://openalex.org/W2054989445","https://openalex.org/W2061735481","https://openalex.org/W2086850772","https://openalex.org/W2152360460","https://openalex.org/W2494875982","https://openalex.org/W2798766386","https://openalex.org/W4250589301","https://openalex.org/W4396738453","https://openalex.org/W6641939000","https://openalex.org/W6666152390"],"related_works":["https://openalex.org/W1589973774","https://openalex.org/W2353074559","https://openalex.org/W2171108821","https://openalex.org/W2074513827","https://openalex.org/W2402141875","https://openalex.org/W1498762745","https://openalex.org/W148990555","https://openalex.org/W2023642087","https://openalex.org/W2593427583","https://openalex.org/W2136076430"],"abstract_inverted_index":{"In":[0],"this":[1],"paper,":[2],"we":[3],"study":[4],"demand":[5],"response":[6],"management":[7],"and":[8,33,40,71,74],"power":[9],"scheduling":[10],"in":[11,28,54,85],"a":[12,21,86],"smart":[13],"grid":[14],"with":[15],"renewable":[16,55],"energy":[17,36,48,69],"sources":[18],"represented":[19],"by":[20,59],"wind":[22,87],"farm.":[23,88],"Total":[24],"social":[25],"welfare,":[26],"defined":[27],"terms":[29],"of":[30,35,47,78],"consumer":[31],"utility":[32],"cost":[34],"production":[37,56,70],"(both":[38],"scheduled":[39],"renewable),":[41],"is":[42,57],"maximized":[43],"while":[44],"the":[45,52,65,76,79,83],"probability":[46],"shortfall":[49],"due":[50],"to":[51],"uncertainty":[53],"limited":[58],"an":[60],"upper":[61],"bound.":[62],"We":[63],"find":[64],"outage-limiting":[66],"optimal":[67],"conventional":[68],"consumption":[72],"schedules,":[73],"investigate":[75],"impact":[77],"statistical":[80],"relationship":[81],"between":[82],"turbines":[84]},"counts_by_year":[{"year":2018,"cited_by_count":1},{"year":2015,"cited_by_count":1},{"year":2014,"cited_by_count":3}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
