{"id":"https://openalex.org/W4411271211","doi":"https://doi.org/10.1109/ias55788.2024.11023833","title":"Deep Learning-Based Forecasting Approach for Virtual Power Plant's Bidding in Energy Market","display_name":"Deep Learning-Based Forecasting Approach for Virtual Power Plant's Bidding in Energy Market","publication_year":2024,"publication_date":"2024-10-20","ids":{"openalex":"https://openalex.org/W4411271211","doi":"https://doi.org/10.1109/ias55788.2024.11023833"},"language":"en","primary_location":{"id":"doi:10.1109/ias55788.2024.11023833","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ias55788.2024.11023833","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE Industry Applications Society Annual Meeting (IAS)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":true,"oa_status":"green","oa_url":"https://figshare.com/articles/conference_contribution/Deep_Learning-Based_Forecasting_Approach_for_Virtual_Power_Plant_s_Bidding_in_Energy_Market/29475698","any_repository_has_fulltext":true},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5070661377","display_name":"Khalil Gholami","orcid":"https://orcid.org/0000-0001-5666-4912"},"institutions":[{"id":"https://openalex.org/I149704539","display_name":"Deakin University","ror":"https://ror.org/02czsnj07","country_code":"AU","type":"education","lineage":["https://openalex.org/I149704539"]}],"countries":["AU"],"is_corresponding":false,"raw_author_name":"Khalil Gholami","raw_affiliation_strings":["School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216","institution_ids":["https://openalex.org/I149704539"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5026340328","display_name":"Mohammad Taufiqul Arif","orcid":"https://orcid.org/0000-0001-8071-3235"},"institutions":[{"id":"https://openalex.org/I149704539","display_name":"Deakin University","ror":"https://ror.org/02czsnj07","country_code":"AU","type":"education","lineage":["https://openalex.org/I149704539"]}],"countries":["AU"],"is_corresponding":false,"raw_author_name":"Mohammad Taufiqul Arif","raw_affiliation_strings":["School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216","institution_ids":["https://openalex.org/I149704539"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5080959197","display_name":"Md Enamul Haque","orcid":"https://orcid.org/0000-0002-8893-2181"},"institutions":[{"id":"https://openalex.org/I149704539","display_name":"Deakin University","ror":"https://ror.org/02czsnj07","country_code":"AU","type":"education","lineage":["https://openalex.org/I149704539"]}],"countries":["AU"],"is_corresponding":false,"raw_author_name":"Md Enamul Haque","raw_affiliation_strings":["School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Engineering, Deakin University,Renewable Energy and Electric Vehicle (REEV) Lab,Geelong,VIC,Australia,3216","institution_ids":["https://openalex.org/I149704539"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":1,"corresponding_author_ids":[],"corresponding_institution_ids":["https://openalex.org/I149704539"],"apc_list":null,"apc_paid":null,"fwci":0.1756,"has_fulltext":false,"cited_by_count":1,"citation_normalized_percentile":{"value":0.53760556,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":91,"max":95},"biblio":{"volume":null,"issue":null,"first_page":"1","last_page":"9"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9918000102043152,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.9918000102043152,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12451","display_name":"Smart Grid and Power Systems","score":0.9247999787330627,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/bidding","display_name":"Bidding","score":0.8695293664932251},{"id":"https://openalex.org/keywords/virtual-power-plant","display_name":"Virtual power plant","score":0.5749649405479431},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5744945406913757},{"id":"https://openalex.org/keywords/energy","display_name":"Energy (signal processing)","score":0.4589653015136719},{"id":"https://openalex.org/keywords/power-station","display_name":"Power station","score":0.43163591623306274},{"id":"https://openalex.org/keywords/power-market","display_name":"Power market","score":0.42391398549079895},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.4043439030647278},{"id":"https://openalex.org/keywords/artificial-intelligence","display_name":"Artificial intelligence","score":0.3359526991844177},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.2706323266029358},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.24142006039619446},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.2236635684967041},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.19170507788658142},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.16459381580352783},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.11121585965156555},{"id":"https://openalex.org/keywords/marketing","display_name":"Marketing","score":0.09671062231063843}],"concepts":[{"id":"https://openalex.org/C9233905","wikidata":"https://www.wikidata.org/wiki/Q3276328","display_name":"Bidding","level":2,"score":0.8695293664932251},{"id":"https://openalex.org/C2776033628","wikidata":"https://www.wikidata.org/wiki/Q785102","display_name":"Virtual power plant","level":4,"score":0.5749649405479431},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5744945406913757},{"id":"https://openalex.org/C186370098","wikidata":"https://www.wikidata.org/wiki/Q442787","display_name":"Energy (signal processing)","level":2,"score":0.4589653015136719},{"id":"https://openalex.org/C4311470","wikidata":"https://www.wikidata.org/wiki/Q159719","display_name":"Power station","level":2,"score":0.43163591623306274},{"id":"https://openalex.org/C2989491980","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Power market","level":4,"score":0.42391398549079895},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.4043439030647278},{"id":"https://openalex.org/C154945302","wikidata":"https://www.wikidata.org/wiki/Q11660","display_name":"Artificial intelligence","level":1,"score":0.3359526991844177},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.2706323266029358},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.24142006039619446},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.2236635684967041},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.19170507788658142},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.16459381580352783},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.11121585965156555},{"id":"https://openalex.org/C162853370","wikidata":"https://www.wikidata.org/wiki/Q39809","display_name":"Marketing","level":1,"score":0.09671062231063843},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0},{"id":"https://openalex.org/C105795698","wikidata":"https://www.wikidata.org/wiki/Q12483","display_name":"Statistics","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":2,"locations":[{"id":"doi:10.1109/ias55788.2024.11023833","is_oa":false,"landing_page_url":"https://doi.org/10.1109/ias55788.2024.11023833","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2024 IEEE Industry Applications Society Annual Meeting (IAS)","raw_type":"proceedings-article"},{"id":"pmh:oai:figshare.com:article/29475698","is_oa":true,"landing_page_url":"https://figshare.com/articles/conference_contribution/Deep_Learning-Based_Forecasting_Approach_for_Virtual_Power_Plant_s_Bidding_in_Energy_Market/29475698","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"Conference contribution"}],"best_oa_location":{"id":"pmh:oai:figshare.com:article/29475698","is_oa":true,"landing_page_url":"https://figshare.com/articles/conference_contribution/Deep_Learning-Based_Forecasting_Approach_for_Virtual_Power_Plant_s_Bidding_in_Energy_Market/29475698","pdf_url":null,"source":{"id":"https://openalex.org/S4377196282","display_name":"Figshare","issn_l":null,"issn":null,"is_oa":false,"is_in_doaj":false,"is_core":false,"host_organization":"https://openalex.org/I4210132348","host_organization_name":"Figshare (United Kingdom)","host_organization_lineage":["https://openalex.org/I4210132348"],"host_organization_lineage_names":[],"type":"repository"},"license":null,"license_id":null,"version":"submittedVersion","is_accepted":false,"is_published":false,"raw_source_name":null,"raw_type":"Conference contribution"},"sustainable_development_goals":[{"score":0.7900000214576721,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":28,"referenced_works":["https://openalex.org/W2042413043","https://openalex.org/W2072476502","https://openalex.org/W2133813085","https://openalex.org/W2165046071","https://openalex.org/W2175287745","https://openalex.org/W2176950688","https://openalex.org/W2231928583","https://openalex.org/W2329751680","https://openalex.org/W2614878903","https://openalex.org/W2807252330","https://openalex.org/W2898880479","https://openalex.org/W2964236680","https://openalex.org/W2989606762","https://openalex.org/W3025729908","https://openalex.org/W3047624537","https://openalex.org/W3110416675","https://openalex.org/W3112335786","https://openalex.org/W3127943096","https://openalex.org/W3132166193","https://openalex.org/W3162118020","https://openalex.org/W4200421523","https://openalex.org/W4213351349","https://openalex.org/W4281256749","https://openalex.org/W4303439001","https://openalex.org/W4310387050","https://openalex.org/W4311220709","https://openalex.org/W4316663540","https://openalex.org/W4375858458"],"related_works":["https://openalex.org/W2245406602","https://openalex.org/W2567441685","https://openalex.org/W4312662765","https://openalex.org/W3012597396","https://openalex.org/W2365433587","https://openalex.org/W2388860747","https://openalex.org/W2366768553","https://openalex.org/W2365307513","https://openalex.org/W2363924687","https://openalex.org/W4389077665"],"abstract_inverted_index":{"Managing":[0],"diverse":[1],"distributed":[2],"energy":[3,74],"resources":[4,54],"(DERs)":[5],"individually":[6],"is":[7,55],"not":[8],"feasible.":[9],"Therefore,":[10],"the":[11,40,97,112,134],"concept":[12],"of":[13,52,136],"a":[14,22,60,103],"virtual":[15],"power":[16,42],"plant":[17],"(VPP)":[18],"has":[19],"emerged,":[20],"allowing":[21],"unified":[23],"entity":[24],"to":[25,30,45,84,94,109],"participate":[26],"in":[27,96,139],"electricity":[28],"markets":[29],"optimize":[31],"profit.":[32],"However,":[33],"inaccurate":[34],"biddings":[35],"by":[36],"VPP":[37,53,113,143],"can":[38],"disrupt":[39],"overall":[41],"balance,":[43],"leading":[44],"penalties.":[46],"To":[47],"address":[48],"this,":[49],"accurate":[50],"forecasting":[51,68,86,140],"important.":[56],"This":[57],"study":[58],"proposes":[59],"hybrid":[61],"approach":[62],"based":[63,101],"on":[64,102],"deep":[65,137],"learning":[66,138],"for":[67],"uncertain":[69],"parameters":[70,90],"like":[71],"renewable":[72],"output,":[73],"price,":[75],"and":[76,120,123,141],"load,":[77],"coupled":[78],"with":[79,127,145],"Monte":[80],"Carlo":[81],"Simulation":[82],"(MCS)":[83],"minimize":[85],"errors.":[87],"These":[88],"forecasted":[89],"are":[91],"then":[92],"used":[93],"feed":[95],"developed":[98],"bidding":[99],"strategy":[100],"mixed":[104],"integer":[105],"linear":[106],"programming":[107,130],"(MILP)":[108],"effectively":[110],"schedule":[111],"resources,":[114],"including":[115],"photovoltaic":[116],"(PV),":[117],"battery":[118],"storage,":[119],"vehicle-to-grid":[121],"(V2G)":[122],"grid-to-vehicle":[124],"(G2V)":[125],"technologies":[126],"demand":[128],"response":[129],"(DRP).":[131],"Results":[132],"demonstrate":[133],"superiority":[135],"increased":[142],"profitability":[144],"storage":[146],"facility":[147],"integration.":[148]},"counts_by_year":[{"year":2025,"cited_by_count":1}],"updated_date":"2026-07-02T09:51:11.867554","created_date":"2025-10-10T00:00:00"}
