{"id":"https://openalex.org/W2150441806","doi":"https://doi.org/10.1109/hicss.2004.1265170","title":"The role of demand underscheduling in the California energy crisis","display_name":"The role of demand underscheduling in the California energy crisis","publication_year":2004,"publication_date":"2004-01-01","ids":{"openalex":"https://openalex.org/W2150441806","doi":"https://doi.org/10.1109/hicss.2004.1265170","mag":"2150441806"},"language":"en","primary_location":{"id":"doi:10.1109/hicss.2004.1265170","is_oa":false,"landing_page_url":"https://doi.org/10.1109/hicss.2004.1265170","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"37th Annual Hawaii International Conference on System Sciences, 2004. Proceedings of the","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5002029239","display_name":"Ezra Hausman","orcid":null},"institutions":[],"countries":[],"is_corresponding":true,"raw_author_name":"E.D. Hausman","raw_affiliation_strings":["Tabors Caramanis and Associates, Cambridge, MA, USA"],"affiliations":[{"raw_affiliation_string":"Tabors Caramanis and Associates, Cambridge, MA, USA","institution_ids":[]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5087283246","display_name":"Richard D. Tabors","orcid":"https://orcid.org/0000-0002-4108-3901"},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"R.D. Tabors","raw_affiliation_strings":["Tabors Caramanis and Associates, Cambridge, MA, USA"],"affiliations":[{"raw_affiliation_string":"Tabors Caramanis and Associates, Cambridge, MA, USA","institution_ids":[]}]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5002029239"],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.6583,"has_fulltext":false,"cited_by_count":11,"citation_normalized_percentile":{"value":0.73366205,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":94},"biblio":{"volume":null,"issue":null,"first_page":"8 pp.","last_page":"8 pp."},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9948999881744385,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9948999881744385,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10603","display_name":"Smart Grid Energy Management","score":0.9706000089645386,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/bidding","display_name":"Bidding","score":0.8983258008956909},{"id":"https://openalex.org/keywords/demand-response","display_name":"Demand response","score":0.5894530415534973},{"id":"https://openalex.org/keywords/electricity-market","display_name":"Electricity market","score":0.5117099285125732},{"id":"https://openalex.org/keywords/supply-and-demand","display_name":"Supply and demand","score":0.47896912693977356},{"id":"https://openalex.org/keywords/market-demand-schedule","display_name":"Market demand schedule","score":0.47250092029571533},{"id":"https://openalex.org/keywords/economics","display_name":"Economics","score":0.46202215552330017},{"id":"https://openalex.org/keywords/electricity","display_name":"Electricity","score":0.4321635663509369},{"id":"https://openalex.org/keywords/state","display_name":"State (computer science)","score":0.4175354242324829},{"id":"https://openalex.org/keywords/service","display_name":"Service (business)","score":0.4163738787174225},{"id":"https://openalex.org/keywords/business","display_name":"Business","score":0.37876537442207336},{"id":"https://openalex.org/keywords/microeconomics","display_name":"Microeconomics","score":0.35187265276908875},{"id":"https://openalex.org/keywords/economy","display_name":"Economy","score":0.2697586417198181},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.17438924312591553},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.10350346565246582}],"concepts":[{"id":"https://openalex.org/C9233905","wikidata":"https://www.wikidata.org/wiki/Q3276328","display_name":"Bidding","level":2,"score":0.8983258008956909},{"id":"https://openalex.org/C2779438525","wikidata":"https://www.wikidata.org/wiki/Q5255048","display_name":"Demand response","level":3,"score":0.5894530415534973},{"id":"https://openalex.org/C146733006","wikidata":"https://www.wikidata.org/wiki/Q676081","display_name":"Electricity market","level":3,"score":0.5117099285125732},{"id":"https://openalex.org/C120330832","wikidata":"https://www.wikidata.org/wiki/Q166656","display_name":"Supply and demand","level":2,"score":0.47896912693977356},{"id":"https://openalex.org/C97949498","wikidata":"https://www.wikidata.org/wiki/Q6770793","display_name":"Market demand schedule","level":3,"score":0.47250092029571533},{"id":"https://openalex.org/C162324750","wikidata":"https://www.wikidata.org/wiki/Q8134","display_name":"Economics","level":0,"score":0.46202215552330017},{"id":"https://openalex.org/C206658404","wikidata":"https://www.wikidata.org/wiki/Q12725","display_name":"Electricity","level":2,"score":0.4321635663509369},{"id":"https://openalex.org/C48103436","wikidata":"https://www.wikidata.org/wiki/Q599031","display_name":"State (computer science)","level":2,"score":0.4175354242324829},{"id":"https://openalex.org/C2780378061","wikidata":"https://www.wikidata.org/wiki/Q25351891","display_name":"Service (business)","level":2,"score":0.4163738787174225},{"id":"https://openalex.org/C144133560","wikidata":"https://www.wikidata.org/wiki/Q4830453","display_name":"Business","level":0,"score":0.37876537442207336},{"id":"https://openalex.org/C175444787","wikidata":"https://www.wikidata.org/wiki/Q39072","display_name":"Microeconomics","level":1,"score":0.35187265276908875},{"id":"https://openalex.org/C136264566","wikidata":"https://www.wikidata.org/wiki/Q159810","display_name":"Economy","level":1,"score":0.2697586417198181},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.17438924312591553},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.10350346565246582},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.0},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/hicss.2004.1265170","is_oa":false,"landing_page_url":"https://doi.org/10.1109/hicss.2004.1265170","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"37th Annual Hawaii International Conference on System Sciences, 2004. Proceedings of the","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.6600000262260437,"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":2,"referenced_works":["https://openalex.org/W1549769376","https://openalex.org/W2090275300"],"related_works":["https://openalex.org/W2123877516","https://openalex.org/W1639452795","https://openalex.org/W2020695226","https://openalex.org/W2101944206","https://openalex.org/W1869667948","https://openalex.org/W2157851644","https://openalex.org/W2186549895","https://openalex.org/W2895824344","https://openalex.org/W2010668661","https://openalex.org/W2307742935"],"abstract_inverted_index":{"The":[0,93,110,153],"lack":[1],"of":[2,29,69,75,88,95,103,116,123,135,147,160,173,197],"demand":[3,72,125,137,149],"response":[4],"to":[5,99,132,143,178,185,203],"rapidly":[6],"increasing":[7],"prices":[8],"in":[9,14,26,36,46,50,175],"the":[10,27,44,51,58,67,70,83,89,101,108,119,133,139,144,151,157,161,165,183,186,195,198],"California":[11,90,162,205],"electricity":[12,91],"market":[13,31,48,199],"2000":[15],"and":[16,53,62,85,121],"early":[17],"2001":[18],"has":[19],"been":[20],"identified":[21],"as":[22],"one":[23],"significant":[24],"factor":[25],"descent":[28],"that":[30,127,148,156],"into":[32],"dysfunction.":[33],"Only":[34],"consumers":[35],"San":[37],"Diego":[38],"saw":[39,55],"their":[40,176],"bills":[41],"increase":[42,45],"with":[43],"spot":[47],"costs":[49],"state,":[52],"they":[54],"it":[56],"after":[57],"fact.":[59],"Less":[60],"noticed":[61],"now":[63],"hotly":[64],"denied":[65],"was":[66,164,191,212],"effect":[68],"day-ahead":[71,184],"bidding":[73,105,122,171],"behavior":[74,106,172],"Pacific":[76],"Gas":[77],"&":[78],"Electric":[79],"(PG&E),":[80],"specifically,":[81],"on":[82],"disequilibrium":[84],"ultimate":[86],"collapse":[87],"market.":[92,188],"objective":[94],"this":[96],"paper":[97,111,154],"is":[98],"evaluate":[100],"impact":[102,211],"PG&E's":[104,114],"during":[107],"crisis.":[109],"will":[112],"examine":[113],"underscheduling":[115],"load":[117],"through":[118],"creation":[120],"hourly":[124],"curves":[126],"bore":[128],"no":[129],"relation":[130],"either":[131],"realities":[134],"inelastic":[136],"within":[138,150],"service":[140],"territory":[141],"or":[142,206],"spatial":[145],"distribution":[146],"state.":[152],"concludes":[155],"silent":[158],"initiator":[159],"crisis":[163],"economically":[166],"rational,":[167],"but":[168],"structurally":[169],"destabilizing,":[170],"PG&E":[174],"effort":[177],"shift":[179,190],"purchased":[180],"energy":[181],"from":[182],"real-time":[187],"This":[189],"neither":[192],"anticipated":[193],"by":[194,204],"designers":[196],"nor":[200],"effectively":[201],"responded":[202],"Federal":[207],"regulators":[208],"when":[209],"its":[210],"identified.":[213]},"counts_by_year":[{"year":2023,"cited_by_count":1},{"year":2021,"cited_by_count":1},{"year":2018,"cited_by_count":1},{"year":2017,"cited_by_count":1},{"year":2016,"cited_by_count":1},{"year":2015,"cited_by_count":1},{"year":2014,"cited_by_count":1}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
