{"id":"https://openalex.org/W2111040841","doi":"https://doi.org/10.1109/emeit.2011.6023447","title":"An approach to scheduling of flexible manufacturing system","display_name":"An approach to scheduling of flexible manufacturing system","publication_year":2011,"publication_date":"2011-08-01","ids":{"openalex":"https://openalex.org/W2111040841","doi":"https://doi.org/10.1109/emeit.2011.6023447","mag":"2111040841"},"language":"en","primary_location":{"id":"doi:10.1109/emeit.2011.6023447","is_oa":false,"landing_page_url":"https://doi.org/10.1109/emeit.2011.6023447","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of 2011 International Conference on Electronic &amp; Mechanical Engineering and Information Technology","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":null,"display_name":"Liangwen Liu","orcid":null},"institutions":[{"id":"https://openalex.org/I134626604","display_name":"Jiujiang University","ror":"https://ror.org/0066vpg85","country_code":"CN","type":"education","lineage":["https://openalex.org/I134626604"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Liangwen Liu","raw_affiliation_strings":["School of Mechanical and Materials Engineering, Jiujiang University, Jiujiang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"School of Mechanical and Materials Engineering, Jiujiang University, Jiujiang, China","institution_ids":["https://openalex.org/I134626604"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5072407037","display_name":"Jianxiong Ye","orcid":"https://orcid.org/0000-0003-2744-6259"},"institutions":[{"id":"https://openalex.org/I141103825","display_name":"Jiangxi University of Water Resources and Electric Power","ror":"https://ror.org/00avfj807","country_code":"CN","type":"education","lineage":["https://openalex.org/I141103825"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Jianxiong Ye","raw_affiliation_strings":["College of Mechanical and Power Engineering, Nanchang Institute of Technology, Nanchang, China"],"raw_orcid":null,"affiliations":[{"raw_affiliation_string":"College of Mechanical and Power Engineering, Nanchang Institute of Technology, Nanchang, China","institution_ids":["https://openalex.org/I141103825"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":2,"citation_normalized_percentile":{"value":0.21534049,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":94},"biblio":{"volume":"6","issue":null,"first_page":"1777","last_page":"1779"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9991999864578247,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9991999864578247,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9901000261306763,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9850000143051147,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/fixture","display_name":"Fixture","score":0.8098529577255249},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6643893718719482},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6522351503372192},{"id":"https://openalex.org/keywords/queue","display_name":"Queue","score":0.6492905020713806},{"id":"https://openalex.org/keywords/machining","display_name":"Machining","score":0.6471353769302368},{"id":"https://openalex.org/keywords/dynamic-priority-scheduling","display_name":"Dynamic priority scheduling","score":0.5519400238990784},{"id":"https://openalex.org/keywords/group-technology","display_name":"Group technology","score":0.5144088864326477},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.49732640385627747},{"id":"https://openalex.org/keywords/flexible-manufacturing-system","display_name":"Flexible manufacturing system","score":0.4523221254348755},{"id":"https://openalex.org/keywords/fair-share-scheduling","display_name":"Fair-share scheduling","score":0.44170430302619934},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.4104290306568146},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.38731616735458374},{"id":"https://openalex.org/keywords/distributed-computing","display_name":"Distributed computing","score":0.349004328250885},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.2620036005973816},{"id":"https://openalex.org/keywords/mechanical-engineering","display_name":"Mechanical engineering","score":0.19067177176475525},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.11786127090454102},{"id":"https://openalex.org/keywords/computer-network","display_name":"Computer network","score":0.08242353796958923},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.07760712504386902},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.0758199691772461}],"concepts":[{"id":"https://openalex.org/C2781122048","wikidata":"https://www.wikidata.org/wiki/Q15983064","display_name":"Fixture","level":2,"score":0.8098529577255249},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6643893718719482},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6522351503372192},{"id":"https://openalex.org/C160403385","wikidata":"https://www.wikidata.org/wiki/Q220543","display_name":"Queue","level":2,"score":0.6492905020713806},{"id":"https://openalex.org/C523214423","wikidata":"https://www.wikidata.org/wiki/Q192047","display_name":"Machining","level":2,"score":0.6471353769302368},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.5519400238990784},{"id":"https://openalex.org/C2780443747","wikidata":"https://www.wikidata.org/wiki/Q3516922","display_name":"Group technology","level":2,"score":0.5144088864326477},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.49732640385627747},{"id":"https://openalex.org/C2777869240","wikidata":"https://www.wikidata.org/wiki/Q1424398","display_name":"Flexible manufacturing system","level":3,"score":0.4523221254348755},{"id":"https://openalex.org/C31689143","wikidata":"https://www.wikidata.org/wiki/Q733809","display_name":"Fair-share scheduling","level":3,"score":0.44170430302619934},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.4104290306568146},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.38731616735458374},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.349004328250885},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.2620036005973816},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.19067177176475525},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.11786127090454102},{"id":"https://openalex.org/C31258907","wikidata":"https://www.wikidata.org/wiki/Q1301371","display_name":"Computer network","level":1,"score":0.08242353796958923},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.07760712504386902},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.0758199691772461}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/emeit.2011.6023447","is_oa":false,"landing_page_url":"https://doi.org/10.1109/emeit.2011.6023447","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"Proceedings of 2011 International Conference on Electronic &amp; Mechanical Engineering and Information Technology","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"display_name":"Industry, innovation and infrastructure","id":"https://metadata.un.org/sdg/9","score":0.5699999928474426}],"awards":[],"funders":[{"id":"https://openalex.org/F4320325626","display_name":"Education Department of Jiangxi Province","ror":null}],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":5,"referenced_works":["https://openalex.org/W305419852","https://openalex.org/W2082543976","https://openalex.org/W2108767121","https://openalex.org/W2366358499","https://openalex.org/W7015287761"],"related_works":["https://openalex.org/W2184166483","https://openalex.org/W2397293317","https://openalex.org/W2368373244","https://openalex.org/W2377713709","https://openalex.org/W2373973180","https://openalex.org/W2372008037","https://openalex.org/W2978148977","https://openalex.org/W3003077338","https://openalex.org/W2225350526","https://openalex.org/W1545991362"],"abstract_inverted_index":{"FMS":[0],"(Flexible":[1],"manufacturing":[2,56],"system)":[3],"scheduling":[4,30],"is":[5],"the":[6,13,17,29,48,55,59,77],"center":[7],"of":[8,16,62],"its":[9],"management":[10],"owing":[11],"to":[12,38,42,46,52,71],"dynamic":[14],"nature":[15],"system.":[18],"Besides":[19],"loading":[20],"and":[21,25,69,85],"discharging":[22],"cutting":[23],"tools":[24],"jig":[26],"&":[27],"fixture,":[28],"mainly":[31],"deals":[32],"with":[33],"these":[34,72],"optimal":[35],"questions:":[36],"how":[37,41,45,51],"choose":[39],"parts;":[40,44],"group":[43],"assign":[47],"system":[49],"load;":[50],"queue":[53],"up":[54],"procedures.":[57],"With":[58],"mathematical":[60],"model":[61],"machining":[63],"parts":[64],"having":[65],"been":[66],"established,":[67],"discussions":[68],"solutions":[70],"optimizations":[73],"are":[74],"presented":[75],"in":[76],"paper":[78],"based":[79],"on":[80],"grouping":[81],"technology,":[82],"computer":[83],"science":[84],"other":[86],"novel":[87],"algorithms.":[88]},"counts_by_year":[{"year":2020,"cited_by_count":1},{"year":2015,"cited_by_count":1}],"updated_date":"2026-06-11T09:08:48.828518","created_date":"2025-10-10T00:00:00"}
