{"id":"https://openalex.org/W2153790667","doi":"https://doi.org/10.1109/efta.2007.4416895","title":"A study on automated scheduling methodology for machining job shop","display_name":"A study on automated scheduling methodology for machining job shop","publication_year":2007,"publication_date":"2007-01-01","ids":{"openalex":"https://openalex.org/W2153790667","doi":"https://doi.org/10.1109/efta.2007.4416895","mag":"2153790667"},"language":"en","primary_location":{"id":"doi:10.1109/efta.2007.4416895","is_oa":false,"landing_page_url":"https://doi.org/10.1109/efta.2007.4416895","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2007 IEEE Conference on Emerging Technologies &amp; Factory Automation (EFTA 2007)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5000252452","display_name":"Yoshihiro Yao","orcid":null},"institutions":[{"id":"https://openalex.org/I65837984","display_name":"Kobe University","ror":"https://ror.org/03tgsfw79","country_code":"JP","type":"education","lineage":["https://openalex.org/I65837984"]}],"countries":["JP"],"is_corresponding":true,"raw_author_name":"Yoshihiro Yao","raw_affiliation_strings":["Graduate School of Science and Technology, Kobe University, Kobe, Japan"],"affiliations":[{"raw_affiliation_string":"Graduate School of Science and Technology, Kobe University, Kobe, Japan","institution_ids":["https://openalex.org/I65837984"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5002511707","display_name":"Toshiya Kaihara","orcid":"https://orcid.org/0000-0001-7653-1236"},"institutions":[{"id":"https://openalex.org/I65837984","display_name":"Kobe University","ror":"https://ror.org/03tgsfw79","country_code":"JP","type":"education","lineage":["https://openalex.org/I65837984"]}],"countries":["JP"],"is_corresponding":false,"raw_author_name":"Toshiya Kaihara","raw_affiliation_strings":["Graduate School of Engineering, Kobe University, Kobe, Japan"],"affiliations":[{"raw_affiliation_string":"Graduate School of Engineering, Kobe University, Kobe, Japan","institution_ids":["https://openalex.org/I65837984"]}]},{"author_position":"middle","author":{"id":"https://openalex.org/A5026729772","display_name":"Kentaro Sashio","orcid":null},"institutions":[{"id":"https://openalex.org/I65837984","display_name":"Kobe University","ror":"https://ror.org/03tgsfw79","country_code":"JP","type":"education","lineage":["https://openalex.org/I65837984"]}],"countries":["JP"],"is_corresponding":false,"raw_author_name":"Kentaro Sashio","raw_affiliation_strings":["Graduate School of Engineering, Kobe University, Kobe, Japan"],"affiliations":[{"raw_affiliation_string":"Graduate School of Engineering, Kobe University, Kobe, Japan","institution_ids":["https://openalex.org/I65837984"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5113558775","display_name":"Susumu Fujii","orcid":null},"institutions":[{"id":"https://openalex.org/I42999171","display_name":"Sophia University","ror":"https://ror.org/01nckkm68","country_code":"JP","type":"education","lineage":["https://openalex.org/I42999171"]}],"countries":["JP"],"is_corresponding":false,"raw_author_name":"Susumu Fujii","raw_affiliation_strings":["Faculty of Science and Technolog, Sophia University, Chiyoda, Tokyo, Japan"],"affiliations":[{"raw_affiliation_string":"Faculty of Science and Technolog, Sophia University, Chiyoda, Tokyo, Japan","institution_ids":["https://openalex.org/I42999171"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":4,"corresponding_author_ids":["https://openalex.org/A5000252452"],"corresponding_institution_ids":["https://openalex.org/I65837984"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":7,"citation_normalized_percentile":{"value":0.19627768,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":89,"max":97},"biblio":{"volume":null,"issue":null,"first_page":"1018","last_page":"1023"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9797000288963318,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9797000288963318,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11814","display_name":"Advanced Manufacturing and Logistics Optimization","score":0.9782000184059143,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T12782","display_name":"Assembly Line Balancing Optimization","score":0.9239000082015991,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/rate-monotonic-scheduling","display_name":"Rate-monotonic scheduling","score":0.7613955736160278},{"id":"https://openalex.org/keywords/dynamic-priority-scheduling","display_name":"Dynamic priority scheduling","score":0.7511245608329773},{"id":"https://openalex.org/keywords/flow-shop-scheduling","display_name":"Flow shop scheduling","score":0.7312441468238831},{"id":"https://openalex.org/keywords/fair-share-scheduling","display_name":"Fair-share scheduling","score":0.7153506278991699},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6863831877708435},{"id":"https://openalex.org/keywords/two-level-scheduling","display_name":"Two-level scheduling","score":0.6640526652336121},{"id":"https://openalex.org/keywords/earliest-deadline-first-scheduling","display_name":"Earliest deadline first scheduling","score":0.537388265132904},{"id":"https://openalex.org/keywords/fixed-priority-pre-emptive-scheduling","display_name":"Fixed-priority pre-emptive scheduling","score":0.5024876594543457},{"id":"https://openalex.org/keywords/machining","display_name":"Machining","score":0.4961794316768646},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.4576018154621124},{"id":"https://openalex.org/keywords/least-slack-time-scheduling","display_name":"Least slack time scheduling","score":0.45072507858276367},{"id":"https://openalex.org/keywords/real-time-computing","display_name":"Real-time computing","score":0.4488237500190735},{"id":"https://openalex.org/keywords/lottery-scheduling","display_name":"Lottery scheduling","score":0.43689700961112976},{"id":"https://openalex.org/keywords/job-shop-scheduling","display_name":"Job shop scheduling","score":0.421022891998291},{"id":"https://openalex.org/keywords/industrial-engineering","display_name":"Industrial engineering","score":0.41799888014793396},{"id":"https://openalex.org/keywords/round-robin-scheduling","display_name":"Round-robin scheduling","score":0.4128056764602661},{"id":"https://openalex.org/keywords/distributed-computing","display_name":"Distributed computing","score":0.4036332070827484},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.21677902340888977},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.18792271614074707},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.10348892211914062},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.0866411030292511},{"id":"https://openalex.org/keywords/mechanical-engineering","display_name":"Mechanical engineering","score":0.07842504978179932},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.07092192769050598}],"concepts":[{"id":"https://openalex.org/C127456818","wikidata":"https://www.wikidata.org/wiki/Q238879","display_name":"Rate-monotonic scheduling","level":4,"score":0.7613955736160278},{"id":"https://openalex.org/C107568181","wikidata":"https://www.wikidata.org/wiki/Q5319000","display_name":"Dynamic priority scheduling","level":3,"score":0.7511245608329773},{"id":"https://openalex.org/C158336966","wikidata":"https://www.wikidata.org/wiki/Q3074426","display_name":"Flow shop scheduling","level":4,"score":0.7312441468238831},{"id":"https://openalex.org/C31689143","wikidata":"https://www.wikidata.org/wiki/Q733809","display_name":"Fair-share scheduling","level":3,"score":0.7153506278991699},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6863831877708435},{"id":"https://openalex.org/C119948110","wikidata":"https://www.wikidata.org/wiki/Q7858726","display_name":"Two-level scheduling","level":4,"score":0.6640526652336121},{"id":"https://openalex.org/C32310161","wikidata":"https://www.wikidata.org/wiki/Q666365","display_name":"Earliest deadline first scheduling","level":5,"score":0.537388265132904},{"id":"https://openalex.org/C122141398","wikidata":"https://www.wikidata.org/wiki/Q5456330","display_name":"Fixed-priority pre-emptive scheduling","level":5,"score":0.5024876594543457},{"id":"https://openalex.org/C523214423","wikidata":"https://www.wikidata.org/wiki/Q192047","display_name":"Machining","level":2,"score":0.4961794316768646},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.4576018154621124},{"id":"https://openalex.org/C132439773","wikidata":"https://www.wikidata.org/wiki/Q1810747","display_name":"Least slack time scheduling","level":5,"score":0.45072507858276367},{"id":"https://openalex.org/C79403827","wikidata":"https://www.wikidata.org/wiki/Q3988","display_name":"Real-time computing","level":1,"score":0.4488237500190735},{"id":"https://openalex.org/C112866106","wikidata":"https://www.wikidata.org/wiki/Q267053","display_name":"Lottery scheduling","level":5,"score":0.43689700961112976},{"id":"https://openalex.org/C55416958","wikidata":"https://www.wikidata.org/wiki/Q6206757","display_name":"Job shop scheduling","level":3,"score":0.421022891998291},{"id":"https://openalex.org/C13736549","wikidata":"https://www.wikidata.org/wiki/Q4489420","display_name":"Industrial engineering","level":1,"score":0.41799888014793396},{"id":"https://openalex.org/C175893541","wikidata":"https://www.wikidata.org/wiki/Q1196582","display_name":"Round-robin scheduling","level":4,"score":0.4128056764602661},{"id":"https://openalex.org/C120314980","wikidata":"https://www.wikidata.org/wiki/Q180634","display_name":"Distributed computing","level":1,"score":0.4036332070827484},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.21677902340888977},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.18792271614074707},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.10348892211914062},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.0866411030292511},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.07842504978179932},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.07092192769050598}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/efta.2007.4416895","is_oa":false,"landing_page_url":"https://doi.org/10.1109/efta.2007.4416895","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2007 IEEE Conference on Emerging Technologies &amp; Factory Automation (EFTA 2007)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"score":0.6600000262260437,"display_name":"Decent work and economic growth","id":"https://metadata.un.org/sdg/8"}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":7,"referenced_works":["https://openalex.org/W2103809088","https://openalex.org/W2136468906","https://openalex.org/W2165375541","https://openalex.org/W2325877829","https://openalex.org/W4231876318","https://openalex.org/W4238304571","https://openalex.org/W4240283284"],"related_works":["https://openalex.org/W2167574351","https://openalex.org/W2184166483","https://openalex.org/W1545991362","https://openalex.org/W2225350526","https://openalex.org/W2557471897","https://openalex.org/W3116619703","https://openalex.org/W2377713709","https://openalex.org/W3134500102","https://openalex.org/W2606983490","https://openalex.org/W1593612559"],"abstract_inverted_index":{"In":[0],"this":[1],"study,":[2],"scheduling":[3,11,21,35,50,77,94],"method":[4,71],"using":[5],"a":[6],"combination":[7],"of":[8,55,60,72,84],"auction-type":[9],"real-time":[10,34,49,76],"and":[12,36,42,58,87],"simulation":[13,37,73],"is":[14,30,67,96,99],"proposed":[15,103],"in":[16],"order":[17],"to":[18,108],"automate":[19,109],"the":[20,48,53,64,70,75,81,85,93,102,106],"for":[22,32,47],"machining":[23,110],"job":[24,111],"shop.":[25],"The":[26,44],"control":[27],"mechanism":[28],"which":[29,51,78],"essential":[31],"executing":[33],"simultaneously":[38],"has":[39,105],"been":[40],"developed":[41],"implemented.":[43],"auction":[45],"algorithm":[46],"improves":[52],"delay":[54],"delivery":[56],"date":[57],"amount":[59],"setup":[61],"time":[62,66],"at":[63],"same":[65],"investigated.":[68],"Also":[69],"during":[74],"can":[79],"predict":[80],"changing":[82],"situation":[83],"shop":[86,112],"automatically":[88],"take":[89],"countermeasures":[90],"by":[91],"adjusting":[92],"precondition":[95],"discussed.":[97],"It":[98],"clarified":[100],"that":[101],"system":[104],"ability":[107],"scheduling.":[113]},"counts_by_year":[{"year":2023,"cited_by_count":1},{"year":2020,"cited_by_count":1},{"year":2012,"cited_by_count":3}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
