{"id":"https://openalex.org/W3106943869","doi":"https://doi.org/10.1109/codit49905.2020.9263830","title":"Dynamic Scheduling with Unit Commitment, Constraints and Real Transmission Losses","display_name":"Dynamic Scheduling with Unit Commitment, Constraints and Real Transmission Losses","publication_year":2020,"publication_date":"2020-06-29","ids":{"openalex":"https://openalex.org/W3106943869","doi":"https://doi.org/10.1109/codit49905.2020.9263830","mag":"3106943869"},"language":"en","primary_location":{"id":"doi:10.1109/codit49905.2020.9263830","is_oa":false,"landing_page_url":"https://doi.org/10.1109/codit49905.2020.9263830","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2020 7th International Conference on Control, Decision and Information Technologies (CoDIT)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5009264756","display_name":"Hermagasantos Zein","orcid":"https://orcid.org/0000-0001-6163-7943"},"institutions":[{"id":"https://openalex.org/I134635517","display_name":"Bandung Institute of Technology","ror":"https://ror.org/00apj8t60","country_code":"ID","type":"education","lineage":["https://openalex.org/I134635517"]}],"countries":["ID"],"is_corresponding":true,"raw_author_name":"H. Zein","raw_affiliation_strings":["Energy Conversion Engineering Department, Bandung State Polytechnic (POLBAN), Bandung, Indonesia"],"affiliations":[{"raw_affiliation_string":"Energy Conversion Engineering Department, Bandung State Polytechnic (POLBAN), Bandung, Indonesia","institution_ids":["https://openalex.org/I134635517"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5030368338","display_name":"Conny K. Wachjoe","orcid":"https://orcid.org/0000-0003-3960-8745"},"institutions":[{"id":"https://openalex.org/I134635517","display_name":"Bandung Institute of Technology","ror":"https://ror.org/00apj8t60","country_code":"ID","type":"education","lineage":["https://openalex.org/I134635517"]}],"countries":["ID"],"is_corresponding":false,"raw_author_name":"C. K. Wachjoe","raw_affiliation_strings":["Energy Conversion Engineering Department, Bandung State Polytechnic (POLBAN), Bandung, Indonesia"],"affiliations":[{"raw_affiliation_string":"Energy Conversion Engineering Department, Bandung State Polytechnic (POLBAN), Bandung, Indonesia","institution_ids":["https://openalex.org/I134635517"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5009264756"],"corresponding_institution_ids":["https://openalex.org/I134635517"],"apc_list":null,"apc_paid":null,"fwci":0.0,"has_fulltext":false,"cited_by_count":0,"citation_normalized_percentile":{"value":0.11639363,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":null,"biblio":{"volume":"13","issue":null,"first_page":"1209","last_page":"1214"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11052","display_name":"Energy Load and Power Forecasting","score":0.998199999332428,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.996399998664856,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/economic-dispatch","display_name":"Economic dispatch","score":0.7968190312385559},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.6368429064750671},{"id":"https://openalex.org/keywords/generator","display_name":"Generator (circuit theory)","score":0.6337425708770752},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.6254820823669434},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.5205427408218384},{"id":"https://openalex.org/keywords/power-system-simulation","display_name":"Power system simulation","score":0.48062533140182495},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.36415863037109375},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.35829782485961914},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.0872223973274231}],"concepts":[{"id":"https://openalex.org/C187633118","wikidata":"https://www.wikidata.org/wiki/Q1317949","display_name":"Economic dispatch","level":4,"score":0.7968190312385559},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.6368429064750671},{"id":"https://openalex.org/C2780992000","wikidata":"https://www.wikidata.org/wiki/Q17016113","display_name":"Generator (circuit theory)","level":3,"score":0.6337425708770752},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.6254820823669434},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5205427408218384},{"id":"https://openalex.org/C116219307","wikidata":"https://www.wikidata.org/wiki/Q7236625","display_name":"Power system simulation","level":4,"score":0.48062533140182495},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.36415863037109375},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.35829782485961914},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.0872223973274231},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/codit49905.2020.9263830","is_oa":false,"landing_page_url":"https://doi.org/10.1109/codit49905.2020.9263830","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2020 7th International Conference on Control, Decision and Information Technologies (CoDIT)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[{"id":"https://metadata.un.org/sdg/7","display_name":"Affordable and clean energy","score":0.8799999952316284}],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":26,"referenced_works":["https://openalex.org/W1514445503","https://openalex.org/W1571403844","https://openalex.org/W1605651731","https://openalex.org/W1910570092","https://openalex.org/W1966554507","https://openalex.org/W2025535528","https://openalex.org/W2026903979","https://openalex.org/W2049822070","https://openalex.org/W2052078313","https://openalex.org/W2076423647","https://openalex.org/W2102612248","https://openalex.org/W2112592051","https://openalex.org/W2121100608","https://openalex.org/W2129897999","https://openalex.org/W2144733509","https://openalex.org/W2147185189","https://openalex.org/W2147408839","https://openalex.org/W2151766688","https://openalex.org/W2155510428","https://openalex.org/W2171480543","https://openalex.org/W2415128612","https://openalex.org/W3145407209","https://openalex.org/W3196376624","https://openalex.org/W4229785982","https://openalex.org/W4251695001","https://openalex.org/W6679575097"],"related_works":["https://openalex.org/W2034122571","https://openalex.org/W2754808369","https://openalex.org/W1903975","https://openalex.org/W1962574730","https://openalex.org/W2122133230","https://openalex.org/W2008468023","https://openalex.org/W1972673637","https://openalex.org/W2059353460","https://openalex.org/W1990602351","https://openalex.org/W2001523051"],"abstract_inverted_index":{"Scheduling":[0],"of":[1,10,25,30,38,47,94,118,123],"generator":[2,27,48,59,96,102,148,185,205],"units":[3,60,149,206],"must":[4,41,83,105],"lead":[5],"to":[6,100],"the":[7,15,26,31,45,58,63,71,91,101,119,124,143,147,151,159,166,171,176,184,188,199],"lowest":[8,51],"cost":[9,23,53,66,154],"electrical":[11],"energy":[12],"produced":[13],"and":[14,33,187,207],"shortest":[16],"computer":[17,139],"execution":[18],"time.":[19],"Dynamic":[20],"load,":[21],"fuel":[22,52,65],"variations":[24],"units,":[28],"existence":[29],"constraints":[32,103,186],"transmission":[34,81,161],"losses":[35,82,162],"are":[36,163],"some":[37],"problems":[39],"that":[40,61,104,113],"be":[42,55,85,106],"answered":[43],"in":[44,98],"scheduling":[46],"units.":[49],"The":[50,192],"will":[54],"achieved":[56],"if":[57],"have":[62],"highest":[64,152],"is":[67,155],"turned":[68,156],"off":[69],"from":[70],"power":[72,93,167,201],"system":[73,202],"under":[74],"low":[75],"load":[76],"conditions.":[77],"In":[78],"large":[79],"systems,":[80],"also":[84],"involved":[86],"as":[87],"it":[88,132],"can":[89],"exceed":[90],"maximum":[92],"a":[95,134],"unit,":[97],"addition":[99],"satisfied.":[107],"This":[108,180],"research":[109],"proposes":[110],"an":[111],"algorithm":[112,181],"has":[114,133,182,195],"considered":[115],"all":[116],"aspects":[117],"dynamic":[120],"scheduling.":[121],"Settlement":[122],"economic":[125,145,177],"dispatch":[126,178],"problem":[127],"using":[128,170],"direct":[129],"Method":[130],"because":[131],"very":[135],"short":[136],"time":[137],"for":[138],"execution.":[140],"Based":[141],"on":[142,175,198],"optimal":[144],"dispatch,":[146],"with":[150,203],"incremental":[153],"off.":[157],"While":[158],"real":[160],"determined":[164],"by":[165],"flow":[168],"calculation":[169],"fast-decoupled":[172],"method":[173,194],"based":[174],"results.":[179,210],"satisfied":[183],"ramp":[189],"rate":[190],"limits.":[191],"proposed":[193],"been":[196],"tested":[197],"23-bus":[200],"10":[204],"provides":[208],"satisfactory":[209]},"counts_by_year":[],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
