{"id":"https://openalex.org/W2548234508","doi":"https://doi.org/10.1109/asscc.2012.6523232","title":"Different load models based on particle swarm algorithm for the siting and sizing optimization problem for distributed power","display_name":"Different load models based on particle swarm algorithm for the siting and sizing optimization problem for distributed power","publication_year":2012,"publication_date":"2012-11-01","ids":{"openalex":"https://openalex.org/W2548234508","doi":"https://doi.org/10.1109/asscc.2012.6523232","mag":"2548234508"},"language":"en","primary_location":{"id":"doi:10.1109/asscc.2012.6523232","is_oa":false,"landing_page_url":"https://doi.org/10.1109/asscc.2012.6523232","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2012 10th International Power &amp; Energy Conference (IPEC)","raw_type":"proceedings-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5100682158","display_name":"Hui Wang","orcid":"https://orcid.org/0000-0001-6812-0285"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":true,"raw_author_name":"Wang Hui","raw_affiliation_strings":["School of Economics and Management, North China Electric Power University, Beijing, China"],"affiliations":[{"raw_affiliation_string":"School of Economics and Management, North China Electric Power University, Beijing, China","institution_ids":["https://openalex.org/I153473198"]}]},{"author_position":"last","author":{"id":"https://openalex.org/A5042458105","display_name":"Fangqiu Xu","orcid":"https://orcid.org/0000-0002-8112-2477"},"institutions":[{"id":"https://openalex.org/I153473198","display_name":"North China Electric Power University","ror":"https://ror.org/04qr5t414","country_code":"CN","type":"education","lineage":["https://openalex.org/I153473198"]}],"countries":["CN"],"is_corresponding":false,"raw_author_name":"Xu Fangqiu","raw_affiliation_strings":["School of Economics and Management, North China Electric Power University, Beijing, China"],"affiliations":[{"raw_affiliation_string":"School of Economics and Management, North China Electric Power University, Beijing, China","institution_ids":["https://openalex.org/I153473198"]}]}],"institutions":[],"countries_distinct_count":1,"institutions_distinct_count":2,"corresponding_author_ids":["https://openalex.org/A5100682158"],"corresponding_institution_ids":["https://openalex.org/I153473198"],"apc_list":null,"apc_paid":null,"fwci":0.491,"has_fulltext":false,"cited_by_count":3,"citation_normalized_percentile":{"value":0.71700456,"is_in_top_1_percent":false,"is_in_top_10_percent":false},"cited_by_percentile_year":{"min":90,"max":96},"biblio":{"volume":"31","issue":null,"first_page":"19","last_page":"24"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T10454","display_name":"Optimal Power Flow Distribution","score":0.9998999834060669,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10223","display_name":"Microgrid Control and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2207","display_name":"Control and Systems Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10424","display_name":"Electric Power System Optimization","score":0.9965999722480774,"subfield":{"id":"https://openalex.org/subfields/2208","display_name":"Electrical and Electronic Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/particle-swarm-optimization","display_name":"Particle swarm optimization","score":0.7949059009552002},{"id":"https://openalex.org/keywords/sizing","display_name":"Sizing","score":0.6933561563491821},{"id":"https://openalex.org/keywords/distributed-generation","display_name":"Distributed generation","score":0.6703469753265381},{"id":"https://openalex.org/keywords/distributed-power","display_name":"Distributed power","score":0.5705376863479614},{"id":"https://openalex.org/keywords/electric-power-system","display_name":"Electric power system","score":0.5557201504707336},{"id":"https://openalex.org/keywords/power","display_name":"Power (physics)","score":0.554132342338562},{"id":"https://openalex.org/keywords/ac-power","display_name":"AC power","score":0.528156042098999},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.5095279812812805},{"id":"https://openalex.org/keywords/voltage","display_name":"Voltage","score":0.4788667857646942},{"id":"https://openalex.org/keywords/reliability","display_name":"Reliability (semiconductor)","score":0.4691535234451294},{"id":"https://openalex.org/keywords/grid","display_name":"Grid","score":0.46768906712532043},{"id":"https://openalex.org/keywords/mathematical-optimization","display_name":"Mathematical optimization","score":0.44561317563056946},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.36927399039268494},{"id":"https://openalex.org/keywords/reliability-engineering","display_name":"Reliability engineering","score":0.3602622151374817},{"id":"https://openalex.org/keywords/electrical-engineering","display_name":"Electrical engineering","score":0.1919110119342804},{"id":"https://openalex.org/keywords/algorithm","display_name":"Algorithm","score":0.17815086245536804},{"id":"https://openalex.org/keywords/mathematics","display_name":"Mathematics","score":0.11641141772270203},{"id":"https://openalex.org/keywords/renewable-energy","display_name":"Renewable energy","score":0.10473766922950745}],"concepts":[{"id":"https://openalex.org/C85617194","wikidata":"https://www.wikidata.org/wiki/Q2072794","display_name":"Particle swarm optimization","level":2,"score":0.7949059009552002},{"id":"https://openalex.org/C2777767291","wikidata":"https://www.wikidata.org/wiki/Q1080291","display_name":"Sizing","level":2,"score":0.6933561563491821},{"id":"https://openalex.org/C544738498","wikidata":"https://www.wikidata.org/wiki/Q861135","display_name":"Distributed generation","level":3,"score":0.6703469753265381},{"id":"https://openalex.org/C36877392","wikidata":"https://www.wikidata.org/wiki/Q1229571","display_name":"Distributed power","level":3,"score":0.5705376863479614},{"id":"https://openalex.org/C89227174","wikidata":"https://www.wikidata.org/wiki/Q2388981","display_name":"Electric power system","level":3,"score":0.5557201504707336},{"id":"https://openalex.org/C163258240","wikidata":"https://www.wikidata.org/wiki/Q25342","display_name":"Power (physics)","level":2,"score":0.554132342338562},{"id":"https://openalex.org/C108755667","wikidata":"https://www.wikidata.org/wiki/Q1930258","display_name":"AC power","level":3,"score":0.528156042098999},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.5095279812812805},{"id":"https://openalex.org/C165801399","wikidata":"https://www.wikidata.org/wiki/Q25428","display_name":"Voltage","level":2,"score":0.4788667857646942},{"id":"https://openalex.org/C43214815","wikidata":"https://www.wikidata.org/wiki/Q7310987","display_name":"Reliability (semiconductor)","level":3,"score":0.4691535234451294},{"id":"https://openalex.org/C187691185","wikidata":"https://www.wikidata.org/wiki/Q2020720","display_name":"Grid","level":2,"score":0.46768906712532043},{"id":"https://openalex.org/C126255220","wikidata":"https://www.wikidata.org/wiki/Q141495","display_name":"Mathematical optimization","level":1,"score":0.44561317563056946},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.36927399039268494},{"id":"https://openalex.org/C200601418","wikidata":"https://www.wikidata.org/wiki/Q2193887","display_name":"Reliability engineering","level":1,"score":0.3602622151374817},{"id":"https://openalex.org/C119599485","wikidata":"https://www.wikidata.org/wiki/Q43035","display_name":"Electrical engineering","level":1,"score":0.1919110119342804},{"id":"https://openalex.org/C11413529","wikidata":"https://www.wikidata.org/wiki/Q8366","display_name":"Algorithm","level":1,"score":0.17815086245536804},{"id":"https://openalex.org/C33923547","wikidata":"https://www.wikidata.org/wiki/Q395","display_name":"Mathematics","level":0,"score":0.11641141772270203},{"id":"https://openalex.org/C188573790","wikidata":"https://www.wikidata.org/wiki/Q12705","display_name":"Renewable energy","level":2,"score":0.10473766922950745},{"id":"https://openalex.org/C62520636","wikidata":"https://www.wikidata.org/wiki/Q944","display_name":"Quantum mechanics","level":1,"score":0.0},{"id":"https://openalex.org/C142362112","wikidata":"https://www.wikidata.org/wiki/Q735","display_name":"Art","level":0,"score":0.0},{"id":"https://openalex.org/C153349607","wikidata":"https://www.wikidata.org/wiki/Q36649","display_name":"Visual arts","level":1,"score":0.0},{"id":"https://openalex.org/C121332964","wikidata":"https://www.wikidata.org/wiki/Q413","display_name":"Physics","level":0,"score":0.0},{"id":"https://openalex.org/C2524010","wikidata":"https://www.wikidata.org/wiki/Q8087","display_name":"Geometry","level":1,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1109/asscc.2012.6523232","is_oa":false,"landing_page_url":"https://doi.org/10.1109/asscc.2012.6523232","pdf_url":null,"source":null,"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"2012 10th International Power &amp; Energy Conference (IPEC)","raw_type":"proceedings-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"pdf":false,"grobid_xml":false},"content_urls":null,"referenced_works_count":11,"referenced_works":["https://openalex.org/W1971381892","https://openalex.org/W1976405499","https://openalex.org/W1978160127","https://openalex.org/W1983968772","https://openalex.org/W2025442227","https://openalex.org/W2057410152","https://openalex.org/W2060480712","https://openalex.org/W2066231530","https://openalex.org/W2071980313","https://openalex.org/W2086023651","https://openalex.org/W2110050136"],"related_works":["https://openalex.org/W2103508377","https://openalex.org/W2893865120","https://openalex.org/W2388819915","https://openalex.org/W2356568580","https://openalex.org/W4302545525","https://openalex.org/W1963867760","https://openalex.org/W2749793132","https://openalex.org/W1981663128","https://openalex.org/W2952879633","https://openalex.org/W2942667307"],"abstract_inverted_index":{"With":[0],"an":[1,19],"increasing":[2],"share":[3],"of":[4,15,29,36,65,74,97,110],"distributed":[5,16,37,69,99,111],"power":[6,8,17,30,38,45,70,78,112],"in":[7,119],"system,":[9],"the":[10,33,62,72,93,98,105,114],"siting":[11],"and":[12,27,60,76,86,95,108],"sizing":[13],"optimization":[14,53,73],"has":[18,39],"important":[20],"impact":[21],"on":[22,56],"system":[23,118],"current,":[24],"voltage":[25,81,121],"stability":[26],"reliability":[28],"supply.":[31],"Therefore,":[32],"rational":[34],"planning":[35],"become":[40],"a":[41,51],"major":[42],"concern":[43],"for":[44,68],"grid":[46],"enterprises.":[47],"This":[48],"paper":[49,103],"proposes":[50],"flexible":[52],"method":[54],"based":[55],"particle":[57],"swarm":[58],"optimization,":[59],"construct":[61],"multi-objective":[63],"function":[64],"synthetic":[66],"utility":[67],"from":[71],"active":[75],"reactive":[77],"loss":[79],"index,":[80,83,89],"distribution":[82],"MVA":[84],"capacity":[85,94],"short-circuit":[87],"level":[88],"thus":[90],"reasonably":[91],"determining":[92],"location":[96],"power.":[100],"Besides,":[101],"this":[102],"studies":[104],"optimal":[106],"site":[107],"size":[109],"with":[113],"38-bus":[115],"radial":[116],"test":[117],"independent":[120],"load":[122],"model":[123],"scenarios.":[124]},"counts_by_year":[{"year":2016,"cited_by_count":1},{"year":2014,"cited_by_count":2}],"updated_date":"2025-11-06T03:46:38.306776","created_date":"2025-10-10T00:00:00"}
