{"id":"https://openalex.org/W2074837693","doi":"https://doi.org/10.1080/09511920110059106","title":"MES (manufacturing execution system) architecture for FMS compatible to ERP (enterprise planning system)","display_name":"MES (manufacturing execution system) architecture for FMS compatible to ERP (enterprise planning system)","publication_year":2002,"publication_date":"2002-01-01","ids":{"openalex":"https://openalex.org/W2074837693","doi":"https://doi.org/10.1080/09511920110059106","mag":"2074837693"},"language":"en","primary_location":{"id":"doi:10.1080/09511920110059106","is_oa":false,"landing_page_url":"https://doi.org/10.1080/09511920110059106","pdf_url":null,"source":{"id":"https://openalex.org/S57062392","display_name":"International Journal of Computer Integrated Manufacturing","issn_l":"0951-192X","issn":["0951-192X","1362-3052"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310320547","host_organization_name":"Taylor & Francis","host_organization_lineage":["https://openalex.org/P4310320547","https://openalex.org/P4310320449"],"host_organization_lineage_names":["Taylor & Francis","Informa"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"International Journal of Computer Integrated Manufacturing","raw_type":"journal-article"},"type":"article","indexed_in":["crossref"],"open_access":{"is_oa":false,"oa_status":"closed","oa_url":null,"any_repository_has_fulltext":false},"authorships":[{"author_position":"first","author":{"id":"https://openalex.org/A5108393314","display_name":"Byoung K. Choi","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Byoung K. Choi","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]},{"author_position":"last","author":{"id":"https://openalex.org/A5056235951","display_name":"Byung H. Kim","orcid":null},"institutions":[],"countries":[],"is_corresponding":false,"raw_author_name":"Byung H. Kim","raw_affiliation_strings":[],"raw_orcid":null,"affiliations":[]}],"institutions":[],"countries_distinct_count":0,"institutions_distinct_count":0,"corresponding_author_ids":[],"corresponding_institution_ids":[],"apc_list":null,"apc_paid":null,"fwci":5.5887,"has_fulltext":false,"cited_by_count":77,"citation_normalized_percentile":{"value":0.9502008,"is_in_top_1_percent":false,"is_in_top_10_percent":true},"cited_by_percentile_year":{"min":94,"max":99},"biblio":{"volume":"15","issue":"3","first_page":"274","last_page":"284"},"is_retracted":false,"is_paratext":false,"is_xpac":false,"primary_topic":{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},"topics":[{"id":"https://openalex.org/T11159","display_name":"Manufacturing Process and Optimization","score":0.9995999932289124,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T10551","display_name":"Scheduling and Optimization Algorithms","score":0.9994000196456909,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}},{"id":"https://openalex.org/T11741","display_name":"Flexible and Reconfigurable Manufacturing Systems","score":0.9987000226974487,"subfield":{"id":"https://openalex.org/subfields/2209","display_name":"Industrial and Manufacturing Engineering"},"field":{"id":"https://openalex.org/fields/22","display_name":"Engineering"},"domain":{"id":"https://openalex.org/domains/3","display_name":"Physical Sciences"}}],"keywords":[{"id":"https://openalex.org/keywords/idef0","display_name":"IDEF0","score":0.7718006372451782},{"id":"https://openalex.org/keywords/manufacturing-execution-system","display_name":"Manufacturing execution system","score":0.6049187183380127},{"id":"https://openalex.org/keywords/flexible-manufacturing-system","display_name":"Flexible manufacturing system","score":0.5906664133071899},{"id":"https://openalex.org/keywords/schedule","display_name":"Schedule","score":0.5162701606750488},{"id":"https://openalex.org/keywords/architecture","display_name":"Architecture","score":0.49144446849823},{"id":"https://openalex.org/keywords/manufacturing-engineering","display_name":"Manufacturing engineering","score":0.47547808289527893},{"id":"https://openalex.org/keywords/machining","display_name":"Machining","score":0.47503191232681274},{"id":"https://openalex.org/keywords/engineering","display_name":"Engineering","score":0.44187408685684204},{"id":"https://openalex.org/keywords/computer-integrated-manufacturing","display_name":"Computer-integrated manufacturing","score":0.437773734331131},{"id":"https://openalex.org/keywords/process","display_name":"Process (computing)","score":0.41458308696746826},{"id":"https://openalex.org/keywords/computer-science","display_name":"Computer science","score":0.3973977267742157},{"id":"https://openalex.org/keywords/scheduling","display_name":"Scheduling (production processes)","score":0.30058297514915466},{"id":"https://openalex.org/keywords/operations-management","display_name":"Operations management","score":0.14330801367759705},{"id":"https://openalex.org/keywords/operating-system","display_name":"Operating system","score":0.11914274096488953},{"id":"https://openalex.org/keywords/mechanical-engineering","display_name":"Mechanical engineering","score":0.09374022483825684}],"concepts":[{"id":"https://openalex.org/C14740148","wikidata":"https://www.wikidata.org/wiki/Q2522551","display_name":"IDEF0","level":3,"score":0.7718006372451782},{"id":"https://openalex.org/C7923174","wikidata":"https://www.wikidata.org/wiki/Q1404943","display_name":"Manufacturing execution system","level":3,"score":0.6049187183380127},{"id":"https://openalex.org/C2777869240","wikidata":"https://www.wikidata.org/wiki/Q1424398","display_name":"Flexible manufacturing system","level":3,"score":0.5906664133071899},{"id":"https://openalex.org/C68387754","wikidata":"https://www.wikidata.org/wiki/Q7271585","display_name":"Schedule","level":2,"score":0.5162701606750488},{"id":"https://openalex.org/C123657996","wikidata":"https://www.wikidata.org/wiki/Q12271","display_name":"Architecture","level":2,"score":0.49144446849823},{"id":"https://openalex.org/C117671659","wikidata":"https://www.wikidata.org/wiki/Q11049265","display_name":"Manufacturing engineering","level":1,"score":0.47547808289527893},{"id":"https://openalex.org/C523214423","wikidata":"https://www.wikidata.org/wiki/Q192047","display_name":"Machining","level":2,"score":0.47503191232681274},{"id":"https://openalex.org/C127413603","wikidata":"https://www.wikidata.org/wiki/Q11023","display_name":"Engineering","level":0,"score":0.44187408685684204},{"id":"https://openalex.org/C53688548","wikidata":"https://www.wikidata.org/wiki/Q1122190","display_name":"Computer-integrated manufacturing","level":2,"score":0.437773734331131},{"id":"https://openalex.org/C98045186","wikidata":"https://www.wikidata.org/wiki/Q205663","display_name":"Process (computing)","level":2,"score":0.41458308696746826},{"id":"https://openalex.org/C41008148","wikidata":"https://www.wikidata.org/wiki/Q21198","display_name":"Computer science","level":0,"score":0.3973977267742157},{"id":"https://openalex.org/C206729178","wikidata":"https://www.wikidata.org/wiki/Q2271896","display_name":"Scheduling (production processes)","level":2,"score":0.30058297514915466},{"id":"https://openalex.org/C21547014","wikidata":"https://www.wikidata.org/wiki/Q1423657","display_name":"Operations management","level":1,"score":0.14330801367759705},{"id":"https://openalex.org/C111919701","wikidata":"https://www.wikidata.org/wiki/Q9135","display_name":"Operating system","level":1,"score":0.11914274096488953},{"id":"https://openalex.org/C78519656","wikidata":"https://www.wikidata.org/wiki/Q101333","display_name":"Mechanical engineering","level":1,"score":0.09374022483825684},{"id":"https://openalex.org/C153349607","wikidata":"https://www.wikidata.org/wiki/Q36649","display_name":"Visual arts","level":1,"score":0.0},{"id":"https://openalex.org/C142362112","wikidata":"https://www.wikidata.org/wiki/Q735","display_name":"Art","level":0,"score":0.0}],"mesh":[],"locations_count":1,"locations":[{"id":"doi:10.1080/09511920110059106","is_oa":false,"landing_page_url":"https://doi.org/10.1080/09511920110059106","pdf_url":null,"source":{"id":"https://openalex.org/S57062392","display_name":"International Journal of Computer Integrated Manufacturing","issn_l":"0951-192X","issn":["0951-192X","1362-3052"],"is_oa":false,"is_in_doaj":false,"is_core":true,"host_organization":"https://openalex.org/P4310320547","host_organization_name":"Taylor & Francis","host_organization_lineage":["https://openalex.org/P4310320547","https://openalex.org/P4310320449"],"host_organization_lineage_names":["Taylor & Francis","Informa"],"type":"journal"},"license":null,"license_id":null,"version":"publishedVersion","is_accepted":true,"is_published":true,"raw_source_name":"International Journal of Computer Integrated Manufacturing","raw_type":"journal-article"}],"best_oa_location":null,"sustainable_development_goals":[],"awards":[],"funders":[],"has_content":{"grobid_xml":false,"pdf":false},"content_urls":null,"referenced_works_count":19,"referenced_works":["https://openalex.org/W617675225","https://openalex.org/W1513878086","https://openalex.org/W1924575730","https://openalex.org/W1966174368","https://openalex.org/W1971803885","https://openalex.org/W1974357326","https://openalex.org/W1976451809","https://openalex.org/W1986731000","https://openalex.org/W1991645405","https://openalex.org/W2010063115","https://openalex.org/W2017205077","https://openalex.org/W2021628807","https://openalex.org/W2025799390","https://openalex.org/W2027455973","https://openalex.org/W2096898057","https://openalex.org/W2123780688","https://openalex.org/W2131897627","https://openalex.org/W2537014484","https://openalex.org/W4230250511"],"related_works":["https://openalex.org/W2154320603","https://openalex.org/W2152072926","https://openalex.org/W2126073371","https://openalex.org/W2137024548","https://openalex.org/W2125583834","https://openalex.org/W1594915931","https://openalex.org/W580829546","https://openalex.org/W2074837693","https://openalex.org/W616333959","https://openalex.org/W2118951673"],"abstract_inverted_index":{"Presented":[0],"in":[1],"the":[2,53,67,75,118,121],"paper":[3],"is":[4,11,38,56,61,83,98,124],"MES":[5,50,60,123],"(manufacturing":[6],"execution":[7],"system)":[8,18],"architecture,":[9],"which":[10],"suitable":[12],"for":[13,103],"managing":[14],"FMS":[15,36,76,131],"(flexible":[16],"manufacturing":[17],"lines":[19],"under":[20],"an":[21,29,35,72],"ERP":[22],"(enterprise":[23],"planning":[24],"system)environment.":[25],"An":[26],"IDEF0-model":[27],"of":[28,44,63,81,111,120],"'order":[30],"handling'":[31],"shop":[32,69],"floor":[33],"having":[34],"line":[37,136],"developed":[39],"to":[40,88,129],"identify":[41],"functional":[42,54],"requirements":[43,55],"MES,":[45],"and":[46,71,92,105,113,117,137],"then":[47],"a":[48,64,86,93,101,133,138],"two-tier":[49],"architecture":[51],"satisfying":[52],"proposed.":[57],"The":[58],"proposed":[59,122],"composed":[62],"Main-MES":[65],"(for":[66,74],"main":[68],"floor)":[70],"FMS-MES":[73],"line).":[77],"A":[78],"BOP":[79,112],"(bill":[80],"processes)":[82],"used":[84,99],"as":[85,100],"means":[87],"represent":[89],"process":[90],"plans,":[91],"LS-Net":[94,114],"(loading":[95],"schedule":[96],"network)":[97],"mechanism":[102],"representing":[104],"manipulating":[106],"loading":[107],"schedules.":[108],"Object":[109],"models":[110],"are":[115],"presented,":[116],"effectiveness":[119],"demonstrated":[125],"by":[126],"applying":[127],"it":[128],"two":[130],"lines,":[132],"stamping-die":[134],"machining":[135,141],"mechanical":[139],"part":[140],"line.":[142]},"counts_by_year":[{"year":2026,"cited_by_count":4},{"year":2024,"cited_by_count":4},{"year":2023,"cited_by_count":2},{"year":2022,"cited_by_count":5},{"year":2020,"cited_by_count":4},{"year":2019,"cited_by_count":4},{"year":2018,"cited_by_count":4},{"year":2017,"cited_by_count":2},{"year":2015,"cited_by_count":3},{"year":2014,"cited_by_count":5},{"year":2013,"cited_by_count":4},{"year":2012,"cited_by_count":5}],"updated_date":"2026-08-15T07:11:24.734988","created_date":"2025-10-10T00:00:00"}
